STS031-S-131 (29 April 1990) --- Low angle view of the Space Shuttle Discovery as it approaches for landing on a concrete runway at Edwards Air Force Base to complete a highly successful five-day mission.  It was a long awaited Earth orbital flight during which the Hubble Space Telescope (HST) was sent toward its 15-year mission. Discovery's wheels came to a complete stop at 6:51:00 a.m. (PDT), April 29, 1990. The landing gear was deployed just moments after this frame was exposed.  Inside the spacecraft for STS-31 were astronauts Loren J. Shriver, Charles F. Bolden, Bruce McCandless II, Kathryn D. Sullivan and Steven A. Hawley.
STS-31 Discovery, Orbiter Vehicle (OV) 103, glides toward EAFB landing
KENNEDY SPACE CENTER, FLA. --  In high bay No. 1 of the Vehicle Assembly Building, Space Shuttle Atlantis awaits its return to Launch Pad 39A.  In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder
KSC-07pd1178
KENNEDY SPACE CENTER, FLA.  -  This view of the suspended 122-foot-long orbiter Discovery shows the underside with the Thermal Protection System tiles that cover it.  After being demated from its External Tank and Solid Rocket Boosters in high bay 1, Discovery is being lowered in the transfer aisle of the Vehicle Assembly Building.  The orbiter will be placed on a transporter and moved to high bay 3 for remating with another tank, ET-121.  Discovery is expected to be rolled back to the launch pad in mid-June for Return to Flight mission STS-114.  The launch window extends from July 13 to July 31.
KSC-05pd-1224
KENNEDY SPACE CENTER, FLA. --  In high bay No. 1 of the Vehicle Assembly Building, Space Shuttle Atlantis is ready for its return to Launch Pad 39A. In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder
KSC-07pd1177
KENNEDY SPACE CENTER, FLA.  -  This view of the suspended 122-foot-long orbiter Discovery shows the underside with the Thermal Protection System tiles that cover it.  After being demated from its External Tank and Solid Rocket Boosters in high bay 1, Discovery is being lowered in the transfer aisle of the Vehicle Assembly Building.  The orbiter will be placed on a transporter and moved to high bay 3 for remating with another tank, ET-121.  Discovery is expected to be rolled back to the launch pad in mid-June for Return to Flight mission STS-114.  The launch window extends from July 13 to July 31.
KSC-05pd-1223
KENNEDY SPACE CENTER, FLA.  -  The payloads that will launch aboard Space Shuttle Discovery's Return to Flight mission STS-114 leave the Operations and Checkout Building at NASA’s Kennedy Space Center for a two-hour journey to Launch Pad 39B.  Enclosed in a payload canister, the payloads are heading for Launch Pad 39B. There, the canister will be lifted up alongside the Rotating Service Structure to the Payload Changeout Room where the STS-114 payloads will be removed.  Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2).  Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment.  The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box.  The ESP-2 is outfitted with replacement parts.  Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1286
KENNEDY SPACE CENTER, FLA.  -  In the dark before dawn, the payloads that will launch aboard Space Shuttle Discovery's Return to Flight mission STS-114  roll past the Vehicle Assembly Building at NASA’s Kennedy Space Center.  Enclosed in a payload canister, the payloads are heading for Launch Pad 39B. The canister will be lifted up alongside the Rotating Service Structure to the Payload Changeout Room where the STS-114 payloads will be removed.  Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2).  Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment.  The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box.  The ESP-2 is outfitted with replacement parts.  Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1287
KENNEDY SPACE CENTER, FLA.  -  On Launch Pad 39B, lights on the Rotating Service Structure brighten the night as the payload canister carrying payloads that will launch aboard Space Shuttle Discovery's Return to Flight mission STS-114 is moved into position.  The canister will be lifted up to the Payload Changeout Room where the STS-114 payloads will be removed.  Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2).  Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment.  The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box.  The ESP-2 is outfitted with replacement parts.  Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1289
KENNEDY SPACE CENTER, FLA. --  In the early light of morning, Space Shuttle Atlantis, mounted on a mobile launch platform, rolls a second time to Launch Pad 39A atop a crawler transporter.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Jim Grossmann
KSC-07pd1186
KENNEDY SPACE CENTER, FLA. --  Reflected in the water of the Banana River is Space Shuttle Atlantis, sitting on Launch Pad 39A.  Atlantis rolled out to the pad for the second time before dawn.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Ken Thornsley
KSC-07pd1204
KENNEDY SPACE CENTER, FLA. - At Launch Pad 39B, the payload canister that delivered payloads launching aboard Space Shuttle Discovery's Return to Flight mission STS-114 is lowered from the Payload Changeout Room. The payloads will be installed into Discovery, scheduled to arrive at the pad later today. Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2). Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment. The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box. The ESP-2 is outfitted with replacement parts. Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1318
KENNEDY SPACE CENTER, FLA. --  Under a feather-painted sky, Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, creeps up the ramp to Launch Pad 39A.  This is the second rollout for the shuttle.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder
KSC-07pd1196
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform, rolls to Launch Pad 39A atop a crawler transporter just after sunrise.  First motion was at 5:02 a.m. EDT.  In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder
KSC-07pd1184
KENNEDY SPACE CENTER, FLA. --   From a vantage point across scrub lands and the Banana River, Space Shuttle Atlantis is seen finally sitting on Launch Pad 39A.  Atlantis rolled out to the pad for the second time before dawn.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Ken Thornsley
KSC-07pd1203
KENNEDY SPACE CENTER, FLA. --  An alligator, seen just above the shrubs, has a close-up view of Space Shuttle Atlantis as it sits on Launch Pad 39A. Atlantis rolled out to the pad before dawn for the second time.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Ken Thornsley
KSC-07pd1205
KENNEDY SPACE CENTER, FLA. --  In high bay No. 1 of the Vehicle Assembly Building, Space Shuttle Atlantis begins its return to Launch Pad 39A. First motion was at 5:02 a.m. EDT.   In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder
KSC-07pd1179
KENNEDY SPACE CENTER, FLA. --  The leading edge of the mobile launch platform atop a crawler transporter, and carrying Space Shuttle Atlantis, heads toward the gate of Launch Pad 39A.  This is the second rollout for the shuttle.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder
KSC-07pd1195
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform, rolls to Launch Pad 39A atop a crawler transporter at dawn.  First motion was at 5:02 a.m. EDT.  In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder
KSC-07pd1181
KENNEDY SPACE CENTER, FLA. --  Under a feather-painted sky, Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, nears Launch Pad 39A. This is the second rollout for the shuttle.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder
KSC-07pd1193
KENNEDY SPACE CENTER, FLA. - At Launch Pad 39B, the payload canister that delivered payloads launching aboard Space Shuttle Discovery's Return to Flight mission STS-114 is lowered from the Payload Changeout Room. The payloads will be installed into Discovery, scheduled to arrive at the pad later today. Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2). Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment. The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box. The ESP-2 is outfitted with replacement parts. Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1317
KENNEDY SPACE CENTER, FLA.  -  After dawn on Launch Pad 39B, the payload canister carrying payloads that will launch aboard Space Shuttle Discovery's Return to Flight mission STS-114 is lifted up to the Payload Changeout Room.  There the payloads will be removed.  Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2).  Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment.  The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box.  The ESP-2 is outfitted with replacement parts.  Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1290
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, begins the climb to the top of Launch Pad 39A.  First motion of the shuttle out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Jim Grossmann
KSC-07pd1192
KENNEDY SPACE CENTER, FLA. --  Reflected in water in a drainage canal, Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, heads for Launch Pad 39A.  This is the second rollout for the shuttle.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder
KSC-07pd1194
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, passes through the gate to Launch Pad 39A. First motion of the shuttle out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Jim Grossmann
KSC-07pd1190
KENNEDY SPACE CENTER, FLA. --  By midmorning, Space Shuttle Atlantis, mounted on a mobile launch platform, nears Launch Pad 39A atop a crawler transporter.  First motion of the shuttle out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Jim Grossmann
KSC-07pd1189
KENNEDY SPACE CENTER, FLA. --   This view of Space Shuttle Atlantis, mounted on a mobile launch platform, as it moves onto Launch Pad 39A also shows the expendable rocket launch pads in the background on the east side of the Banana River. This is the second rollout for the shuttle.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder
KSC-07pd1197
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, passes through the gate to Launch Pad 39A.  The flag is flying at half mast in recognition of Peace Officers Memorial Day as authorized by the President.  First motion of the shuttle out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Jim Grossmann
KSC-07pd1191
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform, rolls to Launch Pad 39A atop a crawler transporter at dawn.  First motion was at 5:02 a.m. EDT.  In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder
KSC-07pd1182
KENNEDY SPACE CENTER, FLA. - At Launch Pad 39B, the payload canister that delivered payloads launching aboard Space Shuttle Discovery's Return to Flight mission STS-114 is lowered from the Payload Changeout Room onto a transporter. The payloads will be installed into Discovery, scheduled to arrive at the pad later today. Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2). Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment. The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box. The ESP-2 is outfitted with replacement parts. Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1320
KENNEDY SPACE CENTER, FLA.  -  After dawn on Launch Pad 39B, the payload canister carrying payloads that will launch aboard Space Shuttle Discovery's Return to Flight mission STS-114 is lifted up to the Payload Changeout Room.  There the payloads will be removed.  Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2).  Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment.  The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box.  The ESP-2 is outfitted with replacement parts.  Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1291
KENNEDY SPACE CENTER, FLA.  -  In the dark before dawn, the payload canister carrying  payloads that will launch aboard Space Shuttle Discovery's Return to Flight mission STS-114  rolls toward Launch Pad 39B. There, it will be lifted up alongside the Rotating Service Structure to the Payload Changeout Room where the payloads will be removed.  Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2).  Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment.  The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box.  The ESP-2 is outfitted with replacement parts.  Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1288
KENNEDY SPACE CENTER, FLA. - At Launch Pad 39B, the payload canister that delivered payloads launching aboard Space Shuttle Discovery's Return to Flight mission STS-114 is lowered from the Payload Changeout Room. The payloads will be installed into Discovery, scheduled to arrive at the pad later today. Discovery’s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2). Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment. The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box. The ESP-2 is outfitted with replacement parts. Discovery’s launch window extends from July 13 through July 31.
KSC-05pd-1319
KENNEDY SPACE CENTER, FLA. --   By midmorning, Space Shuttle Atlantis, mounted on a mobile launch platform, nears Launch Pad 39A atop a crawler transporter.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Jim Grossmann
KSC-07pd1188
KENNEDY SPACE CENTER, FLA. --  Just after sunrise, Space Shuttle Atlantis, mounted on a mobile launch platform, rolls a second time to Launch Pad 39A atop a crawler transporter.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Jim Grossmann
KSC-07pd1185
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis rolls through the doors of high bay No. 1 of the Vehicle Assembly Building for its return to Launch Pad 39A.  First motion was at 5:02 a.m. EDT.  In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder
KSC-07pd1180
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform, rolls to Launch Pad 39A atop a crawler transporter at sunrise.  First motion was at 5:02 a.m. EDT.  In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder
KSC-07pd1183
KENNEDY SPACE CENTER, FLA. --  Casting giant shadows just after sunrise, Space Shuttle Atlantis, mounted on a mobile launch platform, rolls a second time to Launch Pad 39A atop a crawler transporter.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Jim Grossmann
KSC-07pd1187
CAPE CANAVERAL, Fla. - STS-130 Mission Specialist Kathryn Hire, left, and Pilot Terry Virts inspect the thermal protection system tiles under space shuttle Endeavour following its successful landing on Runway 15 at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. After 14 days in space, Endeavour's 5.7-million-mile STS-130 mission was completed on orbit 217.  Main gear touchdown was at 10:20:31 p.m. EST followed by nose gear touchdown at 10:20:39 p.m. and wheels stop at 10:22:10 p.m.  It was the 23rd night landing in shuttle history and the 17th at Kennedy.  During Endeavour's STS-130 mission, astronauts installed the Tranquility node, a module that provides additional room for crew members and many of the station's life support and environmental control systems. Attached to Tranquility is a cupola with seven windows that provide a panoramic view of Earth, celestial objects and visiting spacecraft. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  The orbiting laboratory is approximately 90 percent complete now in terms of mass.  STS-130 was the 24th flight for Endeavour, the 32nd shuttle mission devoted to ISS assembly and maintenance, and the 130th shuttle mission to date.  For information on the STS-130 mission and crew, visit http:__www.nasa.gov_mission_pages_shuttle_shuttlemissions_sts130_index.html.  Photo credit: NASA_Kim Shiflett
KSC-2010-1839
