KENNEDY SPACE CENTER, FLA. -- Inside the Operations and Checkout Building, overhead cranes lift another segment of the International Space Station (ISS), the port-side P3 truss, from its shipping container. The truss is scheduled to be added to the ISS on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The second port truss segment, P3 will be attached to the first port truss segment (P1).
Location Kennedy Space Center, FL
Date November 17, 1999