STS-26 Discovery, Orbiter Vehicle (OV) 103, with nose landing gear (NLG) and main landing gear (MLG) deployed glides above dry lakebed runway 17 at Edwards Air Force Base (EAFB), California. This profile view shows OV-103's port side just before MLG touchdown.
STS-26 Discovery, OV-103, with landing gear deployed glides above EAFB runway
STS038-S-041 (20 Nov 1990) --- STS-38 Atlantis, Orbiter Vehicle (OV) 104, lands on runway 33 at Kennedy Space Center (KSC) Shuttle Landing Facility (SLF). The main landing gear (MLG) has just touched down on the runway surface as the nose landing gear (NLG) glides above it. The Department of Defense (DOD)-devoted mission came to an end (with complete wheel stop) at 4:43:37 pm (Eastern Standard Time (EST)).
STS-38 Atlantis, Orbiter Vehicle (OV) 104, lands on runway 33 at KSC SLF
STS-41 Discovery, Orbiter Vehicle (OV) 103, with nose landing gear (NLG) and main landing gear (MLG) deployed, glides over concrete runway 22 at Edwards Air Force Base (EAFB), California, prior to touchdown.
STS-41 Discovery, OV-103, glides over concrete runway 22 at EAFB, California
STS-34 Atlantis, Orbiter Vehicle (OV) 104, main landing gear (MLG) touches down on Runway 23 dry lake bed at Edwards Air Force Base (EAFB), California. The nose landing gear rides above runway before touchdown as the MLG wheels produce a cloud of dust. OV-104's port side profile is captured as it glides by at a speed of approximately 195 knots (224 miles per hour). The tail section with deployed speedbrake/rudder and space shuttle main engines (SSMEs) are visible.
STS-34 Atlantis, OV-104, touches down on runway 23 at EAFB, California
STS-50 Columbia's, Orbiter Vehicle (OV) 102's, main landing gear touches down on runway 33 at the Kennedy Space Center (KSC) Shuttle Landing Facility (SLF) producing a small cloud of dust. Landing occurred at 7:42 am (Eastern Daylight Time (EDT)). In this view of the OV-102's starboard side, the nose landing gear (NLG) continues to ride above the runway surface. Florida vegetation, a runway sign, and runway lights appear in the foreground.
STS-50 Columbia, Orbiter Vehicle (OV) 102, lands on runway 33 at KSC SLF
STS-45 Atlantis, Orbiter Vehicle (OV) 104, lands on concrete runway 33 at the Kennedy Space Center's (KSC's) Shuttle Landing Facility (SLF). The main landing gear (MLG) touched down at 6:23:06 am (Eastern Standard Time (EST)) in the early morning Florida fog as seen in these views. The deployed nose landing gear (NLG) rides above the runway before wheel stop.
STS-45 Atlantis, Orbiter Vehicle (OV) 104, lands on runway 33 at KSC SLF
STS-43 Atlantis, Orbiter Vehicle (OV) 104, lands on runway 15 at the Kennedy Space Center's (KSC's) Shuttle Landing Facility (SLF). The main landing gear (MLG) touched down at 8:23:25 am (Eastern Daylight Time (EDT)). OV-104 glides toward wheel stop as the nose landing gear (NLG) rides above the runway.
STS-43 Atlantis, Orbiter Vehicle (OV) 104, lands on runway 15 at KSC's SLF
STS-41 Discovery, Orbiter Vehicle (OV) 103, with nose landing gear (NLG) and main landing gear (MLG) deployed, glides over concrete runway 22 at Edwards Air Force Base (EAFB), California, prior to touchdown.
STS-41 Discovery, OV-103, glides over concrete runway 22 at EAFB, California
STS029-S-063 (18 March 1989) --- Discovery's main landing gear touches down on Runway 22 at Edwards Air Force Base in California following a successful five-day mission in Earth orbit.  Onboard the spacecraft were Astronauts Michael L. Coats, John E. Blaha, James F. Buchli, Robert C. Springer and James P. Bagian.  Wheels came to a stop at 6:36:40 a.m. (PST), March 18, 1989.
STS-29 Discovery, OV-103, lands on Edwards AFB concrete runway 22
STS-32 Columbia, Orbiter Vehicle (OV) 102, is captured as its main landing gear (MLG) touches down on runway 22 at Edwards Air Force Base (EAFB), California, in the early morning darkness. The night landing ended a record 11-day mission in space. Moments later, at 1:36:38 am Pacific Standard Time (PST), OV-102 came to a complete stop, having logged 4,509,972 miles in flight.
STS-32 Columbia, OV-102, makes night landing on runway 22 at EAFB, California
STS-28 Columbia, Orbiter Vehicle (OV) 102, approaches Runway 17 dry lake bed at Edwards Air Force Base (EAFB) California and is photographed just moments before main landing gear (MLG) touchdown. In the distance, are peaks of Southern California mountain range.
STS-28 Columbia, OV-102, landing at Edwards Air Force Base (EAFB) California
The Space Shuttle Columbia, Orbiter Vehicle (OV) 102, its drag chute fully deployed, completes a record duration mission as it lands on Runway 33 at the Kennedy Space Center (KSC) Shuttle Landing Facility (SLF). A helicopter flying overhead observes as OV-102's nose landing gear (NLG) and main landing gear (MLG) roll along the runway. Landing occurred at 6:38 am (Eastern Daylight Time (EDT)). STS-65 mission duration was 14 days 17 hours and 56 minutes. Onboard were six NASA astronauts and a Japanese payload specialist who conducted experiments in support of the International Microgravity Laboratory 2 (IML-2) during the mission.
STS-65 Columbia, OV-102, with drag chute deployed lands at KSC SLF
STS058-S-128 (1 Nov 1993) --- The nose gear of the Space Shuttle Columbia is about to touch down on the runway at Edwards Air Force Base (EAFB) in California.  The landing, which occurred at 7:06 a.m. (PST), November 1, 1993, completed a two week mission in space devoted to medical research.  Onboard the spacecraft were astronauts John E. Blaha, Richard A. Searfoss, Rhea Seddon, Shannon W. Lucid, David A. Wolf and William S. McArthur along with payload specialist Martin J. Fettman, DVM.
