Replicas of Christopher Columbus' sailing ships Santa Maria, Nina, and Pinta sail by Endeavour, Orbiter Vehicle (OV) 105, on Kennedy Space Center (KSC) Launch Complex (LC) Pad 39B awaiting liftoff on its maiden voyage, STS-49. This view was taken from the water showing the three ships silhouetted in the foreground with OV-105 on mobile launcher platform profiled against fixed service structure (FSS) tower and rectracted rotating service structure (RSS) in the background. Next to the launch pad (at right) are the sound suppression water system tower and the liquid hydrogen (LH2) storage tank. View provided by KSC with alternate number KSC-92PC-970.
Replicas of the Santa Maria, Nina, Pinta sail by OV-105 on KSC LC Pad 39B
CAPE CANAVERAL, Fla. –   Branches on the nearby shore frame startled birds and space shuttle Endeavour as it roars into space from NASA Kennedy Space Center's Launch Pad 39A.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4119
CAPE CANAVERAL, Fla. – Fiery columns propel space shuttle Endeavour into space from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Below the main engine nozzles are the blue mach diamonds, a formation of shock waves in the exhaust plume of an aerospace propulsion system. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Mike Gayle, Rusty Backer
KSC-2009-4138
CAPE CANAVERAL, Fla. – At NASA Kennedy Space Center's Shuttle Landing Facility, employees capture the successful launch of space shuttle Endeavour on the STS-127 mission.  At the SLF are SCAPE vehicles, which stand by in the event a return-to-landing-site is needed after launch. Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Chuck Tintera
KSC-2009-4144
CAPE CANAVERAL, Fla. – Trailing fire, space shuttle Endeavour roars into the cloud-washed sky from Launch Pad 39A at NASA's Kennedy Space Center in Florida on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4106
CAPE CANAVERAL, Fla. –  Glowing clouds roll across NASA Kennedy Space Center's Launch Pad 39A as space shuttle Endeavour majestically roars into the sky on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4155
CAPE CANAVERAL, Fla. – The convoy command and SCAPE vehicles are in position at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida in the event a return-to-landing-site is needed after launch of space shuttle Endeavour on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Carl Winebarger
KSC-2009-4146
CAPE CANAVERAL, Fla. – Space shuttle Endeavour soars into the sky on the STS-127 mission from NASA Kennedy Space Center as convoy command and SCAPE vehicles are in position at the Shuttle Landing Facility in the event a return-to-landing-site is needed. Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Carl Winebarger
KSC-2009-4148
CAPE CANAVERAL, Fla. – At NASA Kennedy Space Center's Shuttle Landing Facility, employees capture the successful launch of space shuttle Endeavour on the STS-127 mission.  At the SLF are SCAPE vehicles, which stand by in the event a return-to-landing-site is needed after launch. Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Chuck Tintera
KSC-2009-4145
CAPE CANAVERAL, Fla. – Twin columns of fire lift space shuttle Endeavour toward the sky from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission.   Liftoff was on-time at 6:03 p.m. EDT.  Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4111
CAPE CANAVERAL, Fla. – A fish-eye view captures this close view of space shuttle Endeavour as it leaps from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4122
CAPE CANAVERAL, Fla. – Fired by the solid rocket boosters, c leaps off NASA Kennedy Space Center's  Launch Pad 39A on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4107
CAPE CANAVERAL, Fla. – Framed by smoke and steam, space shuttle Endeavour leaps from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4116
CAPE CANAVERAL, Fla. – Space shuttle Endeavour emerges from the cloud of smoke and steam on NASA Kennedy Space Center's Launch Pad 39A as it roars into space on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4123
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida, STS-127 Shuttle Launch Director Pete Nickolenko follows the path of space shuttle Endeavour as it roars into space on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT.  Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4095
CAPE CANAVERAL, Fla. – From across a pond, space shuttle Endeavour leaps from NASA Kennedy Space Center's Launch Pad 39A, propelled by columns of fire, on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4140
CAPE CANAVERAL, Fla. – Space shuttle Endeavour soars into the sky on the STS-127 mission from NASA Kennedy Space Center as convoy command and SCAPE vehicles are in position at the Shuttle Landing Facility in the event a return-to-landing-site is needed. Liftoff was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Carl Winebarger
KSC-2009-4147
CAPE CANAVERAL, Fla. – A fish-eye view of space shuttle Endeavour as it lifts off NASA Kennedy Space Center's Launch Pad 39A into the cloud-washed sky on the STS-127 mission.  At the bottom, underneath the main engine nozzles are the blue mach diamonds.  The mach diamonds are a formation of shock waves in the exhaust plume of an aerospace propulsion system.   Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4136
