The engine vertical installer for NASA’s Space Launch System (SLS) is inside the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer is being lifted up by crane for transfer to High Bay 3. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) is inside the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer is being lifted up by crane for transfer to High Bay 3. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) is inside the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer will be lifted up by crane for transfer to High Bay 3. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) is inside the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on April 25, 2019. Preparations are underway to lift the engine installer up and into High Bay 3. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) arrives inside the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) arrives inside the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) is being lifted by crane in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be transferred into High Bay 3 where it will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) arrives at the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) arrives inside the Vehicle Assembly at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) arrives by large transport truck at the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be ready for preflight assembly in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) arrives by large transport truck at NASA’s Kennedy Space Center in Florida on April 25, 2019. The engine installer arrived from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be delivered to the Vehicle Assembly where it will be ready for preflight processing in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
The engine vertical installer for NASA’s Space Launch System (SLS) arrives by large transport truck at NASA’s Kennedy Space Center in Florida on April 25, 2019, from the manufacturer, Precision Fabrication and Cleaning in Canaveral Groves, Florida. The new ground support equipment will be delivered to the Vehicle Assembly Building where it will be ready for preflight assembly in the event one of the four RS-25 engines on the core stage of the SLS rocket needs to be replaced. During launch of the SLS and Orion spacecraft, the four core stage engines will provide the thrust needed to lift the rocket and Orion spacecraft off Launch Pad 39B at Kennedy for Exploration Mission-1. The uncrewed Orion will travel on a three-week test mission thousands of miles beyond the Moon and back to Earth for a splashdown in the Pacific Ocean.
Engine Vertical Installer Arrival
Employees maneuver a vertical engine installer into place on the A-1 Test Stand at Stennis Space Center on Sept. 23. Installation of the equipment was a milestone event as the historic stand underwent modifications for testing the powerpack component of NASA's new J-2X rocket engine in development.
A-1 Test Stand modifications
Crews prepare to place the RS-25 engine on the engine vertical installer, which raises the engine, so technicians can attach the engine on the Fred Haise Test Stand at NASA’s Stennis Space Center on Aug. 30.
NASA Achieves Milestone for Engines to Power Future Artemis Missions
Installation of the Last Major Beam autographed by construction workers, NASA, and Corps of Engineers employees atop the Kennedy Space Center Vertical Assembly Building (VAB), MILA.
VAB Topping Off Ceremony
Once crews place the RS-25 engine on the engine vertical installer and it is attached to the Fred Haise Test Stand at NASA’s Stennis Space Center, the installer moves away, and technicians ensure all connections to the test facility are complete for the second certification test series to collect data for the final RS-25 design certification review.
NASA Achieves Milestone for Engines to Power Future Artemis Missions
S93-43619 (18 Aug 1993) --- At Launch Pad 39B, work is under way to remove and replace the three main engines on the Space Shuttle Discovery.  Here, Rocketdyne workers Jim Tibble (left), John Mooney and Ken Bair are assisting with the removal of the first engine, main engine no. 1, using the engine vertical installer.  A failed sensor in main engine no. 2 led to the shutdown of all three engines three seconds before liftoff of mission STS-51 on August 12, 1993.  Because it is difficult to perform the necessary inspections, refurbishment, and retesting of a fired engine on a vehicle at the pad, NASA opted to install a fresh set of engines on Discovery.
View of three main engines in preparation for STS-51
KENNEDY SPACE CENTER, FLA. -  Workers in KSC's Vertical Processing Facility install a solid state recorder into a transport assembly in its protective enclosure as part of the prelaunch preparations for STS-82, the second Hubble Space Telescope servicing mission.  The digital solid state recorder will replace one of three engineering/science tape recorders on Hubble.  The solid state recorder has no moving parts to wear out.  It also is more flexible than a reel-to-reel recorder and can store 10 times as much data.  Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility install a solid state recorder into a transport assembly in its protective enclosure as part of the prelaunch preparations for STS-82, the second Hubble Space Telescope servicing mission. The digital solid state recorder will replace one of three engineering/science tape recorders on Hubble. The solid state recorder has no moving parts to wear out. It also is more flexible than a reel-to-reel recorder and can store 10 times as much data. Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.