The landing of STS-58 Columbia, OV-102, at Edwards Air Force Base
STS-31 Discovery, Orbiter Vehicle (OV) 103, rolls along concrete runway 22 at Edwards Air Force Base (EAFB), California, after nose landing gear (NLG) and main landing gear (MLG) touchdown. This view looks down OV-103's port side from the space shuttle main engines (SSMEs) to the nose section. The SSMEs are gimbaled to their descent position and the rudder/speedbrake is deployed on the vertical stabilizer. Wheel stop occurred at 6:51 am (Pacific Daylight Time (PDT)). In the distance EAFB facilities are visible.
STS-31 Discovery, Orbiter Vehicle (OV) 103, lands on EAFB concrete runway 22
STS-53 Discovery, Orbiter Vehicle (OV) 103, is slowed by a red, white, and blue drag chute during its landing on concrete runway 22 at Edwards Air Force Base (EAFB), California. Main landing gear (MLG) touchdown occurred at 12:43:17 pm (Pacific Standard Time (PST)). This aft view of OV-103 shows the drag chute deployed from its compartment at the base of the vertical tail, the speedbrake/rudder flaps open, and the space shuttle main engines (SSMEs). Both MLG and nose landing gear (NLG) ride along the runway surface. Desert scrub brush appears in the foreground and mountains are seen in the background.
STS-53 Discovery, Orbiter Vehicle (OV) 103, lands on runway 22 at EAFB, Calif
STS053-S-085 (9 Dec. 1992) --- The drag chute on the space shuttle Discovery is partially deployed during landing on Runway 22 at Edwards Air Force Base. The landing ended an eight-day space mission for the STS-53 crew. Main gear touchdown occurred at 12:43:17 p.m. (PST) on Dec. 9, 1992. Onboard were astronauts David M. Walker, Robert D. Cabana, Guion S. Bluford Jr., James S. Voss and Michael R.U. (Rich) Clifford.
STS-53 Discovery, Orbiter Vehicle (OV) 103, lands on runway 22 at EAFB, Calif
Shuttle Challenger lands on Runway 17 at Edwards at end of 51-B mission. The photo is a rear view of the shuttle landing gear touching the runway, with clouds of dirt trailing behind it. The nose gear is still in the air (071); Side view of the Challenger landing gear touching the runway (072).
Shuttle Challenger landing on Runway 17 at Edwards at end of 51-B mission
STS059-S-108 (20 April 1994) --- The main landing gear of the Space Shuttle Endeavour touches down at Edwards Air Force Base to complete the 11-day STS-59/SRL-1 mission.  Landing occurred at 9:54 a.m. (PDT), April 20, 1994.  Mission duration was 11 days, 5 hours, 49 minutes.  Guiding Endeavour to a landing was astronaut Sidney M. Gutierrez, STS-59 commander.  His crew was Kevin P. Chilton, Linda M. Godwin, Jerome (Jay) Apt, Michael R. (Rich) Clifford and Thomas D. Jones.
Landing of STS-59 Endeavour, OV-105, at Edwards Air Force Base
STS060-S-035 (11 Feb 1994) --- The drag chute for Space Shuttle Discovery is deployed on the Shuttle Landing Facility, marking an end to the eight-day STS-60 mission.  Landing occurred at 2:19:22 p.m. (EST).  Onboard were astronauts Charles F. Bolden Jr., Kenneth S. Reightler Jr., Franklin R. Chang-Diaz, N. Jan Davis and Ronald M. Sega along with Russian cosmonaut Sergei K. Krikalev.
Landing of STS-60 Space Shuttle Discovery at Kennedy Space Center
STS028-S-013 (13 Aug 1989) --- The Space Shuttle Columbia is captured on film just prior to main gear touchdown at Edwards Air Force Base in Southern California.  The landing marked a successful end to a five-day DOD-devoted mission.  Onboard the spacecraft were Astronauts Brewster H. Shaw Jr., Richard N. Richards, David C. Leestma, James C.  Adamson and Mark N. Brown.
STS-28 Columbia, OV-102, landing at Edwards Air Force Base (EAFB) California
STS027-S-014 (6 Dec. 1988) --- A 70mm camera records the landing of the space shuttle Atlantis on Rogers Dry Lake Bed near the Dryden Flight Research Facility in California. The wheels of the vehicle came to a stop at 3:36:53 p.m. (PST), marking the completion of a successful mission which involved five veteran NASA astronauts. Onboard for the four-day flight were astronauts Robert L. Gibson, Guy S. Gardner, Jerry L. Ross, Richard M. (Mike) Mullane and William M. Shepherd. Photo credit: NASA
STS-27 Atlantis, OV-104, lands at Edwards Air Force Base (EAFB), California
STS027-S-012 (6 Dec. 1988) --- A 70mm camera records the landing of the Space Shuttle Atlantis on Rogers Dry Lake Bed near the Dryden Flight Research Facility in California. The wheels of the vehicle came to a stop at 3:36:53 p.m. (PST), marking the completion of a successful mission which involved five veteran NASA astronauts. Onboard for the four-day flight were astronauts Robert L. Gibson, Guy S. Gardner, Jerry L. Ross, Richard M. (Mike) Mullane and William M. Shepherd.
STS-27 Atlantis, OV-104, lands at Edwards Air Force Base (EAFB), California
STS050-S-105 (9 July 1992) --- The main drag chute on the Space Shuttle Columbia is fully deployed soon after the Space Shuttle touches down at the Kennedy Space Center (KSC) landing facility.  Landing occurred at 7:42 a.m. (EDT).  Seven crew members, including five astronauts and two scientists from the private sector spent 14 days in space supporting the U.S. Microgravity Laboratory (USML-1).  This marks the first time for usage of the parachute system for a KSC landing and the second occurrence in the program.
STS-50 Columbia, OV-102, landing with drag chute deploy at KSC SLF runway 33
STS031-S-135 (29 April 1990) --- The Space Shuttle Discovery makes a smooth landing on the runway at Edwards Air Force Base to complete a highly successful five-day mission. It was an Earth orbital flight during which the Hubble Space Telescope (HST) was sent toward its 15-year mission.  Landing was completed at 6:51 a.m. (PDT), April 29, 1990.  Inside the spacecraft for STS-31 were Astronauts Loren J. Shriver, Charles F. Bolden, Bruce McCandless II, Kathryn D. Sullivan and Steven A. Hawley.
