KENNEDY SPACE CENTER, FLA. - After their arrival at the KSC Shuttle Landing Facility, the crews of mission STS-113 pause for a group photo.  From left are STS-113 Commander James Wetherbee, Pilot Paul Lockhart, and Mission Specialists Michael Lopez-Alegria and John Herrington; and the Expedition 6 crew, Flight Engineer Nikolai Budarin, Commander Ken Bowersox and Flight Engineer Donald Pettit.  Budarin represents the Russian Space Agency. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  In addition, the major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1688
KENNEDY SPACE CENTER, FLA. -  Expedition 6 flight engineer Nikolai Budarin gets help with his helmet during suitup for launch on mission STS-113.  Budarin, who represents the Russian Space Agency, will be making his second Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1702
KENNEDY SPACE CENTER, FLA. -  The STS-113 and Expedition 6 crews exit the Operations and Checkout Building on their way to Launch Pad 39A and liftoff of Space Shuttle Endeavour.  From front to back are Expedition 6 Commander Ken Bowersox and Mission Commander James Wetherbee; Pilot Paul Lockhart and Mission Specialist Michael Lopez-Alegria; Mission Specialist John Herrington and Expedition 6 flight engineer Nikolai Budarin; and flight engineer Donald Pettit. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1708
KENNEDY SPACE CENTER, FLA. --  The STS-113 and Expedition 6 crews head for the Astrovan that will take them to Launch Pad 39A and Space Shuttle Endeavour.  In the foreground, from left to right, are Mission Specialist John Herrington, Pilot Paul Lockhart and Expedition 6 Commander Ken Bowersox.  In the back, from left to right, are Expedition 6 flight engineers Donald Pettit and Nikolai Budarin, Mission Specialist Michael Lopez-Alegria and Commander James Wetherbee. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1707
KENNEDY SPACE CENTER, FLA. --  The Expedition 6 crew poses for a photo after their arrival at the KSC Shuttle Landing Facility to prepare for launch on mission STS-113.  From left are Flight Engineer Nikolai Budarin, Commander Ken Bowersox and Flight Engineer Donald Pettit. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  In addition, the major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1689
KENNEDY SPACE CENTER, FLA. --  The STS-113 crew enjoys a snack before suiting up for launch.  Seated left to right are Mission Specialists John Herrington and Michael Lopez-Alegria, Pilot Paul Lockhart and Commander James Wetherbee; Expedition 6 flight engineer Donald Pettit, Commander Ken Bowersox and flight engineer Nikolai Budarin. STS-113 is the 16th American assembly flight to the International Space Station.  The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1699
KENNEDY SPACE CENTER, FLA. - The STS-113 and Expedition Six crews pose for a group photo at Launch Pad 39A with Space Shuttle Endeavour in the background during a tour of Kennedy Space Center prior to their launch.  From left are Expedition Six crew members Donald Pettit and Nikolai Budarin of the Russian Space Agency, STS-113 Mission Specialists John Herrington and Michael Lopez-Alegria, Expedition Six Commander Ken Bowersox, STS-113 Pilot Paul Lockhart, and STS-113 Commander James Wetherbee. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  Another major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1695
KENNEDY SPACE CENTER, FLA. - The STS-113 and Expedition Six crews pose for a group photo at Launch Pad 39A with Space Shuttle Endeavour in the background during a tour of Kennedy Space Center prior to their launch.  From left are Expedition Six crew members Donald Pettit and Nikolai Budarin of the Russian Space Agency, STS-113 Mission Specialists John Herrington and Michael Lopez-Alegria, Expedition Six Commander Ken Bowersox, STS-113 Pilot Paul Lockhart, and STS-113 Commander James Wetherbee. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  Another major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1694
KENNEDY SPACE CENTER, FLA. --  Astronaut Donald Pettit, a member of the Expedition 6 crew, arrives at KSC for Terminal Countdown Demonstration Test activities.   Expedition 6 will fly on Space Shuttle Endeavour to the International Space Station on mission STS-113.  They will relieve and replace the Expedition 5 crew.  Endeavour will also be transporting the Port 1 (P1) truss segment to the Station.  STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1544
KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour stands ready for launch on mission STS-113. .   The Orbiter Access Arm extends from the Fixed Service Structure (FSS) to the crew compartment hatch, through which the STS-113 crew will enter Endeavour.  STS-113 is the 16th American assembly flight to the International Space Station.  The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1698
KENNEDY SPACE CENTER, FLA.  -  As part of Terminal Countdown Demonstration Test (TCDT) activities, the STS-113 and Expedition 6 crews receive training in emergency exit from the orbiter on Launch Pad 39A.  Shown are (from left) STS-113 Pilot Paul Lockhart, Mission Specialist John Herrington, Expedition 6 Commander Ken Bowersox, and STS-113 Mission Specialist Michael Lopez-Alegria.  The TCDT also includes a simulated launch countdown.  The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1604
KENNEDY SPACE CENTER, FLA. --  STS-113 Mission Specialist John Herrington suits up before launch.  This will be his first Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 p.m. EST.
KSC-02pd1700
KENNEDY SPACE CENTER, FLA. -- STS-113 Mission Specialist Michael Lopez-Alegria suits up before launch.  This will be his third Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1701
KENNEDY SPACE CENTER, FLA. --  STS-113 Paul Lockhart adjusts his helmet during suitup before launch.  Lockhart will be making his second Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1705
KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee is happy to suit up before launch.  Wetherbee will be making his sixth Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1704
KENNEDY SPACE CENTER, FLA. - The Rotating Service Structure has been rolled back to reveal Space Shuttle Endeavour awaiting launch on Launch Pad 39A.  The primary mission of STS-113 is to bring the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  Another major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58:40 a.m. EST.
KSC-02pd1696
KENNEDY SPACE CENTER, FLA. - The STS-113 crew poses for a photo after their arrival at the KSC Shuttle Landing Facility to prepare for launch.  From left are Commander James Wetherbee, Pilot Paul Lockhart, and Mission Specialists Michael Lopez-Alegria and John Herrington. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  In addition, the major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1690
KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialist John Herrington pauses in front of Space Shuttle Endeavour at Launch Pad 39A during a tour of Kennedy Space Center prior to his launch.  Upon launch, Herrington will become the first Native American in space.  The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  Another major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1692
KENNEDY SPACE CENTER, FLA. --  The Expedition 6 crew pauses for the photographer after their arrival at the Shuttle Landing Facility.  From left are astronaut Donald Pettit, Commander Ken Bowersox and cosmonaut Nikolai Budarin.  The crew is at KSC for Terminal Countdown Demonstration Test activities.   Expedition 6 will fly on Space Shuttle Endeavour to the International Space Station on mission STS-113.  They will relieve and replace the Expedition 5 crew.  Endeavour will also be transporting the Port 1 (P1) truss segment to the Station.  STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1545
KENNEDY SPACE CENTER, FLA. --  STS-113 Mission Specialist Michael Lopez-Alegria arrives at KSC for Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B.   Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station.  Also onboard Space Shuttle Endeavour will be the Expedition 6 crew who will replace Expedition 5, returning to Earth after 4 months.  The STS-113 launch is scheduled for Nov. 10, 2002.
KSC-02pd1542
KENNEDY SPACE CENTER, FLA. --  STS-113 Pilot Paul Lockhart arrives at KSC for Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B.   Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station.  Also onboard Space Shuttle Endeavour will be the Expedition 6 crew who will replace Expedition 5, returning to Earth after 4 months.  The STS-113 launch is scheduled for Nov. 10, 2002.  .
