KSC-97PC996

The Space Shuttle Orbiter Discovery in Orbiter  Processing Facility 2 begins its rollover on top of the orbiter transporter to the Vehicle  Assembly Building for mating with its external tank and solid rocket boosters in  preparation for the STS-85 mission. Several payloads will be aboard Discovery during the  11-day mission, including the Manipulator Flight Demonstration (MFD) and the   Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet  Satellite-2 (CRISTA-SPAS-2), as well as the Technology Applications and Science-1  (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments

The Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2 begins its rollover on top of the orbiter transporter to the Vehicle Assembly Building for mating with its external tank and solid rocket boosters in preparation for the STS-85 mission. Several payloads will be aboard Discovery during the 11-day mission, including the Manipulator Flight Demonstration (MFD) and the Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2), as well as the Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments