NASA employees, led by flag-bearer Marquell D. Proctor from Bishop Macnamara High School, march along Pennsylvania Avenue during the inaugural parade honoring President Barack Obama, Monday, Jan. 21. 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
The Orion space capsule is seen as it rolls down Pennsylvania Avenue during the inaugural parade honoring President Barack Obaama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Carla Cioffi)
2013 Inaugural Parade
The Orion space capsule is seen as it rolls down Pennsylvania Avenue during the inaugural parade honoring President Barack Obaama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Carla Cioffi)
2013 Inaugural Parade
President Barack Obama waves as he walks along Pennsylvania Avenue during the inaugural parade, Monday, Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
A replica of NASA's Curiosity Rover and members of the Mars Science Laboratory (MSL) science team pass the Presidential viewing stand and President Barack Obama during the inaugural parade honoring Obama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
Vice President Joe Biden and his wife Jill wave as they arrive in the reviewing stand for the inaugural parade, Monday, Jan. 21, 2013, in Washington. President Barack Obama and Biden had their ceremonial swearing-in earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
A replica of NASA's Curiosity Rover and members of the Mars Science Laboratory (MSL) science team pass the Presidential viewing stand and President Barack Obama during the inaugural parade honoring Obama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
First lady Michelle Obama waves as she walks along Pennsylvania Avenue during the inaugural parade, Monday, Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
The Orion space capsule along with NASA Astronauts Lee Morin, Alvin Drew, Kjell Lindgren, Serena Aunon, Kate Rubins, and Mike Massimino pass the Presidential viewing stand and President Barack Obama during the inaugural parade honoring Obama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
The Orion space capsule along with NASA Astronauts Lee Morin, Alvin Drew, Kjell Lindgren, Serena Aunon, Kate Rubins, and Mike Massimino pass the Presidential viewing stand and President Barack Obama during the inaugural parade honoring Obama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
The Orion space capsule is seen as it rolls down Pennsylvania Avenue during the inaugural parade honoring President Barack Obama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Carla Cioffi)
2013 Inaugural Parade
The Orion space capsule is seen as it rolls down Pennsylvania Avenue during the inaugural parade honoring President Barack Obama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Carla Cioffi)
2013 Inaugural Parade
Actress Eva Longoria, Co-Chair of the Presidential Inaugural Committee, speaks at the National Day of Service on the National Mall, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
Vice President Joe Biden and his wife Jill wave as they walk along Pennsylvania Avenue during the inaugural parade, Monday, Jan. 21, 2013, in Washington. President Barack Obama and Biden had their ceremonial swearing-in earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
President Barack Obama kisses first lady Michelle Obama while seated in the presidential reviewing stand during the inaugural parade, Monday, Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
Members of The U.S. Army Band, Herald Trumpets Ensemble, look to make sure their feet are on markers in front of the Preidential viewing stand ahead of the 2013 Inauguration Parade, Monday, Jan. 21, 2013 in Washington.  President Barack Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credt: (NASA/Bill Ingalls)
2013 Inaugural Parade
Musician Ben Folds performs at the the National Day of Service on the National Mall, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
The U.S. Army, Old Guard Fife and Drum Corps marches past the the Presidential viewing stand during the inaugural parade honoring President Barack Obama, Monday Jan. 21, 2013, in Washington. Obama was sworn-in as the nation's 44th President earlier in the day. Photo Credit: (NASA/Bill Ingalls)
2013 Inaugural Parade
NASA Astronaut Kate Rubins signs autographs at the NASA booth set up on the National Mall as part of the National Day of Service, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
NASA Astronaut Lee Morin, a veteran of space shuttle mission STS-110, signs autographs at the NASA booth set up on the National Mall as part of the National Day of Service, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
NASA Astronaut Kate Rubins smiles for the camera while signing autographs at the NASA booth set up on the National Mall as part of the National Day of Service, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
As part of the National Day of Service people visit the NASA booth set up on the National Mall, Saturday, January 19, 2013, in Washington. Astronaut Kjell Lindgren, left, is seen talking to a member of the public. NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
American gospel singer Yolanda Adams, known as the first lady of modern gospel, sings at the the National Day of Service on the National Mall, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
