41D-39-068 (1 Sept 1984) --- Quickly moving away from the Space Shuttle Discovery is the Telstar 3 communications satellite, deployed September 1, 1984.  The 41-D crew successfully completed three satellite placements, of which this was the last.  Telstar was the second 41-D deployed satellite to be equipped with a payload assist module (PAM-D).  The frame was exposed with a 70mm camera.
View of the SBS-4 communications satellite in orbit above the earth
41D-37-050 (1 Sept 1984) --- Telstar, the third of three satellites to be placed into space via the Earth-orbiting Discovery, departs from the cargo bay of the manned vehicle during 41-D's third day in space.  The scene was photographed at 9:35 a.m. (CDT), Sept. 1, 1984, with a 70mm handheld hasselblad camera aimed through the windows on the flight deck.  Heavy clouds cover much of the water and land mass of Earth in the background.
Deployment of the Telstar communications satellite
41D-36-034 (30 Aug 1984) --- Less than nine hours after the first launch of the Discovery, its astronaut crewmembers photographed deployment of the SBS-4 communications satellite.  The cylindrical spacecraft spins and rises from its cradle-like protective shield to begin life in space.  A number of maneuvers will place it in its desired orbit.  A 70mm camera, aimed through the spacecraft’s aft flight deck windows, was used to expose the frame.
Deployment of the SBS-4 communications satellite