STS-31 Discovery, Orbiter Vehicle (OV) 103, lands on EAFB concrete runway 22
STS047-S-116 (20 Sept 1992) --- The Space Shuttle Endeavour prepares to land on the Kennedy Space Center's Shuttle landing facility runway.  The successful landing marked the completion of an eight-day Earth-orbital mission for the orbiter, its seven-member crew and the Spacelab-J payload.  Landing occurred at 8:53 a.m.  (EDT), September 20, 1992.  Onboard the spacecraft were astronauts Robert L. Gibson, Curtis L. Brown Jr., Mark C. Lee, Jerome (Jay) Apt, N. Jan Davis and Mae C. Jemison, along with Japanese payload specialist Dr. Mamoru Mohri.
STS-47 Endeavour, Orbiter Vehicle (OV) 105, landing sequence at KSC SLF
STS049-S-325 (16 May 1992) --- The main landing gear of Endeavour is just about to touch down at Edwards Air Force Base to draw to an end NASA's nine-day STS-49 mission. Crewmembers onboard were astronauts Daniel C. Brandenstein, mission commander; Kevin P. Chilton, pilot; and Thomas D. Akers, Richard J. Hieb, Bruce E. Melnick, Kathryn C. Thornton and Pierre J. Thout, all mission specialists.  Landing occurred at 1:36:38 p.m. (PDT), May 16, 1992.
STS-49 Endeavour, OV-105, landing on concrete runway 22 at EAFB, California
STS052-S-099 (1 Nov. 1992) --- This three-quarter front view shows the Space Shuttle Columbia just after deployment of the drag chute during landing at KSC's Shuttle Landing Facility. Onboard were a crew of five NASA astronauts and a Canadian payload specialist. Landing occurred at 9:05:53 a.m. (EST), November 1, 1992. Crewmembers are astronauts James D. Wetherbee, Michael A. Baker, Tamara E. Jernigan, Charles L. (Lacy) Veach and William M. Shepherd along with payload specialist Steven G.  MacLean. The photo was taken with a 35mm camera.
STS-52 Columbia, Orbiter Vehicle (OV) 102, lands on runway 33 at KSC SLF
STS033-S-017 (27 Nov 1989) --- The Space Shuttle Discovery is approached by safing vehicles and team members following its late-afternoon landing at Edwards Air Force Base in southern California.  A five member crew aboard had just completed the DOD-devoted      STS-33 mission.  The landing occurred at     16:31:02 p.m. (PST), Nov. 27, 1989.  Onboard   Discovery for the mission and still aboard the   craft when this photo was made were Astronauts   Frederick D. Gregory, John E. Blaha, Kathryn C. Thornton, F. Story Musgrave and Manley L.   Carter.
STS-33 Discovery, OV-103, approached by service vehicles after landing
The Space Shuttle Challenger lands at Kennedy Space Center (KSC) at the end of the STS 41-G mission. The main landing gear has already touched down in this view, but the nose gear is still in the air (90232); Front view through tall grass of the Challenger making its landing at KSC (90233); Close-up side view of the Challenger making its landing at KSC (90234); Aerial view of the Challenger making its final approach to the runway to land at KSC (90235).
Space Shuttle Challenger landing at Kennedy Space Center at end of STS 41-G
The Space Shuttle Challenger lands at Kennedy Space Center (KSC) at the end of the STS 41-G mission. The main landing gear has already touched down in this view, but the nose gear is still in the air (90232); Front view through tall grass of the Challenger making its landing at KSC (90233); Close-up side view of the Challenger making its landing at KSC (90234); Aerial view of the Challenger making its final approach to the runway to land at KSC (90235).
Space Shuttle Challenger landing at Kennedy Space Center at end of STS 41-G
The Space Shuttle Challenger lands at Kennedy Space Center (KSC) at the end of the STS 41-G mission. The main landing gear has already touched down in this view, but the nose gear is still in the air (90232); Front view through tall grass of the Challenger making its landing at KSC (90233); Close-up side view of the Challenger making its landing at KSC (90234); Aerial view of the Challenger making its final approach to the runway to land at KSC (90235).
Space Shuttle Challenger landing at Kennedy Space Center at end of STS 41-G
S84-27717 (11 Feb 1984) --- A chase plane gets a "front row" position to view the touchdown of the total landing gear of the Space Shuttle Challenger as the reusable spacecraft makes NASA's first landing on the runway at the Kennedy Space Center's (KSC) landing facility.  This photograph was taken from another T-38 chase plane.
Landing - Shuttle Challenger - STS-41B Mission - KSC
STS111-S-028 (19 June 2002) ---  The drag chute on the Space Shuttle Endeavour deploys to slow down the spacecraft during landing on runway 22 at Dryden Flight Research Center.  After traveling 5.8 million miles in space during 217 orbits,  the shuttle ended NASA's STS-111 mission with complete wheel stop on the concrete runway  at 10:58:45 a.m. (PDT), June 19, 2002.  Three days of unfavorable weather conditions at KSC prompted the decision to land at Edwards, which enjoyed pristine, dry conditions. Main gear touchdown occurred at 10:57:41 a.m. (PDT) and nose gear touchdown at 10:57:53 a.m. (PDT).
sts111-s-028
Landing of Orbiter Challenger at KSC completion of 41G Mission.   Views closeup front view of the Orbiter approaching the runway, its landing gear extended in preparation for touchdown. The KSC Alternative Photo Number is 108-KSC-84PC-639.      KSC, FL
Landing - Orbiter Challenger - Completion of 41G Mission - KSC
Landing of Orbiter Challenger at KSC at completion of 41G mission. View of the rear of the Orbiter as it approaches the runway with its landing gear extended. The main engines are clearly visible. The KSC Alternative Photo Number is 108-KSC-84PC-654 (43896).           KSC, FL
Landing - Orbiter Challenger - Completion of 41G Mission - KSC
KENNEDY SPACE CENTER, FLA. -- Atlantis is silhouetted by the brilliant runway lights as it lands on Runway 15 of the KSC Shuttle Landing Facility. Main gear touchdown was at 3:56:48 a.m. EDT, landing on orbit 185 of the mission. Nose gear touchdown was at 3:56:57 a.m. EDT and wheel stop at 3:58:01 a.m. EDT.; Atlantis and crew traveled 4.9 million miles on the 11-day, 19-hour, 11-minute mission STS-106. During the mission to the International Space Station, the crew transferred nearly 5,000 pounds of equipment and supplies for use by the first resident crew expected to arrive in November. STS-106 was the 99th flight in the Shuttle program and the 22nd for Atlantis. STS-106 also marked the 15th nighttime landing in Shuttle history and the 23rd consecutive landing at KSC
KSC-00pp1399
KENNEDY SPACE CENTER, FLA. -- Atlantis is silhouetted by the brilliant runway lights as it lands on Runway 15 of the KSC Shuttle Landing Facility. Main gear touchdown was at 3:56:48 a.m. EDT, landing on orbit 185 of the mission. Nose gear touchdown was at 3:56:57 a.m. EDT and wheel stop at 3:58:01 a.m. EDT.; Atlantis and crew traveled 4.9 million miles on the 11-day, 19-hour, 11-minute mission STS-106. During the mission to the International Space Station, the crew transferred nearly 5,000 pounds of equipment and supplies for use by the first resident crew expected to arrive in November. STS-106 was the 99th flight in the Shuttle program and the 22nd for Atlantis. STS-106 also marked the 15th nighttime landing in Shuttle history and the 23rd consecutive landing at KSC
KSC00pp1399
CAPE CANAVERAL, Fla.  – After landing with the STS-124 mission crew, astronaut Garrett Reisman joins in the traditional walk-around under the shuttle after landing. Reisman spent 95 days on the International Space Station as part of the Expedition 17 crew.  The STS-124 mission ended with space shuttle Discovery's landing on Runway 15 at NASA's Kennedy Space Center, ending a 14-day mission to the International Space Station.  Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1725
CAPE CANAVERAL, Fla.  –   The STS-124 mission crew addresses the media after their successful landing aboard space shuttle Discovery on Runway 15 at NASA's Kennedy Space Center.  The landing ended a 14-day mission to the International Space Station. From left are Pilot Ken Ham, Mission Specialists Karen Nyberg and Akihiko Hoshide, Commander Mark Kelly, and Mission Specialists Mike Fossum and Ron Garan.  Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1727
CAPE CANAVERAL, Fla.  –  After landing with the STS-124 mission crew, astronaut Garrett Reisman talks to NASA Associate Administrator for Space Operations Bill Gerstenmaier and NASA Associate Administrator Chris Scolese.  Reisman spent 95 days on the International Space Station as part of the Expedition 17 crew.  The STS-124 mission ended with space shuttle Discovery's landing on Runway 15 at NASA's Kennedy Space Center, ending a 14-day mission to the International Space Station.  Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1721
CAPE CANAVERAL, Fla.  –  STS-124 Mission Specialist Karen Nyberg (center) looks at the underside of space shuttle Discovery during the traditional walk-around after landing.  At left is astronaut Janet Kavandi. The STS-124 mission ended with ttle Discovery's landing on Runway 15 at NASA's Kennedy Space Center, ending a 14-day mission to the International Space Station. Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1723
CAPE CANAVERAL, Fla.  –  STS-124 Pilot Ken Ham joins in the traditional walk-around under the shuttle after landing.  The STS-124 mission ended with space shuttle Discovery's landing on Runway 15 at NASA's Kennedy Space Center, ending a 14-day mission to the International Space Station. Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1724
CAPE CANAVERAL, Fla.  –  Space shuttle Discovery drops from the blue sky preparing to land on Runway 15 at NASA's Kennedy Space Center.  This 69th landing at Kennedy ended the STS-124 mission, a 14-day flight to the International Space Station.  On the ground before the runway are the Ball-Bar Light System, which  provide a visual reference to provide inner glide slope information.   The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kevin O'Connell,Scott Haun
KSC-08pd1706
CAPE CANAVERAL, Fla.  –   In the 69th landing at NASA's Kennedy Space Center, space shuttle Discovery approaches landing on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station. The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Chris Lynch
KSC-08pd1695
CAPE CANAVERAL, Fla.  –   In the 69th landing at NASA's Kennedy Space Center, space shuttle Discovery approaches landing on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station. The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1691
CAPE CANAVERAL, Fla. ---  In the 16th night landing at NASA's Kennedy Space Center, space shuttle Endeavour approaches Runway 15 to end the STS-123 mission, a 16-day flight to the International Space Station.  The main landing gear touched down at 8:39:08 p.m. EDT.  The nose landing gear touched down at 8:39:17 p.m. and wheel stop was at 8:40:41 p.m.  The mission completed nearly 6.6 million miles.  The landing was the second opportunity after the first was waved off due to unstable weather in the Kennedy Space Center area.   Photo credit: NASA/Tony Gray, Kevin O'Connell, Scott Haun
KSC-08pp0885
CAPE CANAVERAL, Fla.  –   A drag chute slows space shuttle Discovery's landing on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station.  This landing was the 69th at NASA's Kennedy Space Center.  The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1692
CAPE CANAVERAL, Fla.  –  Under blue skies, space shuttle Discovery approaches landing on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station.  This landing was the 69th at NASA's Kennedy Space Center.  The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Mike Gayle
KSC-08pd1699
CAPE CANAVERAL, Fla.  –  In the 69th landing at NASA's Kennedy Space Center, a drag chute slows space shuttle Discovery's landing on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station. The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Chris Lynch
KSC-08pd1697
A NASA CV-990, modified as a Landing Systems Research Aircraft (LSRA), lands on the Edwards AFB main runway in test of the space shuttle landing gear system. In this case, the shuttle tire failed, bursting into flame during the rollout. The space shuttle landing gear test unit, operated by a high-pressure hydraulic system, allowed engineers to assess and document the performance of space shuttle main and nose landing gear systems, tires and wheel assemblies, plus braking and nose wheel steering performance. The series of 155 test missions for the space shuttle program provided extensive data about the life and endurance of the shuttle tire systems and helped raise the shuttle crosswind landing limits at Kennedy.  The CV-990 used as the LSRA was built in 1962 by the Convair Division of General Dynamics Corp., Ft. Worth, Texas, served as a research aircraft at Ames Research Center, Moffett Field, California, before it came to Dryden.
CV-990 Landing Systems Research Aircraft (LSRA) during Space Shuttle tire test
STS054-S-100 (19 Jan 1993) --- The drag chute is fully deployed as the Space Shuttle Endeavour rolls toward wheelstop at KSC's Shuttle landing facility. Landing occurred at 8:38 a.m. (EST), Jan. 19, 1993.  Onboard for the six-day mission were astronauts John H. Casper, mission commander, Donald R. McMonagle, pilot, Gregory J. Harbaugh, Mario Runco Jr. and Susan J. Helms, mission specialists.