Astronauts Mike Massimino, top center, and Alvin Drew, top right, sign autographs at the NASA booth set up on the National Mall as part of the National Day of Service, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
As part of the National Day of Service people visit the NASA booth set up on the National Mall, Saturday, January 19, 2013, in Washington. Astronaut Kjell Lindgren, right, is seen talking to a member of the public. NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
Astronauts Mike Massimino, left, and Alvin Drew sign autographs at the NASA booth set up on the National Mall as part of the National Day of Service, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
Astronauts Mike Massimino, left, and Alvin Drew pose for the camera at the NASA booth set up on the National Mall as part of the National Day of Service, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
NASA Astronaut Alvin Drew, left, signs autographs at the NASA booth set up on the National Mall as part of the National Day of Service, Saturday, January 19, 2013, in Washington.  NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
As part of the National Day of Service people visit the NASA booth set up on the National Mall, Saturday, January 19, 2013, in Washington. Astronaut Serena Auñon, left, is seen talking to a member of the public. NASA along with other federal agencies set up along the Mall as part of events surrounding the inauguration of President Barack Obama. Photo Credit: (NASA/Carla Cioffi)
National Day of Service
Parade goers enjoy the music of street musicians outside a metro stop after attending the inaugural parade honoring  President Barack Obama, Monday, Jan. 21, 2013, in Washington. Photo Credit: (NASA/Paul E. Alers)
2013 Inaugural Parade
A woman bundled up for the cold temperatures makes a picture with here mobile device as she waits for the Inaugural Parade honoring President Barack Obama, Monday, Jan. 21, 2013, in Washington. Photo Credit: (NASA/Paul E. Alers)
2013 Inaugural Parade
A parade-goer holds dressed in a Stars and Stripes coat waves a flag while watching the 2013 Inaugural Parade honoring President Barack Obama, Monday, Jan. 21, 2013, along Pennsylvania Avenue in Washington. Photo Credit : (NASA/Paul E. Alers)
2013 Inaugural Parade
The presidential limousine is seen traveling up Pennsylvania Avenue soon after President Barack Obama departed the White House for Capitol Hill and the swearing-in of Obama as the nation's 44th President, Monday, Jan. 21, 2013, in Washington. Photo Credit: (NASA/Carla Cioffi)
2013 Inaugural Parade
Ken Wheeler and his daughter Kayla listen intently to President Barack Obama's speech following his swearing in as they stand along Pennsylvania Avenue in Washington, Monday, Jan. 21, 2013. The Wheeler's traveled from Cincinnati, Ohio to attend the event. Photo Credit: (NASA/Paul E. Alers)
2013 Inaugural Parade
Parade goers shop for souvenirs from a street vendor prior to the swearing in ceremony of President Barack Obama, Monday, Jan. 21, 2013, in Washington. Street vendors lined the streets of Washington, Monday to commemorate the nation's 44th President. Photo Credit: (NASA/Paul E. Alers)
2013 Inaugural Parade
ISS013-E-48869 (6 July 2006) --- Astronauts Stephanie D. Wilson (left) and Lisa M. Nowak, both missions for STS-121,  check out camera gear during their personal inaugural space flights and during their first day onboard the International Space Station.
Wilson and Nowak check on camera equipment in the U.S. Laboratory during Expedition 13 and STS-121 joint operations
Former first daughter Chelsea Clinton kicks off the National Day of Service on the National Mall, Saturday, January 19, 2013, in Washington.  She urged Americans to get involved in service projects in their communities. Clinton will serve as honorary chair of the 2013 National Day of Service.  Photo Credit:  (NASA/Carla Cioffi)
National Day of Service
Former first daughter Chelsea Clinton kicks off the National Day of Service on the National Mall, Saturday, January 19, 2013, in Washington.  She urged Americans to get involved in service projects in their communities. Clinton will serve as honorary chair of the 2013 National Day of Service.  Photo Credit:  (NASA/Carla Cioffi)
National Day of Service
Smiling, STS-100 Mission Specialist Yuri V. Lonchakov waves as he suits up for launch in the Operations and Checkout Building. Lonchakov is with the Russian Aviation and Space Agency. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0812
STS-100 Mission Specialist Chris A. Hadfield is ready for launch after suiting up in the Operations and Checkout Building. Hadfield is with the Canadian Space Agency. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0813
STS110-S-055 (19 April 2002) --- With its drag chute gear deployed, the Space Shuttle Atlantis eases to a stop on the runway at the KSC landing facility to complete the nearly 11-day STS-110 journey.   Astronaut Michael J. Bloomfield, mission commander, eased Atlantis to a textbook landing on runway 3-3 at the Florida spaceport at 12:27 p.m. (EDT), April 19,  2002, under clear skies and light winds.   The landing completed a 4.5-million-mile mission that saw successful delivery and  installation of the centerpiece of the International Space Station?s main truss and the inaugural run of the first space railcar, the Mobile Transporter.