KSC-02pd1543
KENNEDY SPACE CENTER, FLA. - As part of Terminal Countdown Demonstration Test (TCDT) activities, the STS-113 and Expedition 6 crews receive training in emergency exit from the orbiter on Launch Pad 39A.  Shown are (from left) Expedition 6 Commander Ken Bowersox; STS-113 Pilot Paul Lockhart; astronaut Donald Pettit; Mission Specialist Michael Lopez-Alegria, Commander James Wetherbee and Mission Specialist John Herrington; and cosmonaut  Nikolai Budarin. The TCDT also includes a simulated launch countdown.  The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1605
KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure rolled back, Space Shuttle Endeavour stands ready for launch on mission STS-113. Above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm.  Vapors are created as the liquid oxygen in the external tank boil off.   The hood vents the gaseous oxygen vapors away from the Space Shuttle vehicle.   The Orbiter Access Arm extends from the Fixed Service Structure (FSS) to the crew compartment hatch, through which the STS-113 crew will enter Endeavour.  STS-113 is the 16th American assembly flight to the International Space Station.  The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1697
KENNEDY SPACE CENTER, FLA. --  Expedition 6 Commander Ken Bowersox suits up before launch.  Bowersox will be making his fifth Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1706
KENNEDY SPACE CENTER, FLA. - Expedition 6 flight engineer Donald Pettit suits up before launch.  This will be his first Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KSC-02pd1703
KENNEDY SPACE CENTER, FLA. - Expedition Six crew member Nikolai Budarin, of the Russian Space Agency, pauses in front of Space Shuttle Endeavour at Launch Pad 39A during a tour of Kennedy Space Center prior to his launch.  The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  Another major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1693
KENNEDY SPACE CENTER, FLA. -  From a platform in Endeavour's payload bay, STS-113 Mission Specialist John Herrington looks over the payload for the mission. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1608
KENNEDY SPACE CENTER, FLA. -Space Shuttle Endeavour roars into the black sky on columns of fire as it lifts off Launch Pad 39A on mission STS-113. Liftoff occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.   [Photo by Scott Andrews]
KSC-02pd1812
KENNEDY SPACE CENTER, FLA. - Among the visitors watching the launch of Space Shuttle Endeavour on mission STS-113 are NASA Administrator Sean O'Keefe (top, center) and Glen Mahone, associate administrator for public affairs, NASA (left of O'Keefe). Liftoff occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pd1809
KENNEDY SPACE CENTER, FLA. -   Watching the launch of Space Shuttle Endeavour on mission STS-113 are NASA Administrator Sean O'Keefe (left) and Associate Administrator of Public Affairs Glen Mahone. Liftoff occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pd1808
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Endeavour climbs into the black sky as it lifts off Launch Pad 39A on mission STS-113. Liftoff occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.   [Photo by Scott Andrews]
KSC-02pd1811
KENNEDY SPACE CENTER, FLA. -   STS-113 Mission Specialist John Herrington (left) and cosmonaut Nikolai Budarin (center) listen to instructions from a trainer on the emergency egress system on Launch Pad 39A.   They are other crew members are taking part in Terminal Countdown Demonstration Test (TCDT) activities, which also include a simulated launch countdown. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1606
KENNEDY SPACE CENTER, FLA. -  On Launch Pad 39A, a trainer (right) explains use of the slidewire basket, part of the emergency egress system,  to Expedition 6 astronaut Donald Pettit (left) and STS-113 Mission Specialists Michael Lopez-Alegria (center) and John Herrington (right). .   They are other crew members are taking part in Terminal Countdown Demonstration Test (TCDT) activities, which also include a simulated launch countdown. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1607
KENNEDY SPACE CENTER, FLA. -  A full moon over Kennedy Space Center competes for dominance in the night sky with the illuminated Space Shuttle Endeavour below, poised for launch on mission STS-113 from Launch Pad 39A.   The mission will be the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard will be the Expedition 6 crew, who will replace Expedition 5.  [Photo by Scott Andrews]
KSC-02pd1807
KENNEDY SPACE CENTER, FLA. --  Against a black moonless sky, Space Shuttle Endeavour blazes into space after an ontime liftoff at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.  [Photo by Ray Yost]
KSC-02pd1805
KENNEDY SPACE CENTER, FLA. --  STS-113 Pilot Paul Lockhart shows thumbs up for launch as he finishes suiting up.  Lockhart will be making his second Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST.
KSC-02pd1784
KENNEDY SPACE CENTER, FLA. --  STS-113 Commander James Wetherbee finishes suiting up before leaving for Launch Pad 39A. Wetherbee will be making his sixth Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST.