KENNEDY SPACE CENTER, FLA. -  Workers in KSC's Vertical Processing Facility prepare a solid state recorder for installation in a protective enclosure as part of the prelaunch preparations for STS-82, the second Hubble Space Telescope servicing mission.  The digital solid state recorder will replace one of three engineering/science tape recorders on Hubble.  The solid state recorder has no moving parts to wear out.  It also is more flexible than a reel-to-reel recorder and can store 10 times as much data.  Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility prepare a solid state recorder for installation in a protective enclosure as part of the prelaunch preparations for STS-82, the second Hubble Space Telescope servicing mission. The digital solid state recorder will replace one of three engineering/science tape recorders on Hubble. The solid state recorder has no moving parts to wear out. It also is more flexible than a reel-to-reel recorder and can store 10 times as much data. Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.
With the Soyuz TMA-06M spacecraft safely installed inside, the upper stage of its Soyuz booster rocket rests in the vertical position in the Integration Facility at the Baikonur Cosmodrome in Kazakhstan October 16, 2012. The Soyuz is being prepared for launch October 23 to the International Space Station with NASA Flight Engineer Kevin Ford, Soyuz Commander Oleg Novitskiy and Flight Engineer Evgeny Tarelkin for a five-month mission on the orbital laboratory. NASA/Victor Zelentsov
jsc2012e221283
With the Soyuz TMA-06M spacecraft safely installed inside, the upper stage of its Soyuz booster rocket is rotated to the vertical position in the Integration Facility at the Baikonur Cosmodrome in Kazakhstan October 16, 2012. The Soyuz is being prepared for launch October 23 to the International Space Station with NASA Flight Engineer Kevin Ford, Soyuz Commander Oleg Novitskiy and Flight Engineer Evgeny Tarelkin for a five-month mission on the orbital laboratory. NASA/Victor Zelentsov
jsc2012e221282
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, seen here is the vertical stabilizer on the orbiter Discovery.  On the edge of the stabilizer are the four Rudder Speed Brake Actuators recently installed.  Below is the engine number 1 interface. Discovery has been assigned to the first Return to Flight mission, STS-114, a logistics flight to the International Space Station.
KSC-04pd0951
This image depicts a Boeing worker installing an F-1 engine on the Saturn V S-IC flight stage at the Michoud Assembly Facility (MAF). The Saturn IB and Saturn V first stages were manufactured at the MAF, located 24 kilometers (approximately 15 miles) east of downtown New Orleans, Louisiana. The prime contractors, Chrysler and Boeing, jointly occupied the MAF. The basic manufacturing building boasted 43 acres under one roof. By 1964, NASA added a separate engineering and office building, vertical assembly building, and test stage building.
