In Orbiter Processing Facility bay 2, technicians James Johnson (left) and Jesus Rodrigues install a leading edge subsystem carrier panel on the right wing of Endeavour. The orbiter is scheduled for mission STS-118, targeted for launch on June 28. The mission will be the 22nd flight to the International Space Station, carrying another starboard array, S5, for installation.
Installing a Carrier Panel on Endeavor in OPF 2
In Orbiter Processing Facility bay 2, technicians on a Hyster forklift maneuver space shuttle main engine no. 3 into place on Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. The orbiter is scheduled for mission STS-118, targeted for launch on June 28. The mission will be the 22nd flight to the International Space Station, carrying another starboard array, S5, for installation.
Space Shuttle Main Engine 3 install in Endeavor
In Orbiter Processing Facility bay 2, technicians on a Hyster forklift maneuver space shuttle main engine no. 3 into place on Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. The orbiter is scheduled for mission STS-118, targeted for launch on June 28. The mission will be the 22nd flight to the International Space Station, carrying another starboard array, S5, for installation.
Space Shuttle Main Engine 3 install in Endeavor
In Orbiter Processing Facility bay 2, technicians Jesus Rodrigues (left) and James Johnson install a leading edge subsystem carrier panel on the right wing of Endeavour. The orbiter is scheduled for mission STS-118, targeted for launch on June 28. The mission will be the 22nd flight to the International Space Station, carrying another starboard array, S5, for installation.
Installing a Carrier Panel on Endeavor in OPF 2
In Orbiter Processing Facility bay 2, technicians on a Hyster forklift install space shuttle main engine no. 3 into Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. The orbiter is scheduled for mission STS-118, targeted for launch on June 28. The mission will be the 22nd flight to the International Space Station, carrying another starboard array, S5, for installation.
Space Shuttle Main Engine 3 install in Endeavor
T&R/Endeavour Final Power Down
2012-2739
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-2003
T&R Endeavour Airlock Removal
2012-2505
Discovery T & R, Oms Pod Rotate for Removal
2011-3016
T&R Endeavour Airlock Removal
2012-2498
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2429
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T & R Discovery, Right OMS Pod Removal
2011-3026
T&R/Endeavour Final Power Down
2012-2735
T & R Discovery, Right OMS Pod Removal
2011-3027
T&R/Endeavour Final Power Down
2012-2741
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2425
T&R Endeavour Airlock Removal
2012-2501
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2395
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-1999
T&R/Endeavour Fuel Cells Removed
2012-3104
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T & R Discovery, Right OMS Pod Removal
2011-3030
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-2001
T&R Endeavour Airlock Removal
2012-2495
T&R Endeavour Airlock Removal
2012-2502
Discovery T & R, Oms Pod Rotate for Removal
2011-3015
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2397
T&R/Endeavour Fuel Cells Removed
2012-3107
T&R/Endeavour Fuel Cells Removed
2012-3108
Discovery T & R, Oms Pod Rotate for Removal
2011-3014
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2430
T&R/Endeavour Final Power Down
2012-2736
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2392
T & R Discovery, Right OMS Pod Removal
2011-3024
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2428
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2432
T & R Discovery, Right OMS Pod Removal
2011-3031
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2433
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2422
T & R Discovery, Right OMS Pod Removal
2011-3023
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-2002
T&R/Endeavour Final Power Down
2012-2743
T&R/Endeavour Fuel Cells Removed
2012-3110
Discovery T & R, Oms Pod Rotate for Removal
2011-3020
T&R Endeavour Airlock Removal
2012-2503
T&R/Endeavour Final Power Down
2012-2746
T & R Discovery, Right OMS Pod Removal
2011-3032
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2427
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
Discovery T & R, Oms Pod Rotate for Removal
2011-3017
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2424
Discovery T & R, Oms Pod Rotate for Removal
2011-3022
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2431
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2394
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2426
T&R/Endeavour Final Power Down
2012-2738
T & R Discovery, Right OMS Pod Removal
2011-3033
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T&R Endeavour Airlock Removal
2012-2504
Discovery T & R, Oms Pod Rotate for Removal
2011-3013
Discovery T & R, Oms Pod Rotate for Removal
2011-3019
T&R/Endeavour Fuel Cells Removed
2012-3103
T&R/Endeavour Final Power Down
2012-2740
T&R/Endeavour Final Power Down
2012-2742
Discovery T & R, Oms Pod Rotate for Removal
2011-3021
T&R/Endeavour Fuel Cells Removed
2012-3109
T&R/Endeavour Final Power Down
2012-2745
Discovery/T&R FRCS Removal & Lift to Transporter
2011-2423
T&R/Endeavour Fuel Cells Removed
2012-3106
T&R Endeavour Airlock Removal
2012-2497
T&R Endeavour Airlock Removal
2012-2499
T&R ENDEAVOUR - FINAL PAYLOAD BAY (PLB) DOOR CLOSURE
T&R ENDEAVOUR FINAL PLB DOOR CLOSURE
T & R Discovery, Right OMS Pod Removal
2011-3029
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2400
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2396
T&R Endeavour Airlock Removal
2012-2500
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-2000
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2401
Discovery T & R, Oms Pod Rotate for Removal
2011-3018
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2399
STS-133 ENDEAVOUR TIRES AND BRAKES REMOVAL
2010-2004
T & R Discovery, Right OMS Pod Removal
2011-3025
T&R/Endeavour Fuel Cells Removed
2012-3105
T&R Endeavour Airlock Removal
2012-2494
Discovery T&R, Right Hand Inner Heat Shield Removal from Engine #1
2011-2398
T&R/Endeavour Final Power Down
2012-2744