KSC-02pd1783
KENNEDY SPACE CENTER, FLA. - Against a black moonless sky, Space Shuttle Endeavour lights up the night as it blazes into space after an ontime liftoff at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.  [Photo by Scott Andrews]
KSC-02pd1806
KENNEDY SPACE CENTER, FLA. --  Brilliant clouds of smoke and steam roll away from Launch Pad 39A as Space Shuttle Endeavour blazes into the black sky. Liftoff occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.  [Photo by Scott Andrews]
KSC-02pd1810
KENNEDY SPACE CENTER, FLA. --  Expedition 6 flight engineer Donald Pettit relaxes during suitup for launch.   Pettit will be making his first Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST.
KSC-02pd1787
KENNEDY SPACE CENTER, FLA. - Expedition 6 flight engineer Nikolai Budarin relaxes during suitup for launch.   Budarin, who is with the Russian Space Agency,  will be making his second Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST.
KSC-02pd1786
KENNEDY SPACE CENTER, FLA. --  STS-113 Mission Specialist John Herrington suits up for launch.  Herrington will be making his first Shuttle flight. This is also the first launch of the first tribally enrolled Native American astronaut -- John B. Herrington -- on Space Transportation System. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST.
KSC-02pd1785
KENNEDY SPACE CENTER, FLA. -  All is quiet on Launch Pad 39A where Space Shuttle Endeavour sits prior to launch on mission STS-113 to the International Space Station.  [Photo by Scott Andrews]
KSC-02pd1804
JOHNSON SPACE CENTER, HOUSTON, TEXAS -- (JSC2002-E-43073) --- Astronaut Donald R. Pettit, mission specialist, on the STS-126 mission.
KSC-02pd1676
JOHNSON SPACE CENTER, HOUSTON, TEXAS -- (JSC2002-E-44140) --- Cosmonaut Nikolai M. Budarin, flight engineer representing Rosaviakosmos.
KSC-02pd1675
KENNEDY SPACE CENTER, FLA. - Bathed in light, Space Shuttle Endeavour sits on the pad prior to launch on mission STS-113 to the International Space Station.  [Photo by Scott Andrews]
KSC-02pd1803
KENNEDY SPACE CENTER, FLA. -- The STS-113 and Expedition 6 crews head for the Astrovan to take them to Launch Pad 39A for a simulated launch countdown.  From  left are STS-113 Mission Specialist Michael Lopez-Alegria, Expedition 6 astronaut Donald Pettit and cosmonaut Nikolai Budarin, Mission Specialist John Herrington and Pilot Paul Lockhart, Expedition 6 Commander Ken Bowersox and STS-113 Commander James Wetherbee. .  The countdown is part of Terminal Countdown Demonstration Test activities prior to launch. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1612
KENNEDY SPACE CENTER, FLA. --  At the entrance to Space Shuttle Endeavour's cockpit, the STS-113 and Expedition 6 crews gather for a photo during Terminal Countdown Demonstration Test activities at the pad.  From left, in front, are cosmonaut Nikolai Budarin, Commander Ken Bowersox and astronaut Donald Pettit of Expedition 6,  and STS-113 Pilot Paul Lockhart.  In back, from left, are STS-113 Mission Specialists John Herrington and Michael Lopez-Alegria and Commander James Wetherbee. The TCDT also includes a simulated launch countdown.  The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1602
KENNEDY SPACE CENTER, FLA. - As part of Terminal Countdown Demonstration Test (TCDT) activities, the STS-113 and Expedition 6 crews receive training in emergency exit from the orbiter on Launch Pad 39A.  Shown are (from left) Mission Commander James Wetherbee and cosmonaut Nikolai Budarin and astronaut Donald Pettit of the Expedition 6 crew.  The TCDT also includes a simulated launch countdown.  The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1603
KENNEDY SPACE CENTER, FLA. --   The crews of Mission STS-113 gather for a group photograph on the 195-foot level of the Fixed Service Structure on Launch Pad 39A.  From left are Expedition 6 cosmonaut Nikolai Budarin and astronaut Donald Pettit; STS-113 Pilot Paul Lockhart and Commander James Wetherbee; Expedition 6 Commander Ken Bowersox; STS-113 Mission Specialists Michael Lopez-Alegria and John Herrington. They have been participating in emergency egress training, part of Terminal Countdown Demonstration Test activities in preparation for their launch.  The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour, as well as Expedition 6, who will replace Expedition 5 on the Station. The mission is scheduled to launch Nov. 10, 2002.
KSC-02pd1620
KENNEDY SPACE CENTER, FLA. - The STS-113 and Expedition 6 crews exit the Operations and Checkout Building on their way to Launch Pad 39A for a simulated launch countdown.  On the left, front to back, are Ken Bowersox, commander of Expedition 6, Mission Specialist John Herrington, astronaut Donald Pettit, and Mission Specialist Michael Lopez-Alegria.  On the right, front to back, are STS-113 Commander James Wetherbee, Pilot Paul Lockhart, and cosmonaut Nikolai Budarin.  The countdown is part of Terminal Countdown Demonstration Test activities prior to launch. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1611
KENNEDY SPACE CENTER, FLA. -   The STS-113 and Expedition 6 crews pause for a photo during Terminal Countdown Demonstration Test activities at the pad.  From left are STS-113 Mission Specialists Michael Lopez-Alegria and John Herrington, Commander James Wetherbee and Pilot Paul Lockhart; Expedition 6 astronaut Donald Pettit, Commander Ken Bowersox and cosmonaut Nikolai Budarin. The TCDT also includes a simulated launch countdown.  The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1601
KENNEDY SPACE CENTER, FLA. --  The crews of Mission STS-113 gather for a group photograph on the 195-foot level of the Fixed Service Structure on Launch Pad 39A.  From left are STS-113 Pilot Paul Lockhart; Expedition 6 Commander Ken Bowersox;  STS-113 Mission Specialists Michael Lopez-Alegria and John Herrington, and Commander James Wetherbee; Expedition 6 astronaut Donald Pettit and cosmonaut Nikolai Budarin.  They have been participating in emergency egress training, part of Terminal Countdown Demonstration Test activities in preparation for their launch.  The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour, as well as Expedition 6, who will replace Expedition 5 on the Station. The mission is scheduled to launch Nov. 10, 2002.
KSC-02pd1619
KENNEDY SPACE CENTER, FLA. - The Expedition 6 crew adjust their gloves during emergency egress practice from the 195-foot level of the Fixed Service Structure on Launch Pad 39A.  From left are astronaut Donald Pettit, cosmonaut Nikolai Budarin and Commander Ken Bowersox. The crew, travelers on Mission STS-113, will be replacing Expedition 5 on the International Space Station.  Along with Expedition 6, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour.  Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1616
KENNEDY SPACE CENTER, FLA. --  The Expedition 6 crew practice emergency egress from the 195-foot level of the Fixed Service Structure on Launch Pad 39A.  In the slidewire basket are (from left) cosmonaut Nikolai Budarin, astronaut Donald Pettit and Commander Ken Bowersox.  The crew, travelers on Mission STS-113, will be replacing Expedition 5 on the International Space Station.   Along with Expedition 6, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour.   Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1613
KENNEDY SPACE CENTER, FLA. - On a platform in Endeavour's payload bay, STS-113 Commander James Wetherbee (left) looks at part of the payload being pointed out by a worker. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1609
KENNEDY SPACE CENTER, FLA. -- From a platform in Endeavour's payload bay, STS-113 Mission Specialist John Herrington looks closely at the payload for the mission. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1610
KENNEDY SPACE CENTER, FLA. - The payload on mission STS-113 rests inside Space Shuttle Endeavour's payload bay prior to closing of the doors.  The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1623
KENNEDY SPACE CENTER, FLA. - The Expedition 6 crew poses for a photo on 195-foot level of the Fixed Service Structure on Launch Pad 39A.  From left are astronaut Donald Pettit, Commander Ken Bowersox and cosmonaut Nikolai Budarin.  Along with the STS-113 crew, they have been participating in emergency egress training, part of Terminal Countdown Demonstration Test activities in preparation for their launch. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour, as well as Expedition 6, who will replace Expedition 5 on the Station. The mission is scheduled to launch Nov. 10, 2002.