sts110-s-055
STS-100 Mission Specialist John L. Phillips is fully suited for launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0815
STS110-S-057 (19 April 2002) --- The  Space Shuttle Atlantis heads for touchdown on the runway at the KSC landing facility to complete the nearly 11-day STS-110 journey.   Astronaut Michael J. Bloomfield, mission commander, eased Atlantis to a textbook landing on runway 3-3 at the Florida spaceport at 12:27 p.m. (EDT), April 19,  2002, under clear skies and light winds.   The landing completed a 4.5-million-mile mission that saw successful delivery and  installation of the centerpiece of the International Space Station?s main truss and the inaugural run of the first space railcar, the Mobile Transporter.
sts110-s-057
STS110-S-039 (19 April 2002) --- The Space Shuttle Atlantis heads for touchdown on the runway at the KSC landing facility to complete a nearly 11-day journey. Astronaut  Michael J. Bloomfield, mission commander, eased Atlantis to a textbook landing on runway 3-3 at the Florida spaceport at 12:27 p.m. (EDT), April 19, 2002,   under clear skies and light winds.  The landing completed a  4.5-million-mile mission that saw successful delivery and installation of the centerpiece  of the International Space Station’s main truss and the inaugural run of the first space railcar, the Mobile Transporter.
STS110-s-039
Happy to be suiting up for launch, STS-100 Mission Specialist Umberto Guidoni gives thumbs up. Guidoni is with the European Space Agency. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0811
STS110-S-039 (19 April 2002) --- The Space Shuttle Atlantis heads for touchdown on the runway at the KSC landing facility to complete a nearly 11-day journey. Astronaut Michael J. Bloomfield, mission commander, eased Atlantis to a textbook landing on runway 3-3 at the Florida spaceport at 12:27 p.m. (EDT), April 19, 2002, under clear skies and light winds. The landing completed a 4.5-million-mile mission that saw successful delivery and installation of the centerpiece of the International Space Station’s main truss and the inaugural run of the first space railcar, the Mobile Transporter.
Space Shuttle Atlantis Landing
A suit technician helps STS-100 Commander Kent V. Rominger adjust his helmet during suitup for launch in the Operations and Checkout Building. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0814
Smiling, STS-100 Mission Specialist Scott E. Parazynski gives thumbs up for launch as he suits up in the Operations and Checkout Building. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS, which will be performed by Parazynski and Mission Specialist Chris A. Hadfield. The mission is also the inaugural flight of Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0817
KENNEDY SPACE CENTER, FLA. -- STS-100 Mission Specialist Yuri V. Lonchakov stands near Launch Pad 39A to greet family and friends. Lonchakov is with the Russian Aviation and Space Agency. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet_Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply_return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01PADIG-193
STS-100 Pilot Jeffrey S. Ashby gives a silent greeting to his wife, Paige, during suitup for launch in the Operations and Checkout Building. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS, which will be performed by Mission Specialists Scott E. Parazynski and Chris A. Hadfield. The mission is also the inaugural flight of Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0816
NASA's Terra spacecraft (right) is prepared for encapsulation in the rocket faring (left) before launch at Vandenberg AFB, Calif. The faring displays a logo of the many science instruments that make up Terra. The spacecraft's launch aboard a Lockheed Martin Atlas IIAS rocket is scheduled for Dec. 16 from Space Launch Complex 3 East at Vandenberg. Terra comprises five state-of-the-art sets of instruments that will collect data for continuous, long-term records of the state of Earth's land, oceans and atmosphere. Together with data from other satellite systems launched by NASA and other countries, Terra will inaugurate a new self-consistent data record that will be gathered over the next 15 years. From an altitude of 438 miles, Terra will circle the Earth 16 times a day from pole to pole (98 degree inclination), crossing the equator at 10:30 a.m. The five Terra instruments will operate by measuring sunlight reflected by the Earth and heat emitted by the Earth
KSC-99pp1410
Workers at Vandenberg AFB, Calif., help prepare NASA's Terra spacecraft (right) for encapsulation in the rocket faring (left). Terra is expected to be launched aboard a Lockheed Martin Atlas IIAS rocket Dec. 16 from Space Launch Complex 3 East at Vandenberg. Terra comprises five state-of-the-art sets of instruments that will collect data for continuous, long-term records of the state of Earth's land, oceans and atmosphere. Together with data from other satellite systems launched by NASA and other countries, Terra will inaugurate a new self-consistent data record that will be gathered over the next 15 years. From an altitude of 438 miles, Terra will circle the Earth 16 times a day from pole to pole (98 degree inclination), crossing the equator at 10:30 a.m. The five Terra instruments will operate by measuring sunlight reflected by the Earth and heat emitted by the Earth
