
STEVE CASH LIGHTS CANDLES IN REMEMBRANCE OF THOSE WHO HAVE LOST THEIR LIVES IN PURSUIT OF SPACE EXPLORATION.

MARSHALL SHUTTLE PROPULSION OFFICE MANAGER STEVE CASH PRESENTS A MISSION PIN PLAQUE TO JOHN SHANNON, MANAGER OF THE SPACE SHUTTLE PROGRAM.

MSFC DIRECTOR PATRICK SCHEUERMANN TOURS THE TEST AREA ALONG WITH SAFETY AND MISSION ASSURANCE DIRECTOR STEVE CASH, DENNIS STRICKLAND, AND JOHN PEA.

MSFC DIRECTOR PATRICK SCHEUERMANN TOURS THE TEST AREA ALONG WITH SAFETY AND MISSION ASSURANCE DIRECTOR STEVE CASH, DENNIS STRICKLAND, AND JOHN PEA.

MSFC DIRECTOR PATRICK SCHEUERMANN TOURS THE TEST AREA ALONG WITH SAFETY AND MISSION ASSURANCE DIRECTOR STEVE CASH, DENNIS STRICKLAND, AND JOHN PEA.

CEREMONIAL TREE PLANTING WIHT (L TO R) ROBIN HENDERSON, STEVE DOERING, GENE GOLDMAN, STEVE CASH, AND ED KIESSLING AT THE 2012 SHE/EARTH DAY EVENT.

MORE THAN 250 PEOPLE FROM ACROSS NASA'S MARSHALL SPACE FLIGHT CENTER PARTICIPATED IN THE SPACE LAUNCH SYSTEM (SLS) POST-PRELIMINARY DESIGN REVIEW REPORT, HELD AUG. 5 IN ACTIVITIES BUILDING 4316. DISCUSSING THE REVIEW AND THANKING THE MARSHALL TEAM FOR A JOB WELL DONE, ARE FROM LEFT, GARRY LYLES, SLS CHIEF ENGINEER; TODD MAY, MANAGER OF THE SLS PROGRAM; STEVE CASH, DIRECTOR OF MARSHALL’S SAFETY & MISSION ASSURANCE DIRECTORATE; AND CHRIS SINGER, MANAGER OF MARSHALL’S ENGINEERING DIRECTORATE

Ronnie Rigney (r), chief of the Propulsion Test Office in the Project Directorate at Stennis Space Center, stands with agency colleagues to receive the prestigious American Institute of Aeronautics and Astronautics George M. Low Space Transportation Award on Sept. 12. Rigney accepted the award on behalf of the NASA and contractor team at Stennis for their support of the Space Shuttle Program that ended last summer. From 1975 to 2009, Stennis Space Center tested every main engine used to power 135 space shuttle missions. Stennis continued to provide flight support services through the end of the Space Shuttle Program in July 2011. The center also supported transition and retirement of shuttle hardware and assets through September 2012. The 2012 award was presented to the space shuttle team 'for excellence in the conception, development, test, operation and retirement of the world's first and only reusable space transportation system.' Joining Rigney for the award ceremony at the 2012 AIAA Conference in Pasadena, Calif., were: (l to r) Allison Zuniga, NASA Headquarters; Michael Griffin, former NASA administrator; Don Noah, Johnson Space Center in Houston; Steve Cash, Marshall Space Flight Center in Huntsville, Ala.; and Pete Nickolenko, Kennedy Space Center in Florida.