KSC-02pd1621
KENNEDY SPACE CENTER, FLA. - Expedition 6 Flight Engineer Nikolai Budarin, who represents the Russian Space Agency, arrives at KSC to prepare for launch. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  In addition, the major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1687
KENNEDY SPACE CENTER, FLA. -  Expedition 6 Commander Ken Bowersox pauses after his arrival at KSC to prepare for launch. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  In addition, the major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1686
KENNEDY SPACE CENTER, FLA. - Expedition 6 cosmonaut Nikolai Budarin (center) holds a mini-mascot during a break in emergency egress practice from the 195-foot level of the Fixed Service Structure on Launch Pad 39A.  Behind him are STS-113 Pilot Paul Lockhart (left) and Commander James Wetherbee.  Expedition 6 will be replacing Expedition 5 on the International Space Station. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour.   The mission is scheduled to launch Nov. 10, 2002.
KSC-02pd1617
KENNEDY SPACE CENTER, FLA. -- The STS-113 and Expedition 6 crews head for the Astrovan to transport them to Launch Pad 39A and Space Shuttle Endeavour.  In the foreground, from left, are Mission Specialist Michael Lopez-Alegria and John Herrington, and Expedition 6 Commander Ken Bowersox.  In the background, from left, are Expedition 6 flight engineers Donald Pettit and Nikolai Budarin, Pilot Paul Lockhart and Commander James Wetherbee. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 22, 2002, at 8:15 p.m. EST.
KSC-02pd1790
KENNEDY SPACE CENTER, FLA. --  STS-113 Commander James Wetherbee arrives at KSC's Shuttle Landing Facility to get ready for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary objective of the mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major task of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is targeted for no earlier than Nov. 22 between 7 and 11 p.m. EST.
KSC-02pd1767
KENNEDY SPACE CENTER, FLA. -  STS-113 Mission Specialists Michael Lopez-Alegria (left) and John Herrington (right) climb into the slidewire basket during emergency egress practice from the 195-foot level of the Fixed Service Structure on Launch Pad 39A.   The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1614
KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee (left) reaches for the release level on the slidewire basket during emergency egress practice from the 195-foot level of the Fixed Service Structure on Launch Pad 39A.  At right is Pilot Paul Lockhart.    The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1615
KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee arrives at the KSC Shuttle Landing Facility to get ready for launch.  STS-113 is the 16th American assembly flight to the International Space Station.  The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1681
KENNEDY SPACE CENTER, FLA. - STS-113 Pilot Paul Lockhart arrives at the KSC Shuttle Landing Facility to get ready for launch.  STS-113 is the 16th American assembly flight to the International Space Station.  The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1682
KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialist John Herrington arrives at the KSC Shuttle Landing Facility to get ready for launch.  STS-113 is the 16th American assembly flight to the International Space Station.  The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1684
KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialist Michael Lopez-Alegria arrives at the KSC Shuttle Landing Facility to get ready for launch.  STS-113 is the 16th American assembly flight to the International Space Station.  The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1683
KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour's payload bay doors begin to close around the payload  in preparation for launch.   The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1624
KENNEDY SPACE CENTER, FLA. - A worker on Launch Pad 39A watches over the closing of  Space Shuttle Endeavour's payload bay doors in preparation for launch.   The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour as well as the Expedition 6 crew, who will replace Expedition 5 on the Station. Mission STS-113 is scheduled to launch Nov. 10, 2002.
KSC-02pd1625
KENNEDY SPACE CENTER, FLA. -- Expedition Six Commander Ken Bowersox pauses in front of Space Shuttle Endeavour at Launch Pad 39A during a tour of Kennedy Space Center prior to his launch. The primary mission of STS-113 is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. Another major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KSC-02pd1691
KENNEDY SPACE CENTER, FLA. --  The STS-113 crew pause for a photo after test drives in the M-113 armored personnel carrier behind them.  From left are Mission Specialist Michael Lopez-Alegria, Pilot Paul Lockhart, Commander James Wetherbee and Mission Specialist John Herrington.  Driving the M-113 is part of emergency egress training at the pad, one of the Terminal Countdown Demonstration Test activities in preparation for launch.  The TCDT also includes a simulated launch countdown. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B.   Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station.  Also onboard Space Shuttle Endeavour will be the Expedition 6 crew who will replace Expedition 5, returning to Earth after 4 months.
