CAPE CANAVERAL, Fla. -- A technician completes the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves out of high bay 2 of the Vehicle Assembly Building where it has been undergoing modifications. The test drive is designed to check out modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves away from the Vehicle Assembly Building where it has been undergoing modifications. The test dive is designed to check out modifications to ensure its ability to carry the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves out of high bay 2 of the Vehicle Assembly Building where it has been undergoing modifications. The test drive is designed to check out modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 has been undergoing modifications inside high bay 2 of the Vehicle Assembly Building in preparation to carry the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are removing cover plates in preparation for replacing the roller bearing assemblies on crawler-transporter 2, or CT-2. The modifications are designed to ensure CT-2's ability to transport launch vehicles currently in development, such as the agency's Space Launch System which will send the Orion spacecraft carrying humans to new destinations in the solar system. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings.html Photo credit: NASA/Tim Jacobs

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, prepare to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA_Dimitri Gerondidakis

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are preparing to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are jacking crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 has been undergoing modifications in high bay 2 of the Vehicle Assembly Building. It has been undergoing a test drive checking out modifications to ensure its ability to carry the space agency's Space Launch System heavy-lift rocket to the launch pad. In the background is the mobile launcher being prepared to support launch vehicles such as space agency's the Space Launch System heavy-lift rocket and Orion spacecraft. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a space shuttle era mobile launcher platform, on the left, sits on pedestals outside the Vehicle Assembly Building. To the right is the mobile launcher that will support the space agency's Space Launch System heavy-lift rocket and Orion spacecraft. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- As crawler-transporter No. 2 moves out of high bay 2 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, technicians keep watch. The crawler-transporter test drive is designed to check out recent modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, prepare to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, begin jacking crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are removing cover plates in preparation for replacing the roller bearing assemblies on crawler-transporter 2, or CT-2. The modifications are designed to ensure CT-2's ability to transport launch vehicles currently in development, such as the agency's Space Launch System which will send the Orion spacecraft carrying humans to new destinations in the solar system. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings.html Photo credit: NASA/Tim Jacobs

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a technician uses a fork lift to remove track shoes from crawler-transporter 2, or CT-2, prior to jacking it four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are removing cover plates in preparation for replacing the roller bearing assemblies on crawler-transporter 2, or CT-2. The modifications are designed to ensure CT-2's ability to transport launch vehicles currently in development, such as the agency's Space Launch System which will send the Orion spacecraft carrying humans to new destinations in the solar system. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings.html Photo credit: NASA/Tim Jacobs

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are removing cover plates in preparation for replacing the roller bearing assemblies on crawler-transporter 2, or CT-2. The modifications are designed to ensure CT-2's ability to transport launch vehicles currently in development, such as the agency's Space Launch System which will send the Orion spacecraft carrying humans to new destinations in the solar system. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings.html Photo credit: NASA/Tim Jacobs

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, prepare crawler-transporter 2, or CT-2, for removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information: http:__www.nasa.gov_exploration_systems_ground_crawler-transporter_bearings.html Photo credit: NASA_Tim Jacobs

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, crawler-transporter 2, or CT-2, has been jacked four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information: http:__www.nasa.gov_exploration_systems_ground_crawler-transporter_bearings.html Photo credit: NASA_Tim Jacobs

CAPE CANAVERAL, Fla. -- A truck sprays water on the gravel crawler way at NASA's Kennedy Space Center in Florida as crawler-transporter No. 2 moves toward Launch Pad 39A. With crawler-transporter modifications complete, the test drive is designed to check out modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 is parked outside of the Vehicle Assembly Building. The Crawler-transporter has been undergoing modifications to ensure its ability to carry the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- A technician installs a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are removing track shoes from crawler-transporter 2, or CT-2, prior to jacking it four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Ben Smegelsky

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, prepare to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA_Dimitri Gerondidakis

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 has been undergoing modifications in high bay 2 of the Vehicle Assembly Building. It has been undergoing a test drive checking out modifications to ensure its ability to carry launch vehicles to the launch pad. In the background is the mobile launcher being prepared to support the space agency's Space Launch System heavy-lift rocket and Orion spacecraft. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in the Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- Bill Couch, standing on the left, and Gary Milbourne, both of United Space Alliance monitor the updated controls of crawler-transporter No. 2 as it moves out of high bay 2 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The test drive is designed to check out recent modifications and upgrades to ensure its capability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are preparing to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are jacking crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves away from the Vehicle Assembly Building where it has been undergoing modifications. The test drive is designed to check out modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves past the Vehicle Assembly Building where it has been undergoing modifications. The test drive is designed to check out modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the mobile launcher is being prepared to support the space agency's Space Launch System heavy-lift rocket and Orion spacecraft. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are removing track shoes from crawler-transporter 2, or CT-2, prior to jacking it four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a tractor levels out the gravel after the six-million-pound crawler-transporter passed by on its way from the Vehicle Assembly Building to Launch Pad 39A. The test drive is designed to check out recently completed modifications to ensure the crawler-transporter's ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Ben Smegelsky

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, prepare to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, prepare crawler-transporter 2, or CT-2, for removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information: http:__www.nasa.gov_exploration_systems_ground_crawler-transporter_bearings.html Photo credit: NASA_Tim Jacobs

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, technicians monitor the progress as crawler-transporter 2, or CT-2, is moved from the Vehicle Assembly Building to the Park Site west of the building. The transporter has new brakes and mufflers and a recently-painted white roof deck. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- Technicians keep watch as crawler-transporter No. 2 moves along the crawler way at NASA's Kennedy Space Center in Florida. The crawler-transporter test dive is designed to check out recent modifications to ensure its ability to carry the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves out of high bay 2 of the Vehicle Assembly Building where it has been undergoing modifications. The test drive is designed to check out modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are jacking crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are preparing to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, prepare to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA_Dimitri Gerondidakis