CAPE CANAVERAL, Fla. – Spectators at the NASA Kennedy Space Center's Banana River viewing site lean for better views of space shuttle Endeavour as it roars into space on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Ben Cooper
KSC-2009-4149
CAPE CANAVERAL, Fla. – Space shuttle Endeavour  leaps from the cloud of smoke and steam on NASA Kennedy Space Center's Launch Pad 39A as it roars into space on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4124
CAPE CANAVERAL, Fla. – Clouds of smoke and steam roll across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Endeavour races toward the sky on columns of fire on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4120
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida,  Center Director Bob Cabana congratulates the mission team for the successful launch of space shuttle Endeavour on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT.  Looking on at left are Associate Administrator of Program Analysis & Evaluation at NASA Dr. Michael Hawes, Shuttle Launch Director Mike Leinbach and Endeavour Flow Director Dana Hutcherson , and at right, STS-127 Shuttle Launch Director Pete Nickolenko.  Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4101
CAPE CANAVERAL, Fla. – Clouds of smoke and steam fill Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Endeavour races toward the sky on columns of fire on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4113
CAPE CANAVERAL, Fla. – The Banana River seems to burn as space shuttle Endeavour's column of flame is reflected at liftoff on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT.  Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4110
CAPE CANAVERAL, Fla. – Space shuttle Endeavour erupts from the clouds of smoke billowing across NASA Kennedy Space Center's Launch Pad 39A as it heads for space on the STS-127 mission.   Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4126
CAPE CANAVERAL, Fla. – The fiery blaze below space shuttle Endeavour as it launches from NASA Kennedy Space Center's Launch Pad 39A bathes the smoke and steam with an orange glow.  Liftoff of  Endeavour on the STS-127 mission was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4133
CAPE CANAVERAL, Fla. – Space shuttle Endeavour rises majestically on the STS-127 mission from amid the smoke and steam on Launch Pad 39A at NASA's Kennedy Space Center in Florida.  Liftoff was on-time at 6:03 p.m. EDT.  Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4105
CAPE CANAVERAL, Fla. – – The brilliance of space shuttle Endeavour's launch from NASA Kennedy Space Center's Launch Pad 39A is reflected in the cloud-washed sky.  Liftoff of  Endeavour on the STS-127 mission was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4132
CAPE CANAVERAL, Fla. – From across the water, space shuttle Endeavour rises powerfully from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4114
CAPE CANAVERAL, Fla. – The fiery columns from the solid rocket boosters help hurtle space shuttle Endeavour into space on the STS-127 mission.  Liftoff from NASA Kennedy Space Center's Launch Pad 39A was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Mike Gayle, Rusty Backer
KSC-2009-4139
CAPE CANAVERAL, Fla. – The nearby water captures the brilliant light from space shuttle Endeavour's liftoff from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4115
CAPE CANAVERAL, Fla. – Billows of smoke and steam infused with the fiery light from space shuttle Endeavour's launch on the STS-127 mission fill NASA Kennedy Space Center's Launch Pad 39A.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4117
CAPE CANAVERAL, Fla. – The fire of space shuttle Endeavour's launch is reflected in the Banana River near NASA Kennedy Space Center's Launch Pad 39A.  Liftoff of Endeavour on the STS-127 mission was on-time at 6:03 p.m. EDT.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4109
CAPE CANAVERAL, Fla. –  Space shuttle Endeavour leaps from orange-tinted smoke filling NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4153
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach  (center) applauds STS-127 Shuttle Launch Director Pete Nickolenko for his role in the successful launch of space shuttle Endeavour on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT.  Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4098
CAPE CANAVERAL, Fla. – SCAPE vehicles are in position at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida in the event a return-to-landing-site is needed after launch of space shuttle Endeavour on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Chuck Tintera
KSC-2009-4143
CAPE CANAVERAL, Fla. –   – Branches on the nearby shore frame a startled bird and space shuttle Endeavour as it roars into space from NASA Kennedy Space Center's Launch Pad 39A.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4118
CAPE CANAVERAL, Fla. – Atop a column of fire, space shuttle Endeavour races into the cloud-washed sky from NASA Kennedy Space Center's  Launch Pad 39A on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4108
