CAPE CANAVERAL, Fla. - At the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, the members of the STS-129 crew line up beside the Astrovan for a portrait in their launch-and-entry suits. The six astronauts for space shuttle Atlantis’ STS-129 mission are en route to their launch dress rehearsal, the Terminal Countdown Demonstration Test, at Launch Pad 39A. From left are Mission Specialists Robert L. Satcher Jr., Mike Foreman, Randy Bresnik and Leland Melvin; Pilot Barry E. Wilmore; and Commander Charles O. Hobaugh. Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket. Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16. On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett