KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery begins rolling out of high bay 3 of the Vehicle Assembly Building for the long, slow journey to Launch Pad 39B and launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2468
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery reaches Launch Pad 39B for launch of mission STS-116. On the left can be seen the White Room at the end of the orbiter access arm.  On the horizon is the Atlantic Ocean.  The shuttle was harddown on the pad at 9:03 a.m. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2484
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery reaches Launch Pad 39B for launch of mission STS-116. On the left can be seen the White Room at the end of the orbiter access arm.  On the horizon is the Atlantic Ocean.  The shuttle was harddown on the pad at 9:03 a.m. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2483
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, atop the mobile launcher platform and the crawler-transporter underneath, arrives on Launch Pad 39B for launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2478
KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery rolls out of high bay 3 of the Vehicle Assembly Building for the long, slow journey to Launch Pad 39B and launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2472
KENNEDY SPACE CENTER, FLA. --  A closeup of the crawler-transporter underneath the mobile launcher platform with Space Shuttle Discovery on top as they approach the ramp to Launch Pad 39B for launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Jim Grossmann
KSC-06pd2479
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery is well on its way on the long, slow journey from high bay 3 of the Vehicle Assembly Building to Launch Pad 39B and launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2474
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can be seen the White Room at the end of the orbiter access arm.  On the horizon at left is Launch Pad 39A.  The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2482
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, atop the mobile launcher platform and moved by the crawler-transporter underneath, makes its final approach up the ramp to Launch Pad 39B for launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2476
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, approaches the ramp to Launch Pad 39B for launch of mission STS-116. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Jim Grossmann
KSC-06pd2480
KENNEDY SPACE CENTER, FLA. --  Silhouetted by the rising sun behind it, Space Shuttle Discovery, atop the mobile launcher platform and the crawler-transporter underneath, makes its final approach up the ramp to Launch Pad 39B for launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2477
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, passes through the gate to Launch Pad 39B for launch of mission STS-116. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Jim Grossmann
KSC-06pd2481
KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery rolls out of high bay 3 of the Vehicle Assembly Building for the long, slow journey to Launch Pad 39B and launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2473
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery makes its final approach to Launch Pad 39B and launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2475