KSC-02pd1554
KENNEDY SPACE CENTER, FLA. -- The STS-113 and Expedition 6 crews leave the Operations and Checkout Building, heading for Launch Pad 39A and Space Shuttle Endeavour for a second launch attempt. The launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites.  In front, left to right, are Expedition 6 Commander Ken Bowersox and Mission Commander James Wetherbee; next row, Mission Specialist Michael Lopez-Alegria and Pilot Paul Lockhart; third row, Mission Specialist John Herrington and Expedition 6 flight engineer Nikolai Budarin; and finally, Expedition 6 flight engineer Donald Pettit. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.  [Photo by Scott Andrews]
KSC-02pd1800
KENNEDY SPACE CENTER, FLA. -- The STS-113 and Expedition 6 crews head for the Astrovan that will transport them to Launch Pad 39A and Space Shuttle Endeavour for a second launch attempt. The launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites.  From left are Expedition 6 flight engineer Donald Pettit; a security guard; Expedition 6 flight engineer Nikolai Budarin; Mission Specialists John Herrington and Michael Lopez-Alegria, Pilot Paul Lockhart and Commander James Wetherbee (background); and Expedition 6 Commander Ken Bowersox. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.  [Photo by Scott Andrews]
KSC-02pd1802
KENNEDY SPACE CENTER, FLA. -- The STS-113 and Expedition 6 crews leave the Operations and Checkout Building, heading for Launch Pad 39A and Space Shuttle Endeavour.  In front, left to right, are Expedition 6 Commander Ken Bowersox and Mission Commander James Wetherbee; next row, Mission Specialist John Herrington and Pilot Paul Lockhart; third row, Mission Specialist Michael Lopez-Alegria and Expedition 6 flight engineer Nikolai Budarin; and finally, Expedition 6 flight engineer Donald Pettit. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 22, 2002, at 8:15 p.m. EST.
KSC-02pd1789
KENNEDY SPACE CENTER, FLA. -- The STS-113 and Expedition 6 crews stride down the ramp from the Operations and Checkout Building, eager to head for Launch Pad 39A and Space Shuttle Endeavour for a second launch attempt. The launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites.  In front, left to right, are Expedition 6 Commander Ken Bowersox and Mission Commander James Wetherbee; next row, Mission Specialist Michael Lopez-Alegria and Pilot Paul Lockhart; third row, Mission Specialist John Herrington and Expedition 6 flight engineer Nikolai Budarin; and finally, Expedition 6 flight engineer Donald Pettit. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.  [Photo by Scott Andrews]
KSC-02pd1801
KENNEDY SPACE CENTER, FLA. - From a blaze of fire and smoke, Space Shuttle Endeavour roars off the launch pad on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1819
KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, painting a swath of light on nearby water, blazes into the night sky on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1817
KENNEDY SPACE CENTER, FLA. -   Launch Pad 39A is illuminated as Space Shuttle Endeavour blazes into the sky on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1821
KENNEDY SPACE CENTER, FLA. - Blue mach diamonds appear behind the main engine nozzles on Space Shuttle Endeavour as it roars off the launch pad on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1818
KENNEDY SPACE CENTER, FLA. -- As the clouds of smoke and steam roll away beneath it, Space Shuttle Endeavour blazes into the night sky on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1823
KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour blazes into the night sky on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1816
KENNEDY SPACE CENTER, FLA. -- STS-113 crew members pause during a break in emergency egress practice from the 195-foot level of the Fixed Service Structure on Launch Pad 39A.  From left are Mission Specialist Michael Lopez-Alegria, Commander James Wetherbee and Pilot Paul Lockhart. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour, as well as Expedition 6, who will replace Expedition 5 on the Station. The mission is scheduled to launch Nov. 10, 2002.