STS-54 Endeavour, Orbiter Vehicle (OV) 105, lands on runway 33 at KSC's SLF
STS054-S-101 (19 Jan 1993) --- The drag chute is just about to be released as the Space Shuttle Endeavour rolls toward wheelstop at KSC's Shuttle landing facility. Landing occurred at 8:38 a.m. (EST), Jan. 19, 1993.  Onboard for the six-day mission were astronauts John H. Casper, mission commander, Donald R. McMonagle, pilot, Gregory J. Harbaugh, Mario Runco Jr. and Susan J. Helms, mission specialists.
STS-54 Endeavour, Orbiter Vehicle (OV) 105, lands on runway 33 at KSC's SLF
STS049-S-268 (16 May 1992) --- A three-quarter forward view of the Space Shuttle Endeavour making its first landing, following a successful nine-day mission in Earth orbit.  The drogue chute precedes the main chute in NASA's first exercise of its detailed test objective (DTO-521) on the drag chute system.  Main gear touchdown occurred at 1:57:38 p.m. (PDT), May 16, 1992.
STS-49 Endeavour, OV-105, drag chute deployment during landing at EAFB, Calif
Spotlights illuminate Atlantis, Orbiter Vehicle (OV) 104, during safing operations at the Kennedy Space Center's (KSC's) Shuttle Landing Facility (SLF). OV-104 parked on runway 33 is serviced by KSC ground crews. STS-38, a Department of Defense (DOD)-devoted mission, came to an end (with complete wheel stop) at 4:43:37 pm (Eastern Standard Time (EST)).
STS-38 Atlantis, OV-104, during safing operations after KSC SLF landing
STS054-S-098 (19 Jan 1993) --- This ground-level side view shows the Space Shuttle Endeavour during main landing gear touchdown at KSC's Shuttle Landing Facility to successfully complete a six day Earth-orbital mission.  Landing occurred at 8:38 a.m. (EST), Jan. 19, 1993.  Onboard were astronauts John H. Casper, mission commander; Donald R. McMonagle, pilot; Gregory J. Harbaugh, Mario Runco Jr. and Susan J. Helms, mission specialists.
STS-54 Endeavour, Orbiter Vehicle (OV) 105, lands on runway 33 at KSC's SLF
STS113-S-041 (7 December 2002) --- The main landing gear of Space Shuttle Endeavour touches down on runway 33 at the KSC landing facility, completing the nearly 14-day STS-113 mission to the International Space Station (ISS). Astronaut James D. Wetherbee, mission commander, eased Endeavour to a textbook landing on runway 33 at the Florida spaceport at 2:37 p.m. (EST) on December 7, 2002. The landing completed a 5.74-million mile mission that saw successful delivery and installation of the Port One (P1) truss on the orbital outpost.
STS113-S-041
STS113-S-021 (7 December 2002) --- The main landing gear of Space Shuttle Endeavour touches down on runway 33 at the KSC landing facility, completing the nearly 14-day STS-113 mission to the International Space Station (ISS). Astronaut James D. Wetherbee, mission commander, eased Endeavour to a textbook landing on runway 33 at the Florida spaceport at 2:37 p.m. (EST) on December 7, 2002. The landing completed a 5.74-million mile mission that saw successful delivery and installation of the Port One (P1) truss on the orbital outpost.
sts113-s-021
KENNEDY SPACE CENTER, Fla. -- Atlantis’ main gear touchdown on Runway 15 of the KSC Shuttle Landing Facility kicks up swirls of dust reflected in the runway lights. Atlantis and crew traveled 4.9 million miles on the 11-day, 19-hour, 11-minute mission STS-106. Main gear touchdown occurred on-time at 3:56:48 a.m. EDT. During the mission to the International Space Station, the crew transferred nearly 5,000 pounds of equipment and supplies for use by the first resident crew expected to arrive in November. STS-106 was the 99th flight in the Shuttle program and the 22nd for Atlantis. STS-106 also marked the 15th nighttime landing in Shuttle history and the 23rd consecutive landing at KSC
KSC00pp1401
CAPE CANAVERAL, Fla.  –  After their successful STS-124 mission and landing on Runway 15 at NASA's Kennedy Space Center, Mission Specialists Karen Nyberg and Akihiko Hoshide, Pilot Ken Ham and Mission Specialist Ron Garan are greeted by the Japan Aerospace Exploration Agency's Director of Program Management and Integration Yuichi Yamaura and Vice President Kaoru Mamiya, Center Director Bill Parsons and Associate Administrator for Space Operations Bill Gerstenmaier.  Space shuttle Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1718
CAPE CANAVERAL, Fla.  –  The STS-124 mission crew members head for their traditional walk-around  space shuttle Discovery after landing on Runway 15 at NASA's Kennedy Space Center, ending a 14-day mission to the International Space Station.  At left is Pilot Ken Ham, in center is Mission Specialist Karen Nyberg, followed by Mission Specialists Akihiko Hoshide and Ron Garan.  At right are Mission Specialist Mike Fossum and Commander Mark Kelly.   Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1722
CAPE CANAVERAL, Fla.  –  After their successful STS-124 mission and landing on Runway 15 at NASA's Kennedy Space Center, crew members exit the crew transport vehicle.  Leading the way is Commander Mark Kelly, followed by (from left) Mission Specialists Mike Fossum, Karen Nyberg, Akihiko Hoshide and Ron Garan.  Behind them is Stephen Lindsay, chief of the Astronaut Corps, and astronaut Janet Kavandi.  Space shuttle Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1714
KENNEDY SPACE CENTER, Fla. -- Atlantis’ main gear touchdown on Runway 15 of the KSC Shuttle Landing Facility kicks up swirls of dust reflected in the runway lights. Atlantis and crew traveled 4.9 million miles on the 11-day, 19-hour, 11-minute mission STS-106. Main gear touchdown occurred on-time at 3:56:48 a.m. EDT. During the mission to the International Space Station, the crew transferred nearly 5,000 pounds of equipment and supplies for use by the first resident crew expected to arrive in November. STS-106 was the 99th flight in the Shuttle program and the 22nd for Atlantis. STS-106 also marked the 15th nighttime landing in Shuttle history and the 23rd consecutive landing at KSC
KSC-00pp1401
STS124-S-071 (14 June 2008) --- After landing on runway 15 at NASA's Kennedy Space Center, space shuttle Discovery is purged -- providing cool and humidified air conditioning to the payload bay and other cavities to remove any residual explosive or toxic fumes -- while still on the runway. Cooling transfer to ground services occurs at about the same time, allowing onboard cooling to be shut down. When it is determined that the area in and around the orbiter is safe, the crew prepares for departure from the orbiter. The main landing gear touched down at 11:15:19 a.m. (EDT) on June 14, 2008. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. During the mission, Discovery's crew installed the Japan Aerospace Exploration Agency's large Kibo laboratory and its remote manipulator system leaving a larger space station and one with increased science capabilities.