Saturn Apollo Program
Teams at NASA’s Michoud Assembly Facility in New Orleans lift the 130-foot-tall liquid hydrogen tank off the vertical assembly center on Nov. 14. This is the fourth liquid hydrogen tank manufactured at the facility for the agency’s SLS (Space Launch System) rocket. The completed tank will be loaded into a production cell for technicians to remove the lift tool, perform dimensional scans, and then install brackets, which will allow the move crew to break the tank over from a vertical to a horizontal configuration.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.    Image credit: NASA/Michael DeMocker
Fourth Liquid Hydrogen Tank for NASA’s Space Launch System Rocket Assembled
Teams at NASA’s Michoud Assembly Facility in New Orleans lift the 130-foot-tall liquid hydrogen tank off the vertical assembly center on Nov. 14. This is the fourth liquid hydrogen tank manufactured at the facility for the agency’s SLS (Space Launch System) rocket. The completed tank will be loaded into a production cell for technicians to remove the lift tool, perform dimensional scans, and then install brackets, which will allow the move crew to break the tank over from a vertical to a horizontal configuration.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.    Image credit: NASA/Michael DeMocker
Fourth Liquid Hydrogen Tank for NASA’s Space Launch System Rocket Assembled
Teams at NASA’s Michoud Assembly Facility in New Orleans lift the 130-foot-tall liquid hydrogen tank off the vertical assembly center on Nov. 14. This is the fourth liquid hydrogen tank manufactured at the facility for the agency’s SLS (Space Launch System) rocket. The completed tank will be loaded into a production cell for technicians to remove the lift tool, perform dimensional scans, and then install brackets, which will allow the move crew to break the tank over from a vertical to a horizontal configuration.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.    Image credit: NASA/Michael DeMocker
Fourth Liquid Hydrogen Tank for NASA’s Space Launch System Rocket Assembled
Teams at NASA’s Michoud Assembly Facility in New Orleans lift the 130-foot-tall liquid hydrogen tank off the vertical assembly center on Nov. 14. This is the fourth liquid hydrogen tank manufactured at the facility for the agency’s SLS (Space Launch System) rocket. The completed tank will be loaded into a production cell for technicians to remove the lift tool, perform dimensional scans, and then install brackets, which will allow the move crew to break the tank over from a vertical to a horizontal configuration.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.    Image credit: NASA/Michael DeMocker
Fourth Liquid Hydrogen Tank for NASA’s Space Launch System Rocket Assembled
Teams at NASA’s Michoud Assembly Facility in New Orleans lift the 130-foot-tall liquid hydrogen tank off the vertical assembly center on Nov. 14. This is the fourth liquid hydrogen tank manufactured at the facility for the agency’s SLS (Space Launch System) rocket. The completed tank will be loaded into a production cell for technicians to remove the lift tool, perform dimensional scans, and then install brackets, which will allow the move crew to break the tank over from a vertical to a horizontal configuration.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.    Image credit: NASA/Michael DeMocker
Fourth Liquid Hydrogen Tank for NASA’s Space Launch System Rocket Assembled
Teams at NASA’s Michoud Assembly Facility in New Orleans lift the 130-foot-tall liquid hydrogen tank off the vertical assembly center on Nov. 14. This is the fourth liquid hydrogen tank manufactured at the facility for the agency’s SLS (Space Launch System) rocket. The completed tank will be loaded into a production cell for technicians to remove the lift tool, perform dimensional scans, and then install brackets, which will allow the move crew to break the tank over from a vertical to a horizontal configuration.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.    Image credit: NASA/Michael DeMocker
Fourth Liquid Hydrogen Tank for NASA’s Space Launch System Rocket Assembled
Teams at NASA’s Michoud Assembly Facility in New Orleans lift the 130-foot-tall liquid hydrogen tank off the vertical assembly center on Nov. 14. This is the fourth liquid hydrogen tank manufactured at the facility for the agency’s SLS (Space Launch System) rocket. The completed tank will be loaded into a production cell for technicians to remove the lift tool, perform dimensional scans, and then install brackets, which will allow the move crew to break the tank over from a vertical to a horizontal configuration.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.    Image credit: NASA/Michael DeMocker