CAPE CANAVERAL, Fla. -- United Space Alliance Project Manager Mike Parrish sits in the driver's position of crawler-transporter No. 2 which has been undergoing modifications inside high bay 2 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The upgrades are designed to ensure the crawler-transporter can carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves along the crawler way toward Launch Pad 39A following modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- A truck sprays water on the gravel crawler way at NASA's Kennedy Space Center in Florida as crawler-transporter No. 2 moves out of high bay 2 of the Vehicle Assembly Building. With crawler-transporter modifications complete, the test drive is designed to check out modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a technician positions a jack to lift crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, crawler-transporter 2, or CT-2, has been jacked four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information: http:__www.nasa.gov_exploration_systems_ground_crawler-transporter_bearings.html Photo credit: NASA_Tim Jacobs

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida the mobile launcher is being prepared to support the space agency's Space Launch System heavy-lift rocket and Orion spacecraft. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- Steady progress is made on the installation of new bearings on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- The team that has been modifying crawler-transporter No. 2 inside high bay 2 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida gathered prior to a test drive. The crawler-transporter has been undergoing modifications in preparation to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Ben Smegelsky

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are removing cover plates in preparation for replacing the roller bearing assemblies on crawler-transporter 2, or CT-2. The modifications are designed to ensure CT-2's ability to transport launch vehicles currently in development, such as the agency's Space Launch System which will send the Orion spacecraft carrying humans to new destinations in the solar system. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings.html Photo credit: NASA/Tim Jacobs

CAPE CANAVERAL, Fla. -- A technician completes the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- Technicians complete the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves out of high bay 2 of the Vehicle Assembly Building where it has been undergoing modifications. The test dive is designed to check out modifications to ensure its ability to carry the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- The installation of new bearings on crawler-transporter 2 is underway in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- A truck sprays water on the gravel crawler way at NASA's Kennedy Space Center in Florida as crawler-transporter No. 2 moves out of high bay 2 of the Vehicle Assembly Building. With crawler-transporter modifications complete, the test drive is designed to check out modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Ben Smegelsky

CAPE CANAVERAL, Fla. -- Preparations are underway to install new bearings on crawler-transporter 2 in the Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, prepare to jack crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are removing cover plates in preparation for replacing the roller bearing assemblies on crawler-transporter 2, or CT-2. The modifications are designed to ensure CT-2's ability to transport launch vehicles currently in development, such as the agency's Space Launch System which will send the Orion spacecraft carrying humans to new destinations in the solar system. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings.html Photo credit: NASA/Tim Jacobs

CAPE CANAVERAL, Fla. -- A technician installs a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. -- The installation of new bearings on crawler-transporter 2 is underway in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a road-grader resurfaces a section of the crawlerway leading from the Vehicle Assembly Building VAB to the launch pads. The Ground Systems Development and Operations GSDO Program office at Kennedy is working to upgrade the two 40-foot-wide pathways the crawler-transporter will travel as it transports launch vehicles such as NASA's Space Launch System SLS rocket from the VAB to the launch pad. For more: http:__www.nasa.gov_exploration_systems_ground_crawlerway_upgrades.html Photo credit: NASA_Jim Grossman

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, screening equipment is operating to separate pulverized Alabama river rock from stones still usable in the crawlerway leading from the Vehicle Assembly Building VAB to the launch pads. The rock no longer suitable for the crawlerway will be reused in other areas of the spaceport. After years of wear from the weight of space shuttles being transported to the launch pads, the crawlerway was in need of resurfacing in preparation for future programs. The Ground Systems Development and Operations GSDO Program office at Kennedy is working to upgrade the two 40-foot-wide pathways the crawler-transporter will travel as it transports vehicles such as NASA's Space Launch System SLS rocket from the VAB to the launch pad. For more: http:__www.nasa.gov_exploration_systems_ground_crawlerway_upgrades.html Photo credit: NASA_Jim Grossmann

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, screening equipment is operating to separate pulverized Alabama river rock from stones still usable in the crawlerway leading from the Vehicle Assembly Building VAB to the launch pads. The rock no longer suitable for the crawlerway will be reused in other areas of the spaceport. After years of wear from the weight of space shuttles being transported to the launch pads, the crawlerway was in need of resurfacing in preparation for future programs. The Ground Systems Development and Operations GSDO Program office at Kennedy is working to upgrade the two 40-foot-wide pathways the crawler-transporter will travel as it transports vehicles such as NASA's Space Launch System SLS rocket from the VAB to the launch pad. For more: http:__www.nasa.gov_exploration_systems_ground_crawlerway_upgrades.html Photo credit: NASA_Jim Grossmann

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, screening equipment is operating to separate pulverized Alabama river rock from stones still usable in the crawlerway leading from the Vehicle Assembly Building VAB to the launch pads. The rock no longer suitable for the crawlerway will be reused in other areas of the spaceport. After years of wear from the weight of space shuttles being transported to the launch pads, the crawlerway was in need of resurfacing in preparation for future programs. The Ground Systems Development and Operations GSDO Program office at Kennedy is working to upgrade the two 40-foot-wide pathways the crawler-transporter will travel as it transports vehicles such as NASA's Space Launch System SLS rocket from the VAB to the launch pad. For more: http:__www.nasa.gov_exploration_systems_ground_crawlerway_upgrades.html Photo credit: NASA_Jim Grossmann