CAPE CANAVERAL, Fla. - STS-130 Commander George Zamka inspects the thermal protection system tiles under space shuttle Endeavour following its successful landing on Runway 15 at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. After 14 days in space, Endeavour's 5.7-million-mile STS-130 mission was completed on orbit 217.  Main gear touchdown was at 10:20:31 p.m. EST followed by nose gear touchdown at 10:20:39 p.m. and wheels stop at 10:22:10 p.m.  It was the 23rd night landing in shuttle history and the 17th at Kennedy.  During Endeavour's STS-130 mission, astronauts installed the Tranquility node, a module that provides additional room for crew members and many of the station's life support and environmental control systems. Attached to Tranquility is a cupola with seven windows that provide a panoramic view of Earth, celestial objects and visiting spacecraft. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  The orbiting laboratory is approximately 90 percent complete now in terms of mass.  STS-130 was the 24th flight for Endeavour, the 32nd shuttle mission devoted to ISS assembly and maintenance, and the 130th shuttle mission to date.  For information on the STS-130 mission and crew, visit http:__www.nasa.gov_mission_pages_shuttle_shuttlemissions_sts130_index.html.  Photo credit: NASA_Kim Shiflett
KSC-2010-1838
CAPE CANAVERAL, Fla. - NASA Administrator Charles Bolden examines the thermal protection system tiles under space shuttle Endeavour following its successful landing on Runway 15 at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. After 14 days in space, Endeavour's 5.7-million-mile STS-130 mission was completed on orbit 217.  Main gear touchdown was at 10:20:31 p.m. EST followed by nose gear touchdown at 10:20:39 p.m. and wheels stop at 10:22:10 p.m.  It was the 23rd night landing in shuttle history and the 17th at Kennedy.  During Endeavour's STS-130 mission, astronauts installed the Tranquility node, a module that provides additional room for crew members and many of the station's life support and environmental control systems. Attached to Tranquility is a cupola with seven windows that provide a panoramic view of Earth, celestial objects and visiting spacecraft. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  The orbiting laboratory is approximately 90 percent complete now in terms of mass.  STS-130 was the 24th flight for Endeavour, the 32nd shuttle mission devoted to ISS assembly and maintenance, and the 130th shuttle mission to date.  For information on the STS-130 mission and crew, visit http:__www.nasa.gov_mission_pages_shuttle_shuttlemissions_sts130_index.html.  Photo credit: NASA_Kim Shiflett
KSC-2010-1832
KENNEDY SPACE CENTER, FLA. --   Viewed across an arm of the Banana River, Space Shuttle Atlantis sits on Launch Pad 39A.  At right of the pad is the 300,000-gallon water tower that provides the water for sound suppression during liftoff.  Atlantis rolled out to the pad for the second time before dawn.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Ken Thornsley
KSC-07pd1201
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform, finally rests on the hard stand of Launch Pad 39A after an early morning rollout.  This is the second rollout for the shuttle. Seen on either side of the main engine exhaust hole on the launcher platform are the tail service masts. Their function is to provide umbilical connections for liquid oxygen and liquid hydrogen lines to fuel the external tank from storage tanks adjacent to the launch pad. Other umbilical lines carry helium and nitrogen, as well as ground electrical power and connections for vehicle data and communications. First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder
KSC-07pd1200
KENNEDY SPACE CENTER, FLA. --   Space Shuttle Atlantis, mounted on a mobile launch platform, finally rests next to the fixed service structure on the hard stand of Launch Pad 39A after an early morning rollout.  Seen at the top of the service structure is the 80-foot-tall lightning mast.  Atlantis rolled out to the pad for the second time before dawn.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Ken Thornsley
KSC-07pd1202
KENNEDY SPACE CENTER, FLA. --    Space Shuttle Atlantis, mounted on a mobile launch platform, finally rests on the hard stand of Launch Pad 39A.   At bottom left is the White Room, which is situated on the end of the fixed service structure's orbiter access arm.  At the top of the photo, in the background, is the Atlantic Ocean.   This is the second rollout for the shuttle.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder
KSC-07pd1198
KENNEDY SPACE CENTER, FLA. -  Lights on Launch Pad 39B put Space Shuttle Discovery in the spotlight after the rollback of the Rotating Service Structure (at left).  The Space Shuttle sits on the Mobile Launcher Platform (MLP), which is 25 ft. high, 160 ft. long and 135 ft. wide. An MLP weighs 8,230,000 pounds. At the launch pad, with a fueled Shuttle on the 6-inch-thick decks, it weighs approximately12,700,000 pounds.   There are three exhaust openings in the main deck of an MLP. Two are for the exhaust of the SRBs at launch and the third, a center opening, is for the exhaust from the main engines. SRB exhaust holes are 42 ft. long and 20 ft. wide. The main engine hole is 34 ft. long and 31 ft. wide.  Discovery is scheduled to launch on the historic Return to Flight mission STS-114 at 3:51 p.m. July 13 with a crew of seven.  On the mission to the International Space Station the crew will perform inspections on orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay.  During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure.