Fourth Liquid Hydrogen Tank for NASA’s Space Launch System Rocket Assembled
Teams move a liquid oxygen tank – designated for the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission – from the thermal protection system application cell at NASA’s Michoud Assembly Facility in New Orleans to the site’s 210-foot-tall Vertical Assembly Building on July 9. Next, NASA’s SLS prime contractor, Boeing, will vertically install the tank’s aft sump subassembly.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Assembly Building at Michoud
Teams move a liquid oxygen tank – designated for the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission – from the thermal protection system application cell at NASA’s Michoud Assembly Facility in New Orleans to the site’s 210-foot-tall Vertical Assembly Building on July 9. Next, NASA’s SLS prime contractor, Boeing, will vertically install the tank’s aft sump subassembly.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Assembly Building at Michoud
Teams move a liquid oxygen tank – designated for the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission – from the thermal protection system application cell at NASA’s Michoud Assembly Facility in New Orleans to the site’s 210-foot-tall Vertical Assembly Building on July 9. Next, NASA’s SLS prime contractor, Boeing, will vertically install the tank’s aft sump subassembly.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Assembly Building at Michoud
Teams move a liquid oxygen tank – designated for the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission – from the thermal protection system application cell at NASA’s Michoud Assembly Facility in New Orleans to the site’s 210-foot-tall Vertical Assembly Building on July 9. Next, NASA’s SLS prime contractor, Boeing, will vertically install the tank’s aft sump subassembly.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Assembly Building at Michoud
Teams move a liquid oxygen tank – designated for the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission – from the thermal protection system application cell at NASA’s Michoud Assembly Facility in New Orleans to the site’s 210-foot-tall Vertical Assembly Building on July 9. Next, NASA’s SLS prime contractor, Boeing, will vertically install the tank’s aft sump subassembly.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Assembly Building at Michoud
Teams move a liquid oxygen tank – designated for the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission – from the thermal protection system application cell at NASA’s Michoud Assembly Facility in New Orleans to the site’s 210-foot-tall Vertical Assembly Building on July 9. Next, NASA’s SLS prime contractor, Boeing, will vertically install the tank’s aft sump subassembly.  The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Assembly Building at Michoud
The thrust stand in the Rocket Engine Test Facility at the National Aeronautics and Space Administration (NASA) Lewis Research Center in Cleveland, Ohio. The Rocket Engine Test Facility was constructed in the mid-1950s to expand upon the smaller test cells built a decade before at the Rocket Laboratory. The $2.5-million Rocket Engine Test Facility could test larger hydrogen-fluorine and hydrogen-oxygen rocket thrust chambers with thrust levels up to 20,000 pounds. Test Stand A, seen in this photograph, was designed to fire vertically mounted rocket engines downward. The exhaust passed through an exhaust gas scrubber and muffler before being vented into the atmosphere.     Lewis researchers in the early 1970s used the Rocket Engine Test Facility to perform basic research that could be utilized by designers of the Space Shuttle Main Engines. A new electronic ignition system and timer were installed at the facility for these tests. Lewis researchers demonstrated the benefits of ceramic thermal coatings for the engine’s thrust chamber and determined the optimal composite material for the coatings. They compared the thermal-coated thrust chamber to traditional unlined high-temperature thrust chambers. There were more than 17,000 different configurations tested on this stand between 1973 and 1976.   The Rocket Engine Test Facility was later designated a National Historic Landmark for its role in the development of liquid hydrogen as a propellant.