Ronnie Rigney (r), chief of the Propulsion Test Office in the Project Directorate at Stennis Space Center, stands with agency colleagues to receive the prestigious American Institute of Aeronautics and Astronautics George M. Low Space Transportation Award on Sept. 12. Rigney accepted the award on behalf of the NASA and contractor team at Stennis for their support of the Space Shuttle Program that ended last summer. From 1975 to 2009, Stennis Space Center tested every main engine used to power 135 space shuttle missions. Stennis continued to provide flight support services through the end of the Space Shuttle Program in July 2011. The center also supported transition and retirement of shuttle hardware and assets through September 2012. The 2012 award was presented to the space shuttle team 'for excellence in the conception, development, test, operation and retirement of the world's first and only reusable space transportation system.' Joining Rigney for the award ceremony at the 2012 AIAA Conference in Pasadena, Calif., were: (l to r) Allison Zuniga, NASA Headquarters; Michael Griffin, former NASA administrator; Don Noah, Johnson Space Center in Houston; Steve Cash, Marshall Space Flight Center in Huntsville, Ala.; and Pete Nickolenko, Kennedy Space Center in Florida.

On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team. Lead test engineer for the Space Launch System core stage intertank, Matt Cash briefs NASA Administrator Jim Bridenstine on testing progress of the SLS test article in the Structural Strength Lab at Marshall. The test article is structurally identical to the flight version of the intertank that will connect the core stage's two colossal fuel tanks, serve as the upper-connection point for the two solid rocket boosters and house critical avionics and electronics.

On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team. Lead test engineer for the Space Launch System core stage intertank, Matt Cash briefs NASA Administrator Jim Bridenstine on testing progress of the SLS test article in the Structural Strength Lab at Marshall. The test article is structurally identical to the flight version of the intertank that will connect the core stage's two colossal fuel tanks, serve as the upper-connection point for the two solid rocket boosters and house critical avionics and electronics.

On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team. Lead test engineer for the Space Launch System core stage intertank, Matt Cash briefs NASA Administrator Jim Bridenstine on testing progress of the SLS test article in the Structural Strength Lab at Marshall. The test article is structurally identical to the flight version of the intertank that will connect the core stage's two colossal fuel tanks, serve as the upper-connection point for the two solid rocket boosters and house critical avionics and electronics.

On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team. Lead test engineer for the Space Launch System core stage intertank, Matt Cash briefs NASA Administrator Jim Bridenstine on testing progress of the SLS test article in the Structural Strength Lab at Marshall. The test article is structurally identical to the flight version of the intertank that will connect the core stage's two colossal fuel tanks, serve as the upper-connection point for the two solid rocket boosters and house critical avionics and electronics.

On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team. Lead test engineer for the Space Launch System core stage intertank, Matt Cash briefs NASA Administrator Jim Bridenstine on testing progress of the SLS test article in the Structural Strength Lab at Marshall. The test article is structurally identical to the flight version of the intertank that will connect the core stage's two colossal fuel tanks, serve as the upper-connection point for the two solid rocket boosters and house critical avionics and electronics.

On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team. Lead test engineer for the Space Launch System core stage intertank, Matt Cash briefs NASA Administrator Jim Bridenstine on testing progress of the SLS test article in the Structural Strength Lab at Marshall. The test article is structurally identical to the flight version of the intertank that will connect the core stage's two colossal fuel tanks, serve as the upper-connection point for the two solid rocket boosters and house critical avionics and electronics.

On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team. Lead test engineer for the Space Launch System core stage intertank, Matt Cash briefs NASA Administrator Jim Bridenstine on testing progress of the SLS test article in the Structural Strength Lab at Marshall. The test article is structurally identical to the flight version of the intertank that will connect the core stage's two colossal fuel tanks, serve as the upper-connection point for the two solid rocket boosters and house critical avionics and electronics.

On August 15, 2018 NASA Administrator Jim Bridenstine visited Marshall Space Flight Center. Upon his arrival he was greeted by MSFC Acting Director Jody Singer along with the senior management team. Lead test engineer for the Space Launch System core stage intertank, Matt Cash briefs NASA Administrator Jim Bridenstine on testing progress of the SLS test article in the Structural Strength Lab at Marshall. The test article is structurally identical to the flight version of the intertank that will connect the core stage's two colossal fuel tanks, serve as the upper-connection point for the two solid rocket boosters and house critical avionics and electronics.