CAPE CANAVERAL, Fla. – Propelled by columns of fire, space shuttle Endeavour races past the lightning mast on the fixed service structure of NASA ennedy Space Center's Launch Pad 39A as it heads for space on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4129
CAPE CANAVERAL, Fla. – Riding twin columns of fire, space shuttle Endeavour races toward the sky on the STS-127 mission as clouds of smoke and steam fill Launch Pad 39A at NASA's Kennedy Space Center in Florida.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4112
CAPE CANAVERAL, Fla. – Crowds fill NASA Kennedy Space Center's Banana River viewing site to see and record  space shuttle Endeavour as it roars into space on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT.   This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Ben Cooper
KSC-2009-4150
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach  performs the traditional tie-cutting of the inaugural launch for STS-127 Shuttle Launch Director Pete Nickolenko .  Liftoff of space shuttle Endeavour on the STS-127 mission was on-time at 6:03 p.m. EDT.  Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4100
CAPE CANAVERAL, Fla. – Propelled by columns of fire, space shuttle Endeavour hurtles into the cloud-washed sky from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4131
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida,  STS-127 Shuttle Launch Director Pete Nickolenko  (right) congratulates the mission team for the  successful launch of space shuttle Endeavour on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT.  At left are Endeavour Flow Director Dana Hutcherson  and Shuttle Launch Director Mike Leinbach.  Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4099
CAPE CANAVERAL, Fla. – – Space shuttle Endeavour's climb toward space from NASA Kennedy Space Center's Launch Pad 39A is captured in the nearby pond.  The launch vibrations ripple the water. Liftoff was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4141
CAPE CANAVERAL, Fla. – Columns of fire propel space shuttle Endeavour off NASA Kennedy Space Center's Launch Pad 39A creating rolling clouds of smoke and steam.  Liftoff of Endeavour on the STS-127 mission was on-time at 6:03 p.m. EDT.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4130
CAPE CANAVERAL, Fla. – A fish-eye view captures this close view of space shuttle Endeavour as it leaps from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Tony Gray, Tom Farrar
KSC-2009-4125
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida,  Shuttle Launch Director Mike Leinbach, Endeavour Flow Director Dana Hutcherson and STS-127 Shuttle Launch Director Pete Nickolenko bask in the successful launch of space shuttle Endeavour on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4104
CAPE CANAVERAL, Fla. – Columns of fire cast an orange glow on the smoke and steam from space shuttle Endeavour's launch on the STS-127 mission from NASA Kennedy Space Center's Launch Pad 39A.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Sandra Joseph, Kevin O'Connell
KSC-2009-4121
CAPE CANAVERAL, Fla. – Trailed by a column of fiery smoke, space shuttle Endeavour hurtles toward space from NASA Kennedy Space Center's Launch Pad 39A  on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4127
CAPE CANAVERAL, Fla. –  Space shuttle Endeavour clears the structures on NASA Kennedy Space Center's Launch Pad 39A as it majestically roars into the sky on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT.   This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4154
CAPE CANAVERAL, Fla. – Space shuttle Endeavour begins its climb into space from NASA Kennedy Space Center's Launch Pad 39A on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Mike Gayle, Rusty Backer
KSC-2009-4137
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida, STS-127 Shuttle Launch Director Pete Nickolenko watches the launch of space shuttle Endeavour as it roars into space on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT.  At right is Dana Hutcherson, Endeavour flow director. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4096
CAPE CANAVERAL, Fla. – Space shuttle Endeavour leaps from NASA Kennedy Space Center's Launch Pad 39A, passing the lightning mast on the fixed service structure, as it heads for space on the STS-127 mission. Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo courtesy of Scott Andrews
KSC-2009-4128
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida,  Endeavour Flow Director Dana Hutcherson and STS-127 Shuttle Launch Director Pete Nickolenko shared in the tie-cutting ceremony for their inaugural launch. At left is Shuttle Launch Director Mike Leinbach.  Space shuttle Endeavour lifted off on-time at 6:03 p.m. EDT on the STS-127 mission. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4102
CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida, the successful launch of space shuttle Endeavour is applauded by Shuttle Launch Director Mike Leinbach (foreground), NASA Public Affairs Officer Mike Curie (left) and Endeavour Flow Director Dana Hutcherson  (right). Liftoff was on-time at 6:03 p.m. EDT. Today was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4097