STS-124 landing
CAPE CANAVERAL, Fla.  –  After the successful STS-124 mission and landing on Runway 15 at NASA's Kennedy Space Center, Commander Mark Kelly is greeted by NASA Associate Administrator Chris Scolese.  At left is Associate Administrator for Space Operations Bill Gerstenmaier. Space shuttle Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1715
KENNEDY SPACE CENTER, FLA. --  After space shuttle Discovery's landing at NASA's Kennedy Space Center, workers transfer experiments to vehicles.  Discovery completed a 15-day mission to the International Space Station with a smooth landing on Runway 33.  Main gear touchdown was 1:01:16 p.m.  Wheel stop was at 1:02:07 p.m.  Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds.  The crew completed a 15-day mission to the International Space Station with a smooth landing on Runway 33.  Main gear touchdown was 1:01:16 p.m.  Wheel stop was at 1:02:07 p.m.  Mission elapsed time was 15 days, 2 hours, 24 minutes and 2 seconds.  Mission STS-120 continued the construction of the station with the installation of the Harmony Node 2 module and the relocation of the P6 truss. Photo credit: NASA/Jim Grossmann
KSC-07pd3170
STS093-(S)-011 (27 July 1999) --- The Space Shuttle Columbia is about to touch down on runway 33 at the Kennedy Space Center's Shuttle Landing Facility following a successful mission of nearly five days and 1.8 million miles.  Main gear touchdown was at 11:20:35 a.m. (EDT), July 27, 1999.
sts093-s-011
Space Shuttle Discovery STS-42) is just about to ease down its main gear on Runway 22 at Edwards Air Force Base in southern California. The successful landing completed an eight-day mission for five NASA astronauts and two payload specialists supporting the first International Microgravity Laboratory (IML-1) mission.
Space Shuttle Project
STS093-(S)-010 (27 July 1999) --- The Space Shuttle Columbia rolls along runway 33 at the Kennedy Space Center's  Shuttle Landing Facility following  a successful mission of nearly five days and 1.8 million miles.  Main gear touchdown was at 11:20:35 a.m. (EDT),  July 27, 1999.
sts093-s-010
CAPE CANAVERAL, Fla.  –  Space shuttle Discovery touches down on Runway 15 at NASA's Kennedy Space Center to end the STS-124 mission, a 14-day flight to the International Space Station.  This landing was the 69th at NASA's Kennedy Space Center. The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo courtesy of Scott Andrews
KSC-08pd1698
CAPE CANAVERAL, Fla.  –    In the 69th landing at NASA's Kennedy Space Center, space shuttle Discovery kicks up dust as it touches down on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station. The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Mike Gayle
KSC-08pd1701
CAPE CANAVERAL, Fla.  –   In the 69th landing at NASA's Kennedy Space Center, space shuttle Discovery kicks up dust as it touches down on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station.  The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Mike Gayle
KSC-08pd1700
CAPE CANAVERAL, Fla.  –   In the 69th landing at NASA's Kennedy Space Center, space shuttle Discovery kicks up dust as it touches down on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station. The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Chris Lynch
KSC-08pd1696
CAPE CANAVERAL, Fla.  –   Space shuttle Discovery approaches Runway 15 at NASA's Kennedy Space Center to end the STS-124 mission, a 14-day flight to the International Space Station.  This landing was the 69th at NASA's Kennedy Space Center. The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Mike Kerley
KSC-08pd1693
CAPE CANAVERAL, Fla.  –  Space shuttle Discovery touches down on Runway 15 at NASA's Kennedy Space Center to end the STS-124 mission, a 14-day flight to the International Space Station.  This landing was the 69th at NASA's Kennedy Space Center. The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Mike Kerley
KSC-08pd1694
CAPE CANAVERAL, Fla.  –  In the 69th landing at NASA's Kennedy Space Center, space shuttle Discovery touches down on Runway 15 to end the STS-124 mission, a 14-day flight to the International Space Station.  The main landing gear touched down at 11:15:19 a.m. EDT. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1689
STS110-S-055 (19 April 2002) --- With its drag chute gear deployed, the Space Shuttle Atlantis eases to a stop on the runway at the KSC landing facility to complete the nearly 11-day STS-110 journey.   Astronaut Michael J. Bloomfield, mission commander, eased Atlantis to a textbook landing on runway 3-3 at the Florida spaceport at 12:27 p.m. (EDT), April 19,  2002, under clear skies and light winds.   The landing completed a 4.5-million-mile mission that saw successful delivery and  installation of the centerpiece of the International Space Station?s main truss and the inaugural run of the first space railcar, the Mobile Transporter.
sts110-s-055
CAPE CANAVERAL, Fla. –  With landing gear down, space shuttle Endeavour approaches landing on Runway 15 at NASA's Kennedy Space Center in Florida to complete the 16-day, 6.5-million mile journey on the STS-127 mission to the International Space Station. Endeavour landed on orbit 248.  Main gear touchdown was at 10:48:08 a.m. EDT. Nose gear touchdown was at 10:48:21 a.m. and wheels stop was at 10:49:13 a.m. Endeavour delivered the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section to the International Space Station. The mission was the 29th flight to the station, the 23rd flight of Endeavour and the 127th in the Space Shuttle Program, as well as the 71st landing at Kennedy.  Photo credit: NASA/Linda Perry
KSC-2009-4283
CAPE CANAVERAL, Fla. – Space shuttle Endeavour lowers its landing gear as it approaches  Runway 15 at NASA's Kennedy Space Center in Florida.  The landing completes Endeavour's 16-day, 6.5-million mile journey on the STS-127 mission to the International Space Station. Endeavour landed on orbit 248.    Main gear touchdown was at 10:48:08 a.m. EDT. Nose gear touchdown was at 10:48:21 a.m. and wheels stop was at 10:49:13 a.m. Endeavour delivered the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section to the International Space Station. The mission was the 29th flight to the station, the 23rd flight of Endeavour and the 127th in the Space Shuttle Program, as well as the 71st landing at Kennedy.  Photo credit: NASA/Tony Gray
KSC-2009-4299
STS116-S-060 (22 Dec. 2006) --- Discovery's main landing gear is about to touch down on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility, concluding mission STS-116. Aboard are astronauts Mark L. Polansky, commander;  William A. Oefelein, pilot; and  Robert L. Curbeam Jr., Joan E. Higginbotham, Nicholas J.M. Patrick and European Space Agency astronauts Christer Fuglesang and Thomas Reiter--all mission specialists. Reiter is returning from a six-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A contingency spacewalk was added to retract a stubborn solar array. Main gear touchdown was at 5:32 p.m. (EST). Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC.