KSC-02pd1618
KENNEDY SPACE CENTER, FLA. - Water near Launch Pad 39A provides a mirror image of Space Shuttle Endeavour blazing a path into the night sky after launch on mission STS-113. Liftoff occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1822
KENNEDY SPACE CENTER, FLA. -- From a blaze of fire and smoke, Space Shuttle Endeavour roars off the launch pad on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1820
KENNEDY SPACE CENTER, FLA. -- Launch Pad 39A is illuminated as Space Shuttle Endeavour blazes into the sky on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1824
KENNEDY SPACE CENTER, FLA. -- In the White Room on Launch Pad 39A, STS-113 Mission Specialist John Herrington is helped with his launch and entry suit by Rick Welty, United Space Alliance Vehicle Closeout chief. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 23 at 7:50 p.m. EST.
KSC-02pp1830
KENNEDY SPACE CENTER, FLA. - As the clouds of smoke and steam roll away into the darkness, Space Shuttle Endeavour blazes into the night sky on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST.  The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program.  Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss.  Also onboard are the Expedition 6 crew, who will replace Expedition 5.  Endeavour is scheduled to land at KSC after an 11-day journey.
KSC-02pp1815
KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialist Michael Lopez-Alegria suits up for launch.  He will be making his third Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST.
KSC-02pd1788
KENNEDY SPACE CENTER, FLA. -  U.S. Congressmen from Florida Tom Feeney  (left) and Dave Weldon wait in the VIP viewing site for the STS-113 launch. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.
KSC-02pd1792
KENNEDY SPACE CENTER, FLA. --  Expedition 6 flight engineer Donald Pettit is eager for launch as he suits up for a second launch attempt on mission STS-113. The launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites.  Pettit will be making his first Shuttle flight. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.
KSC-02pd1795
KENNEDY SPACE CENTER, FLA. --  The STS-113 crew poses for a photo on 195-foot level of the Fixed Service Structure on Launch Pad 39A.  From left are Mission Specialist John Herrington, Pilot Paul Lockhart, Commander James Wetherbee and Mission Specialist Michael Lopez-Alegria.  Along with the Expedition 6 crew, they have been participating in emergency egress training, part of Terminal Countdown Demonstration Test activities in preparation for their launch. The 16th assembly flight to the International Space Station, STS-113 will carry the Port 1 (P1) truss aboard Space Shuttle Endeavour, as well as Expedition 6, who will replace Expedition 5 on the Station. The mission is scheduled to launch Nov. 10, 2002.
KSC-02pd1622
KENNEDY SPACE CENTER, FLA. -- Expedition 6 flight engineer Nikolai Budarin is stoic as he suits up for a second launch attempt on mission STS-113. The launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites.  Budarin, who is with the Russian Space Agency,  will be making his second Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 7:50 p.m. EST.
KSC-02pd1794
KENNEDY SPACE CENTER, FLA. - STS-113 Mission Specialist Michael Lopez-Alegria suits up for the second launch attempt of mission STS-113.  The previous launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites.  He will be making his third Shuttle flight. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.
KSC-02pd1793
KENNEDY SPACE CENTER, FLA. --  STS-113 Pilot Paul Lockhart gives a thumbs up following his arrival at KSC's Shuttle Landing Facility to prepare for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary objective of the mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major task of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is targeted for no earlier than Nov. 22 between 7 and 11 p.m. EST.
KSC-02pd1770
KENNEDY SPACE CENTER, FLA. --  STS-113 Commander James Wetherbee makes a brief statement upon his arrival at KSC's Shuttle Landing Facility to prepare for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary objective of the mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major task of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is targeted for no earlier than Nov. 22 between 7 and 11 p.m. EST.
KSC-02pd1768
KENNEDY SPACE CENTER, FLA. - STS-113 Pilot Paul Lockhart salutes as he finishes suiting up for a second launch attempt on mission STS-113. The launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites.  Lockhart will be making his second Shuttle flight. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.
KSC-02pd1797
KENNEDY SPACE CENTER, FLA. -- - STS-113 Mission Specialist John Herrington smiles as he finishes suiting up for a second launch attempt on mission STS-113. The launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites.  Herrington will be making his first Shuttle flight. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth.  The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss.  Three spacewalks are planned to install and activate the truss and its associated equipment.  Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.
KSC-02pd1798