CEVIS Installation on LAB1P3 Rack

iss048e004552 (6/20/2016) --- Image taken to document re-installation of the Cycle Ergometer with Vibration Isolation and Stabilization (CEVIS) at LAB1P3 following inflight maintenance (IFM) on the Direct Current to Direct Current Converter Unit-1 (DDCU-1) Rack. Image was taken in the Destiny U.S. Laboratory.

Photographer Jeff Williams