KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery reaches Launch Pad 39B for launch of mission STS-116. On the left can be seen the White Room at the end of the orbiter access arm.  On the horizon is the Atlantic Ocean.  The shuttle was harddown on the pad at 9:03 a.m. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2484
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery reaches Launch Pad 39B for launch of mission STS-116. On the left can be seen the White Room at the end of the orbiter access arm.  On the horizon is the Atlantic Ocean.  The shuttle was harddown on the pad at 9:03 a.m. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2483
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can be seen the White Room at the end of the orbiter access arm.  On the horizon at left is Launch Pad 39A.  The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
KSC-06pd2482
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, approaches the ramp to Launch Pad 39B for launch of mission STS-116. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Jim Grossmann
KSC-06pd2480
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, passes through the gate to Launch Pad 39B for launch of mission STS-116. The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Jim Grossmann
KSC-06pd2481