Test Stand at the Rocket Engine Test Facility
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans.  While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions.  The 212-foot core stage with its RS-25 engines will provide more than 2 million pounds of thrust at launch. With Artemis, NASA will land the first woman and the first person of color on the Moon and establish long-term exploration in preparation for missions to Mars. SLS and NASA’s Orion spacecraft, along with the commercial human landing system and the Gateway in orbit around the Moon, are NASA’s backbone for deep space exploration. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Artemis II Engine Section Moves to Final Assembly
CAPE CANAVERAL, Fla. -  At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister arrives beneath the payload changeout room in the rotating service structure (left).  Space shuttle Atlantis is at right.  The two tail service masts on the mobile launcher platform flank the engines in front of the wings.  The canister carries a cargo of four carriers holding various equipment for the STS-125 mission aboard Atlantis to service NASA’s Hubble Space Telescope.  At the pad, the cargo will be moved into the Payload Changeout Room.  The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the shuttle’s payload bay. Launch of Atlantis is targeted for Oct. 10.  Photo credit: NASA/Troy Cryder
KSC-08pd2785
CAPE CANAVERAL, Fla. -  At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister, at left, is lifted from its transporter toward the payload changeout room in the rotating service structure.  The canister carries a cargo of four carriers holding various equipment for the STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope.  Atlantis is seen at right, atop the mobile launcher platform. The two tail service masts flank the engines in front of the wings.  At the pad, the cargo will be moved into the Payload Changeout Room.  The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the shuttle’s payload bay. Launch of Atlantis is targeted for Oct. 10.  Photo credit: NASA/Troy Cryder
KSC-08pd2786
Teams at NASA’s Michoud Assembly Facility in New Orleans lift a liquid oxygen tank from a horizontal to a vertical position and place it into a production cell on July 12. The process, called a breakover, will allow technicians to rappel into the empty tank and install its aft sump subassembly, securing it from the inside. This tank will be used on the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Configuration at Michoud
Teams at NASA’s Michoud Assembly Facility in New Orleans lift a liquid oxygen tank from a horizontal to a vertical position and place it into a production cell on July 12. The process, called a breakover, will allow technicians to rappel into the empty tank and install its aft sump subassembly, securing it from the inside. This tank will be used on the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Configuration at Michoud
Teams at NASA’s Michoud Assembly Facility in New Orleans lift a liquid oxygen tank from a horizontal to a vertical position and place it into a production cell on July 12. The process, called a breakover, will allow technicians to rappel into the empty tank and install its aft sump subassembly, securing it from the inside. This tank will be used on the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Configuration at Michoud
Teams at NASA’s Michoud Assembly Facility in New Orleans lift a liquid oxygen tank from a horizontal to a vertical position and place it into a production cell on July 12. The process, called a breakover, will allow technicians to rappel into the empty tank and install its aft sump subassembly, securing it from the inside. This tank will be used on the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Configuration at Michoud
Teams at NASA’s Michoud Assembly Facility in New Orleans lift a liquid oxygen tank from a horizontal to a vertical position and place it into a production cell on July 12. The process, called a breakover, will allow technicians to rappel into the empty tank and install its aft sump subassembly, securing it from the inside. This tank will be used on the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Configuration at Michoud
Teams at NASA’s Michoud Assembly Facility in New Orleans lift a liquid oxygen tank from a horizontal to a vertical position and place it into a production cell on July 12. The process, called a breakover, will allow technicians to rappel into the empty tank and install its aft sump subassembly, securing it from the inside. This tank will be used on the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Configuration at Michoud
Teams at NASA’s Michoud Assembly Facility in New Orleans lift a liquid oxygen tank from a horizontal to a vertical position and place it into a production cell on July 12. The process, called a breakover, will allow technicians to rappel into the empty tank and install its aft sump subassembly, securing it from the inside. This tank will be used on the core stage of NASA’s SLS (Space Launch System) rocket for its Artemis III mission. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit and to the lunar surface for Artemis.
Artemis III Liquid Oxygen Tank Moves to Vertical Configuration at Michoud
Men stand in front of turning vanes inside the Altitude Wind Tunnel (AWT) at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory. The AWT was the only wind tunnel capable of testing full-size aircraft engines in simulated altitude conditions. A large wooden drive fan, located on the other side of these vanes, created wind speeds up to 500 miles per hour. The drive shaft connected the fan to the induction motor located in an adjacent building.        Turning vanes were located in each corner of the rectangular tunnel to straighten the airflow and direct it around the corners. This set of vanes was located in the 31-foot-diameter southeast corner of the tunnel. These elliptical panels consisted of 36 to 42 vertical vanes that were supported by three horizontal supports. The individual vanes were 2.5 feet long and half-moon shaped. The panel of vanes was affixed to the curved corner rings of the tunnel. Each set of turning vanes had a moveable vane in the middle of the lower level for personnel access.    Each set of vanes took weeks to assemble before they were installed during the summer of 1943. This publicity photograph was taken just weeks after the tunnel became operational in February 1944.
