KSC-00pp0905

As part of Crew Equipment Interface Test (CEIT) activities, members of the STS-92 crew check out equipment they will be using on the mission to the International Space Station. Mission Specialists Michael Lopez-Alegria (center) and Jeff Wisoff (right) talk with Boeing technicians about the Integrated Truss Structure Z1, a component of the Station and payload on STS-92, in front of them. The Z1 truss is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A

As part of Crew Equipment Interface Test (CEIT) activities, members of the STS-92 crew check out equipment they will be using on the mission to the International Space Station. Mission Specialists Michael Lopez-Alegria (center) and Jeff Wisoff (right) talk with Boeing technicians about the Integrated Truss Structure Z1, a component of the Station and payload on STS-92, in front of them. The Z1 truss is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A