KSC-99pp1412
KENNEDY SPACE CENTER, FLA. -- STS-100 Mission Specialist Umberto Guidoni stands near Launch Pad 39A to greet family and friends. Guidoni is with the European Space Agency. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC01padig194
The rocket faring (left) displays a logo of the many science instruments that make up NASA's Terra spacecraft (background). When fully assembled, Terra will be encapsulated in the faring before launch, scheduled for Dec. 16 aboard a Lockheed Martin Atlas IIAS rocket from Space Launch Complex 3 East at Vandenberg AFB, Calif. Terra comprises five state-of-the-art sets of instruments that will collect data for continuous, long-term records of the state of Earth's land, oceans and atmosphere. Together with data from other satellite systems launched by NASA and other countries, it will inaugurate a new self-consistent data record that will be gathered over the next 15 years. From an altitude of 438 miles, Terra will circle the Earth 16 times a day from pole to pole (98 degree inclination), crossing the equator at 10:30 a.m. The five Terra instruments will operate by measuring sunlight reflected by the Earth and heat emitted by the Earth
KSC-99pp1415
The STS-100 crew gathers for a snack and photo before suiting up for launch. Seated around the table, from left, are Mission Specialists Umberto Guidoni, Chris A. Hadfield and John L. Phillips; Commander Kent V. Rominger; Mission Specialist Yuri V. Lonchakov; Pilot Jeffrey S. Ashby; and Mission Specialist Scott E. Parazynski. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0807
NASA's Terra spacecraft awaits installation of the instruments that will collect data for continuous, long-term records of the state of Earth's land, oceans and atmosphere. Terra is expected to be launched aboard a Lockheed Martin Atlas IIAS rocket Dec. 16 from Space Launch Complex 3 East at Vandenberg AFB, Calif. Terra comprises five state-of-the-art sets of instruments that, together with data from other satellite systems launched by NASA and other countries, will inaugurate a new self-consistent data record that will be gathered over the next 15 years. From an altitude of 438 miles, Terra will circle the Earth 16 times a day from pole to pole (98 degree inclination), crossing the equator at 10:30 a.m. The five Terra instruments will operate by measuring sunlight reflected by the Earth and heat emitted by the Earth
KSC-99pp1414
KENNEDY SPACE CENTER, FLA. -- STS-100 Mission Specialist Chris A. Hadfield stands near Launch Pad 39A to greet family and friends. Hadfield is with the Canadian Space Agency. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet_Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply_return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01PADIG-192
Workers (left) at Vandenberg AFB, Calif., get ready to prepare NASA's Terra spacecraft (right) for encapsulation in the rocket faring (left) before launch. The spacecraft is expected to be launched Dec. 16 aboard a Lockheed Martin Atlas IIAS rocket from the AFB's Space Launch Complex 3 East. Terra comprises five state-of-the-art sets of instruments that will collect data for continuous, long-term records of the state of Earth's land, oceans and atmosphere. Together with data from other satellite systems launched by NASA and other countries, Terra will inaugurate a new self-consistent data record that will be gathered over the next 15 years. From an altitude of 438 miles, Terra will circle the Earth 16 times a day from pole to pole (98 degree inclination), crossing the equator at 10:30 a.m. The five Terra instruments will operate by measuring sunlight reflected by the Earth and heat emitted by the Earth
KSC-99pp1411
KENNEDY SPACE CENTER, FLA. -- STS-100 Commander Kent V. Rominger stands near Launch Pad 39A to greet family and friends. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC01padig197
NASA's Terra spacecraft (foreground) is ready for encapsulation in the rocket faring behind it. Terra is expected to be launched aboard a Lockheed Martin Atlas IIAS rocket Dec. 16 from Space Launch Complex 3 East at Vandenberg AFB, Calif. Terra comprises five state-of-the-art sets of instruments that will collect data for continuous, long-term records of the state of Earth's land, oceans and atmosphere. Together with data from other satellite systems launched by NASA and other countries, Terra will inaugurate a new self-consistent data record that will be gathered over the next 15 years. From an altitude of 438 miles, Terra will circle the Earth 16 times a day from pole to pole (98 degree inclination), crossing the equator at 10:30 a.m. The five Terra instruments will operate by measuring sunlight reflected by the Earth and heat emitted by the Earth
KSC-99pp1413
KENNEDY SPACE CENTER, FLA. -- STS-100 Pilot Jeffrey S. Ashby stands near Launch Pad 39A to greet family and friends. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC01padig195
