KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, an overhead crane lifts the P3 Integrated Truss Structure out of the payload canister that transferred it from the Operations and Checkout Building. The port-side P3 truss is scheduled to be added to the International Space Station on mission STS-115 in 2002 aboard Space Shuttle Atlantis. The P3 will be attached to the first port truss segment, P1, being installed in an earlier mission.
Location Kennedy Space Center, FL
Date March 19, 2001