KSC-05pd-1502
KENNEDY SPACE CENTER, FLA. -  Lights on Launch Pad 39B put Space Shuttle Discovery in the spotlight after the rollback of the Rotating Service Structure.  The Space Shuttle sits on the Mobile Launcher Platform (MLP), which is 25 ft. high, 160 ft. long and 135 ft. wide. An MLP weighs 8,230,000 pounds. At the launch pad, with a fueled Shuttle on the 6-inch-thick decks, it weighs approximately12,700,000 pounds.   There are three exhaust openings in the main deck of an MLP. Two are for the exhaust of the SRBs at launch and the third, a center opening, is for the exhaust from the main engines. SRB exhaust holes are 42 ft. long and 20 ft. wide. The main engine hole is 34 ft. long and 31 ft. wide.  Discovery is scheduled to launch on the historic Return to Flight mission STS-114 at 3:51 p.m. July 13 with a crew of seven.  On the mission to the International Space Station the crew will perform inspections on orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay.  During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure.
KSC-05pd-1501
CAPE CANAVERAL, Fla. - From left, STS-130 Commander George Zamka, Mission Specialist Kathryn Hire and Pilot Terry Virts inspect the thermal protection system tiles under space shuttle Endeavour following its successful landing on Runway 15 at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. After 14 days in space, Endeavour's 5.7-million-mile STS-130 mission was completed on orbit 217.  Main gear touchdown was at 10:20:31 p.m. EST followed by nose gear touchdown at 10:20:39 p.m. and wheels stop at 10:22:10 p.m.  It was the 23rd night landing in shuttle history and the 17th at Kennedy.  During Endeavour's STS-130 mission, astronauts installed the Tranquility node, a module that provides additional room for crew members and many of the station's life support and environmental control systems. Attached to Tranquility is a cupola with seven windows that provide a panoramic view of Earth, celestial objects and visiting spacecraft. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  The orbiting laboratory is approximately 90 percent complete now in terms of mass.  STS-130 was the 24th flight for Endeavour, the 32nd shuttle mission devoted to ISS assembly and maintenance, and the 130th shuttle mission to date.  For information on the STS-130 mission and crew, visit http:__www.nasa.gov_mission_pages_shuttle_shuttlemissions_sts130_index.html.  Photo credit: NASA_Kim Shiflett
KSC-2010-1840
KENNEDY SPACE CENTER, FLA. --   Space Shuttle Atlantis, mounted on a mobile launch platform, finally rests on the hard stand of Launch Pad 39A, straddling the flame trench. This is the second rollout for the shuttle.  The flame trench transecting the pad's mound at ground level is 490 feet long, 58 feet wide and 40 feet high. It is made of concrete and refractory brick. Pad structures are insulated from the intense heat of launch by the flame deflector system, which protects the flame trench floor and the pad surface along the top of the flame trench.  On the left of the shuttle are the fixed service structure and rotating service structure in open position.  When closed, the rotating structure provides protected access to the orbiter for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench.  The white area in the center is the Payload Changeout Room, an enclosed, environmentally controlled portion of the rotating service structure that supports payload delivery at the launch pad and subsequent vertical installation in the orbiter payload bay.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder
KSC-07pd1199