STS-27 Atlantis, Orbiter Vehicle (OV) 104, is suspended via overhead crane, attached at four points, in the Kennedy Space Center (KSC) Vehicle Assembly Building (VAB). Below OV-104 on the mobile launcher platform are the external tank (ET) and solid rocket boosters (SRBs). During ET/SRB mating operations, OV-104 will be mounted atop the ET.
STS-27 Atlantis, OV-104, ET/SRB mating operations at KSC VAB
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3044
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3041
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is positioned between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3052
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is being lowered between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3049
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lifted from its test cell for transfer to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3036
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers guide external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lowered into high bay-1 between the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3047
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank for space shuttle Atlantis' STS-135 mission, ET-138, is prepared for transfer from its test cell to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3034
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lowered into high bay-1 between the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3050
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers guide external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lowered into high bay-1 between the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3048
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is transferred to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3039
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lifted from its test cell for transfer to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3038
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lowered into high bay-1 between the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3046
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lifted from its test cell for transfer to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3037
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3043
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is transferred to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3040
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3042
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3053
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3051
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank for space shuttle Atlantis' STS-135 mission, ET-138, is prepared for transfer from its test cell to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3035
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lowered into high bay-1 between the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller
KSC-2011-3045
S88-41541 (7 July 1988) --- STS-26 Discovery, Orbiter Vehicle (OV) 103, is suspended by overhead crane and large frame attached to vehicle at four points. A ground-level view shows OV-103 during operations to accomplish its mating to two solid rocket boosters (SRBs) and an external fuel tank (ET) in the vehicle assembly building (VAB) at the Kennedy Space Center (KSC). From this step OV-103 will be lifted vertically and hoisted high inside the VAB for mating with the already connected ET and SRBs. In less than two weeks, the combined components will be rolled to Pad 39B atop a mobile launch platform.
STS-26 Discovery, Orbiter Vehicle (OV) 103, ET/SRB mating in KSC VAB
S88-37367 (March 28, 1988)  --- The external tank (ET) for STS-27 arrived at Kennedy Space Center (KSC) today via ocean going barge and was moved into the Vehicle Assembly Building (VAB) where preparations will soon begin to ready it for the second return flight launch of the Space Shuttle.  The tank is 154 feet long, 27.5 feet in diameter, and holds a total of 1,585,379 pounds of liquid oxygen and liquid hydrogen fuel - fuel which is used by the orbiter's main engines during launch.  The empty burnt orange colored tank weighs 1,667,677 pounds and is the only piece of flight hardware not recovered for reuse.
STS-27 external tank (ET) transfer into KSC's VAB
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1484
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1486
STS-134 ET-122 XFER TO VAB
2010-4908
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1488
STS-134 ET-122 INSIGNIA - VAB
2010-4905
STS-134 ET-122 XFER TO VAB
2010-4912
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1487
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1483
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1482
STS-134 ET-122 INSIGNIA - VAB
2010-4904
STS-134 ET-122 XFER TO VAB
2010-4907
STS-134 ET-122 XFER TO VAB
2010-4909
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1479
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1481
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1485
STS-131 ET LIFT & MATE TO SRB'S IN VAB
2010-1480
STS-134 ET-122 INSIGNIA - VAB
2010-4906
STS-134 ET-122 XFER TO VAB
2010-4910
STS-134 ET-122 XFER TO VAB
2010-4911
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4072
STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB
2010-1972
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3207
STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB
2010-1968
STS-133 Discovery Preps for ET-137 Work in VAB
STS-133
STS-133 Discovery X-ray scans ET-137 in VAB
STS-133
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4074
STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB
2010-1971
STS-133 Discovery Preps for ET-137 Work in VAB
STS-133
STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB
2010-1970
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3208
STS-131 ET-135 Offload from Barge & Xfer to VAB
2010-1004
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4075
STS-133 Discovery Preps for ET-137 Work in VAB
STS-133
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3200
STS-133 Discovery X-ray scans ET-137 in VAB
STS-133
STS-133 Discovery Preps for ET-137 Work in VAB
STS-133
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4071
STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB
2010-1967
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3202
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3206
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3201
STS-133 Discovery Preps for ET-137 Work in VAB
STS-133
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3204
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4070
STS-131 ET-135 Offload from Barge & Xfer to VAB
2010-1007
STS-133 Discovery Preps for ET-137 Work in VAB
STS-133
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4069
STS-131 ET-135 Offload from Barge & Xfer to VAB
2010-1000
STS-131 ET-135 Offload from Barge & Xfer to VAB
2010-1008
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3205
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4073
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4066
STS-133 Discovery X-ray scans ET-137 in VAB
STS-133
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4067
STS-133 Discovery Preps for ET-137 Work in VAB
STS-133
STS-131 ET-135 Offload from Barge & Xfer to VAB
2010-1006
STS-131 ET-135 Offload from Barge & Xfer to VAB
2010-1001
STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB
2010-1969
STS-133 Discovery X-ray scans ET-137 in VAB
STS-133
STS-133 Discovery X-ray scans ET-137 in VAB
STS-133
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4076
STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB
2010-4068
STS-133 Discovery Preps for ET-137 Work in VAB
STS-133
STS-131 ET-135 Offload from Barge & Xfer to VAB
2010-1003
STS-133 ET-137 OFFLOAD FROM BARGE AND XFER TO VAB
2010-3199
STS-133 Discovery X-ray scans ET-137 in VAB
STS-133
CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, workers check the progress of external fuel tank ET-131 as it is lowered into a high bay for checkout. ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1826
CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, external fuel tank ET-131 has been lifted into the upper levels and is moving above a high bay.  The fuel tank will be lowered onto a stand for checkout.  ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1822
CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, external fuel tank ET-131 is being raised to a vertical position.  It will be lifted into the upper levels and lowered into a checkout bay.  ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1819
CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, workers check the progress of external fuel tank ET-131 as it is lowered into a high bay for checkout. ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1824
CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, external fuel tank ET-131 is suspended by a crane over the transfer aisle. It will be lifted into the upper levels and lowered into a checkout bay.  ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1820
CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, external fuel tank ET-131 is being lowered into a high bay for checkout.  ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1823
CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, external fuel tank ET-131 is lifted from its transporter.  It will be raised to vertical and then lifted into the upper levels and lowered into a checkout bay.  ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1818
CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, workers check the progress of external fuel tank ET-131 as it is lowered into a high bay for checkout. ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1825
CAPE CANAVERAL, Fla. – The suspension of external fuel tank ET-131 over the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida is viewed from an upper level.  The fuel tank will be lifted into the upper levels and lowered into a high bay for checkout. ET-131 will be used on space shuttle Endeavour's  STS-127 mission.  Payload for the mission is the Japanese Experiment Module's Experiment Logistics Module-Exposed Section, or ELM-ES.  Launch is targeted for June.  Photo credit: NASA/Kim Shiflett
KSC-2009-1821
STS-335 LON ET-122 OFFLOAD FROM PEGASUS BARGE AND XFER TO VAB
2010-4898
STS-335 LON ET-122 OFFLOAD FROM PEGASUS BARGE AND XFER TO VAB
2010-4891