CAPE CANAVERAL, Fla. – The convoy command and SCAPE vehicles are in position at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida in the event a return-to-landing-site is needed after launch of space shuttle Endeavour on the STS-127 mission.  Liftoff was on-time at 6:03 p.m. EDT. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Chuck Tintera
KSC-2009-4142
CAPE CANAVERAL, Fla. –  Answering questions from the media at a press conference held at NASA's Kennedy Space Center in Florida are (second from left) Associate Administrator for NASA's Space Operations Directorate William  Gerstenmaier, Canadian Space Agency President Steve MacLean, Japan Aerospace Exploration Agency Executive Director of Human Space Systems and Utilization Kuniaki Shiraki, Shuttle Launch Integration Manager Mike Moses and STS-127 Shuttle Launch Director Pete Nickolenko.  At far left is moderator John Yembrick from NASA Public Affairs.  The conference followed the successful launch of space shuttle Endeavour on the STS-127 mission. This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4152
CAPE CANAVERAL, Fla. –  At NASA's Kennedy Space Center in Florida, a press conference following the successful launch of space shuttle Endeavour on the STS-127 mission featured (from left) Associate Administrator for NASA's Space Operations Directorate William  Gerstenmaier, Canadian Space Agency President Steve MacLean, Japan Aerospace Exploration Agency Executive Director of Human Space Systems and Utilization Kuniaki Shiraki, Shuttle Launch Integration Manager Mike Moses and STS-127 Shuttle Launch Director Pete Nickolenko.  This was the sixth launch attempt for the STS-127 mission.  The launch was scrubbed on June 13 and June 17 when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate.  The mission was postponed July 11, 12 and 13 due to weather conditions near the Shuttle Landing Facility at Kennedy that violated rules for launching, and lightning issues. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.   Photo credit: NASA/Kim Shiflett
KSC-2009-4151
STS047-S-039 (12 Sept 1992) --- A 35mm camera was used to record this low-angle view of the STS-47 launch.  With a crew of six NASA astronauts and a Japanese payload specialist onboard, the Space Shuttle Endeavour was heading for its second trip into space.  This mission will be devoted to support of the Spacelab-J mission, a joint effort between Japan and the United States.  Launch occurred at 10:23:00:0680 a.m. (EDT), September 12, 1992.  Onboard were astronauts Robert L. Gibson, mission commander; Curtis L. Brown Jr., pilot; Mark C. Lee, payload commander; and Jerome (Jay) Apt, Mae C.  Jemison and N. Jan Davis, mission specialists; along with payload specialist Mamoru Mohri, representing the National Space Development Agency (NASDA) of Japan.
STS-47 Endeavour, Orbiter Vehicle (OV) 105, liftoff from KSC
STS054-S-061 (13 Jan 1993) --- The Space Shuttle Endeavour creates a mountain of exhaust clouds as is soars off the launch pad and heads toward Earth orbit with a crew of five and the Tracking and Data Relay Satellite (TDRS-F) aboard.  Launch occurred at 8:59:30 a.m. (EST), January 13, 1993.  Onboard were John H. Casper, mission commander, Donald R. McMonagle, pilot, Gregory J. Harbaugh, Mario Runco Jr., and Susan J. Helms, mission specialists.
STS-54 Endeavour, OV-105, rises above Florida landscape during KSC liftoff
STS072-S-004 (11 Jan. 1996) --- The Space Shuttle Endeavour lights up the night sky as it lifts off from Launch Pad 39B at the Kennedy Space Center (KSC).  Liftoff for STS-72 occurred at 4:41:00:072 a.m. (EST), January 11, 1996.  Onboard the spacecraft were astronauts Brian Duffy, commander; Brent W. Jett, pilot; along with Daniel T. Barry, Leroy Chiao, Winston E. Scott and Koichi Wakata, all mission specialists.  Wakata represents Japan's National Space Development Agency (NASDA).
STS-72 Endeavour, OV-105, liftoff from KSC Launch Pad 39B
STS054-S-062 (13 Jan 1993) --- A low-angle view of the Space Shuttle Endeavour as it soars off the launch pad and heads toward Earth orbit with a crew of five and the Tracking and Data Relay Satellite (TDRS-F) aboard.  Launch occurred at 8:59:30 a.m. (EST), January 13, 1993.  Onboard were John H. Casper, mission commander, Donald R. McMonagle, pilot, Gregory J. Harbaugh, Mario Runco Jr., and Susan J. Helms, mission specialists.
STS-54 Endeavour, OV-105, soars into the morning sky after KSC liftoff
STS072-S-003 (11 Jan. 1996) --- A "fish-eye" lens was used to afford this unique view of the Space Shuttle Endeavour as it lifts off from Launch Pad 39B at the Kennedy Space Center (KSC).  Liftoff for STS-72 occurred at 4:41:00:072 a.m. (EST), January 11, 1996.  Onboard the spacecraft were astronauts Brian Duffy, commander; Brent W. Jett, pilot; along with Daniel T. Barry, Leroy Chiao, Winston E. Scott and Koichi Wakata, all mission specialists.  Wakata represents Japan's National Space Development Agency (NASDA).
STS-72 Endeavour, OV-105, liftoff from KSC Launch Pad 39B