STS-116 Landing
STS116-S-064 (22 Dec. 2006) --- Discovery's main landing gear touches down on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility, concluding mission STS-116. Aboard are astronauts Mark L. Polansky, commander;  William A. Oefelein, pilot; and  Robert L. Curbeam Jr., Joan E. Higginbotham, Nicholas J.M. Patrick and European Space Agency astronauts Christer Fuglesang and Thomas Reiter--all mission specialists. Reiter is returning from a six-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A contingency spacewalk was added to retract a stubborn solar array. Main gear touchdown was at 5:32 p.m. (EST). Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC.
STS-116 Landing
STS116-S-072 (22 Dec. 2006) --- As the sun sets, Discovery's main landing gear touches down on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility, concluding mission STS-116. Aboard are astronauts Mark L. Polansky, commander;  William A. Oefelein, pilot; and  Robert L. Curbeam Jr., Joan E. Higginbotham, Nicholas J.M. Patrick and European Space Agency astronauts Christer Fuglesang and Thomas Reiter--all mission specialists. Reiter is returning from a six-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A contingency spacewalk was added to retract a stubborn solar array. Main gear touchdown was at 5:32 p.m. (EST). Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC.
STS-116 Landing
STS116-S-058 (22 Dec. 2006) --- As the sun sets, Discovery's main landing gear touches down on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility, concluding mission STS-116. Aboard are astronauts Mark L. Polansky, commander;  William A. Oefelein, pilot; and  Robert L. Curbeam Jr., Joan E. Higginbotham, Nicholas J.M. Patrick and European Space Agency astronauts Christer Fuglesang and Thomas Reiter--all mission specialists. Reiter is returning from a six-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A contingency spacewalk was added to retract a stubborn solar array. Main gear touchdown was at 5:32 p.m. (EST). Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC.
STS-116 Landing
STS116-S-077 (22 Dec. 2006) --- As the sun sets, Discovery's main landing gear touches down on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility, concluding mission STS-116. Aboard are astronauts Mark L. Polansky, commander;  William A. Oefelein, pilot; and  Robert L. Curbeam Jr., Joan E. Higginbotham, Nicholas J.M. Patrick and European Space Agency astronauts Christer Fuglesang and Thomas Reiter--all mission specialists. Reiter is returning from a six-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A contingency spacewalk was added to retract a stubborn solar array. Main gear touchdown was at 5:32 p.m. (EST). Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC.
STS-116 Landing
STS116-S-065 (22 Dec. 2006) --- Discovery's main landing gear touches down on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility, concluding mission STS-116. Aboard are astronauts Mark L. Polansky, commander;  William A. Oefelein, pilot; and  Robert L. Curbeam Jr., Joan E. Higginbotham, Nicholas J.M. Patrick and European Space Agency astronauts Christer Fuglesang and Thomas Reiter--all mission specialists. Reiter is returning from a six-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A contingency spacewalk was added to retract a stubborn solar array. Main gear touchdown was at 5:32 p.m. (EST). Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC.
STS-116 Landing
CAPE CANAVERAL, Fla. –  Space shuttle Endeavour's landing gear approaches contact with Runway 15 at NASA's Kennedy Space Center in Florida to complete the 16-day, 6.5-million mile journey on the STS-127 mission to the International Space Station. Endeavour landed on orbit 248. Main gear touchdown was at 10:48:08 a.m. EDT. Nose gear touchdown was at 10:48:21 a.m. and wheels stop was at 10:49:13 a.m. Endeavour delivered the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section to the International Space Station. The mission was the 29th flight to the station, the 23rd flight of Endeavour and the 127th in the Space Shuttle Program, as well as the 71st landing at Kennedy.  Photo credit: NASA/Tom Joseph
KSC-2009-4278
CAPE CANAVERAL, Fla. – With landing gear lowered, space shuttle Endeavour drops quickly toward Runway 15 at NASA's Kennedy Space Center in Florida to complete the 16-day, 6.5-million mile journey on the STS-127 mission to the International Space Station. Endeavour landed on orbit 248. Main gear touchdown was at 10:48:08 a.m. EDT. Nose gear touchdown was at 10:48:21 a.m. and wheels stop was at 10:49:13 a.m. Endeavour delivered the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section to the International Space Station. The mission was the 29th flight to the station, the 23rd flight of Endeavour and the 127th in the Space Shuttle Program, as well as the 71st landing at Kennedy.  Photo credit: NASA/Chuck Tintera
KSC-2009-4306
CAPE CANAVERAL, Fla. –  The main landing gear of space shuttle Endeavour touches down on the pavement of Runway 15 at NASA's Kennedy Space Center in Florida, to complete the 16-day, 6.5-million mile journey on the STS-127 mission to the International Space Station.  Endeavour landed on orbit 248.  Main gear touchdown was at 10:48:08 a.m. EDT. Nose gear touchdown was at 10:48:21 a.m. and wheels stop was at 10:49:13 a.m. Endeavour delivered the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section to the International Space Station. The mission was the 29th flight to the station, the 23rd flight of Endeavour and the 127th in the Space Shuttle Program, as well as the 71st landing at Kennedy.  Photo credit: NASA/Kim Shiflett
KSC-2009-4274
EDWARDS AFB, CALIF. -- After traveling 5.8 million miles in space during 217 orbits, and with drag chute deployed, Endeavour lands on concrete runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., completing mission STS-111.  Three days of unfavorable weather conditions at KSC prompted the decision to land at Edwards, which enjoyed pristine, dry conditions..  Main gear touchdown occurred at 1:57:41 p.m EDT, nose gear touchdown at 1:57:53 p.m. EDT and wheel stop at 1:58:45 p.m. EDT.  [Photo by Jim Ross
KSC-02pd1029
STS111-S-027 (19 June 2002) --- After traveling 5.8 million miles in space during 217 orbits, the Space Shuttle Endeavour is just about to complete NASA's STS-111 mission with a landing on concrete runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif.  Three days of unfavorable weather conditions at KSC prompted the decision to land at Edwards, which enjoyed pristine, dry conditions. Main gear touchdown occurred at 10:57:41 a.m. (PDT), nose gear touchdown at 10:57:53 a.m. (PDT) and wheel stop at 10:58:45 a.m. (PDT).