KENNEDY SPACE CENTER, FLA. -- STS-100 Mission Specialist Yuri V. Lonchakov stands near Launch Pad 39A to greet family and friends. Lonchakov is with the Russian Aviation and Space Agency. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC01padig193
KENNEDY SPACE CENTER, FLA. -- STS-100 Mission Specialist Umberto Guidoni stands near Launch Pad 39A to greet family and friends. Guidoni is with the European Space Agency. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet_Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply_return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01PADIG-194
KENNEDY SPACE CENTER, FLA. -- STS-100 Mission Specialist Scott E. Parazynski stands near Launch Pad 39A to greet family and friends. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet_Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply_return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01PADIG-196
KENNEDY SPACE CENTER, FLA. -- STS-100 Commander Kent V. Rominger stands near Launch Pad 39A to greet family and friends. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet_Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply_return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01PADIG-197
KENNEDY SPACE CENTER, FLA. -- STS-100 Pilot Jeffrey S. Ashby stands near Launch Pad 39A to greet family and friends. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet_Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply_return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01PADIG-195
The rocket faring is lifted up the launch tower for mating with the Lockheed Martin Atlas IIAS rocket after encapsulation of Terra, formerly EOS AM-1. It is scheduled for launch Dec. 16 from Space Launch Complex 3 East at Vandenberg AFB, Calif. Terra comprises five state-of-the-art sets of instruments that will collect data for continuous, long-term records of the state of Earth's land, oceans and atmosphere. Together with data from other satellite systems launched by NASA and other countries, it will inaugurate a new self-consistent data record that will be gathered over the next 15 years. From an altitude of 438 miles, Terra will circle the Earth 16 times a day from pole to pole (98 degree inclination), crossing the equator at 10:30 a.m. The five Terra instruments will operate by measuring sunlight reflected by the Earth and heat emitted by the Earth
KSC-99pp1416
KENNEDY SPACE CENTER, FLA. -- The STS-100 crew gives thumbs up on launch as they gather near Launch Pad 39A to greet family and friends. Starting at left, they are Mission Specialists Chris A. Hadfield, John L. Phillips and Umberto Guidoni; Commander Kent V. Rominger; Pilot Jeffrey S. Ashby; and Mission Specialists Scott E. Parazynski and Yuri V. Lonchakov. Hadfield is with the Canadian Space Agency; Guidoni is with the European Space Agency; and Lonchakov is with the Russian Aviation and Space Agency. In the background on the pad can be seen the tips of Space Shuttle Endeavour’s orange external tank and white solid rocket boosters. The 80-foot lightning rod towers above the Shuttle and service structures. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC01padig198
The STS-100 crew walks out of the Operations and Checkout Building on their way to Launch Pad 39A and liftoff for an 11-day mission to the International Space Station. Leading in front are Pilot Jeffrey S. Ashby (left) and Commander Kent V. Rominger (right). Behind them are (left to right) Mission Specialists Umberto Guidoni, Yuri Lonchakov and Chris A. Hadfield. Following in the rear are Mission Specialists Scott E. Parazynski (left) and John L. Phillips (right). An international crew, Guidoni represents the European Space Agency, Lonchakov the Russian Aviation and Space Agency and Hadfield the Canadian Space Agency. Space Shuttle Endeavour and its crew will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS, which will be performed by Parazynski and Hadfield. The mission is also the inaugural flight of Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff of Space Shuttle Endeavour on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01pp0818
KENNEDY SPACE CENTER, FLA. -- The STS-100 crew gives thumbs up on launch as they gather near Launch Pad 39A to greet family and friends. Starting at left, they are Mission Specialists Chris A. Hadfield, John L. Phillips and Umberto Guidoni; Commander Kent V. Rominger; Pilot Jeffrey S. Ashby; and Mission Specialists Scott E. Parazynski and Yuri V. Lonchakov. Hadfield is with the Canadian Space Agency; Guidoni is with the European Space Agency; and Lonchakov is with the Russian Aviation and Space Agency. In the background on the pad can be seen the tips of Space Shuttle Endeavour’s orange external tank and white solid rocket boosters. The 80-foot lightning rod towers above the Shuttle and service structures. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet_Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply_return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
KSC-01PADIG-198