sts111-s-027
KENNEDY SPACE CENTER, FLA. --  After a flawless landing on runway 33 of the Shuttle Landing Facility, the STS-112 crew poses in front of Atlantis.  From left are Mission Specialists Piers Sellers and Sandra Magnus, Pilot Pamela Melroy, Commander Jeffrey Ashby, and Mission Specialists David Wolf and Fyodor Yurchikhin, who represents the Russian Space Agency. Main gear touchdown occurred at 11:43:40 a.m. EDT; nose gear touchdown at 11:43:48 a.m.; and wheel stop at 11:44:35 a.m. Mission elapsed time was 10:19:58:44.  STS-112 expanded the size of the Station with the addition of the S1 truss segment.
KSC-02pd1595
EDWARDS AFB, CALIF. -- After traveling 5.8 million miles in space during 217 orbits, and with drag chute deployed, Endeavour lands on concrete runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., completing mission STS-111. Three days of unfavorable weather conditions at KSC prompted the decision to land at Edwards, which enjoyed pristine, dry conditions.. Main gear touchdown occurred at 1:57:41 p.m. EDT, nose gear touchdown at 1:57:53 p.m. EDT and wheel stop at 1:58:45 p.m. EDT. [Photo by Jim Ross]
KSC-02pp1114
EDWARDS AFB, CALIF. -- A chase plane follows behind Endeavour as it lands on concrete runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., completing mission STS-111.  Endeavour traveled 5.8 million miles in space during 217 orbits.  Three days of unfavorable weather conditions at KSC prompted the decision to land at Edwards, which enjoyed pristine, dry conditions..  Main gear touchdown occurred at 1:57:41 p.m EDT, nose gear touchdown at 1:57:53 p.m. EDT and wheel stop at 1:58:45 p.m. EDT.  [Photo by Jim Ross
KSC-02pd1030
EDWARDS AFB, CALIF. -- After traveling 5.8 million miles in space during 217 orbits, Endeavour completes mission STS-111 with a landing on concrete runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif.  Three days of unfavorable weather conditions at KSC prompted the decision to land at Edwards, which enjoyed pristine, dry conditions..  Main gear touchdown occurred at 1:57:41 p.m EDT, nose gear touchdown at 1:57:53 p.m. EDT and wheel stop at 1:58:45 p.m. EDT.  [Photo by Tom Tschida
KSC-02pd1027
STS111-S-026 (19 June 2002) ---  After traveling 5.8 million miles in space during 217 orbits, the Space Shuttle Endeavour is just about to complete NASA's STS-111 mission with a landing on concrete runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif.  Three days of unfavorable weather conditions at KSC prompted the decision to land at Edwards, which enjoyed pristine, dry conditions. Main gear touchdown occurred at 10:57:41 a.m. (PDT), nose gear touchdown at 10:57:53 a.m. (PDT) and wheel stop at 10:58:45 a.m. (PDT).
sts111-s-026
JSC2011-E-068007 (21 July 2011) --- Green paint marks the location where Atlantis' nose landing gear came to a stop on the runway after the space shuttle landed at the Kennedy Space Center in Florida on July 21, 2011.  The landing completed STS-135, the final mission of the NASA Space Shuttle Program. Photo credit: NASA Photo/Houston Chronicle, Smiley N. Pool
STS_135_Landing
JSC2011-E-068008 (21 July 2011) --- Red paint marks the location where Atlantis' main landing gear came to a stop on the runway after the space shuttle landed at the Kennedy Space Center in Florida on July 21, 2011.  The landing completed STS-135, the final mission of the NASA Space Shuttle Program. Photo credit: NASA Photo/Houston Chronicle, Smiley N. Pool
STS_135_Landing
The runway of the Shuttle Landing Facility (SLF) is marked to show where the main landing gear wheels stopped for the space shuttle Atlantis (STS-135) shortly after it landed early Thursday morning, July 21, 2011, in Cape Canaveral, Fla. Overall, Atlantis spent 307 days in space and traveled nearly 126 million miles during its 33 flights. Atlantis, the fourth orbiter built, launched on its first mission on Oct. 3, 1985. Photo Credit: (NASA/Bill Ingalls)
STS-135 Atlantis Landing
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery's drag chute unfurls upon landing on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. In the background are the runway's Air Traffic Control Tower and the 525-foot-tall Vehicle Assembly Building (far right). Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system.  A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m.  At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Tom Joseph
KSC-06pd2867
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery's drag chute unfurls upon landing on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. In the background are the runway's Air Traffic Control Tower and the 525-foot-tall Vehicle Assembly Building (far right). Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system.  A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m.  At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Tom Joseph
KSC-06pd2864
CAPE CANAVERAL, Fla.  –  The STS-124 mission crew members finish their traditional walk-around space shuttle Discovery after landing on Runway 15 at NASA's Kennedy Space Center, to end a 14-day mission to the International Space Station. At left are Mission Specialists Akihiko Hoshide and Ron Garan and Pilot Ken Ham.  At center is Mission Specialist KarenNyberg.  At right are Mission Specialist Mike Fossum and Commander Mark Kelly.  The STS-124 mission ended with Discovery's landing on Runway 15 at NASA's Kennedy Space Center, ending a 14-day mission to the International Space Station.  Discovery's main landing gear touched down at 11:15:19 a.m. EDT on Runway 15. The nose landing gear touched down at 11:15:30 a.m. and wheel stop was at 11:16:19 a.m. The mission completed 5.7 million miles. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station.   Photo credit: NASA/Kim Shiflett
KSC-08pd1726