Turning Vanes inside the Altitude Wind Tunnel
National Aeronautics and Space Administration (NASA) researcher John Carpenter inspects an aircraft model with a four-fan thrust reverser which would be studied in the 9- by 15-Foot Low Speed Wind Tunnel at the Lewis Research Center. Thrust reversers were introduced in the 1950s as a means for slowing high-speed jet aircraft during landing. Engineers sought to apply the technology to Vertical and Short Takeoff and Landing (VSTOL) aircraft in the 1970s. The new designs would have to take into account shorter landing areas, noise levels, and decreased thrust levels. A balance was needed between the thrust reverser’s efficiency, its noise generation, and the engine’s power setting.     This model underwent a series of four tests in the 9- by 15-foot tunnel during April and May 1974. The model, with a high-wing configuration and no tail, was equipped with four thrust-reverser engines. The investigations included static internal aerodynamic tests on a single fan/reverser, wind tunnel isolated fan/reverser thrust tests, installation effects on a four-fan airplane model in a wind tunnel, and single reverser acoustic tests.     The 9-by 15 was built inside the return leg of the 8- by 6-Foot Supersonic Wind Tunnel in 1968. The facility generates airspeeds from 0 to 175 miles per hour to evaluate the aerodynamic performance and acoustic characteristics of nozzles, inlets, and propellers, and investigate hot gas re-ingestion of advanced VSTOL concepts. John Carpenter was a technician in the Wind Tunnels Service Section of the Test Installations Division.
NASA Researcher Examines an Aircraft Model with a Four-Fan Thrust Reverser
The Flight Research Building at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory is a 272- by 150-foot hangar with an internal height up to 90 feet. The hangar’s massive 37.5-foot-tall and 250-foot-long doors can be opened in sections to suit different size aircraft. The hangar has sheltered a diverse fleet of aircraft over the decades. These have ranged from World War II bombers to Cessna trainers and from supersonic fighter jets to a DC–9 airliner.       At the time of this September 1942 photograph, however, the hangar was being used as an office building during the construction of the laboratory. In December of 1941, the Flight Research Building became the lab’s first functional building. Temporary offices were built inside the structure to house the staff while the other buildings were completed. The hangar offices were used for an entire year before being removed in early 1943. It was only then that the laboratory acquired its first aircraft, pilots and flight mechanics.   The temporary one-story offices can be seen in this photograph inside the large sliding doors. Also note the vertical lift gate below the NACA logo. The gate was installed so that the tails of larger aircraft could pass into the hangar. The white Farm House that served as the Administration Building during construction can be seen in the distance to the left of the hangar.
Flight Research Building at the Aircraft Engine Research Laboratory
CAPE CANAVERAL, Fla. --   The setting sun backlights space shuttle Discovery on Launch Pad 39A at NASA's Kennedy Space Center just before rollback of the rotating service structure in preparation for launch on the STS-124 mission.  The structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots on a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory.  The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS.  The 14-day flight includes three spacewalks.  Launch is scheduled for 5:02 p.m. May 31. Photo credit: NASA/Troy Cryder
KSC-08pd1499
VANDENBERG AIR FORCE BASE, Calif. – Workers at Space Launch Complex 2 on Vandenberg Air Force Base in California monitor a solid rocket motor as it is raised into a vertical position for installation on the Delta II rocket for NASA's Soil Moisture Active Passive mission, or SMAP, in the mobile service tower.    SMAP will be launched on a Delta II 7320 configuration vehicle featuring a United Launch Alliance first stage booster powered by an Aerojet Rocketdyne RS-27A main engine and three Alliant Techsystems, or ATK, strap-on solid rocket motors. Once on station in Earth orbit, SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data also will be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch is scheduled for no earlier than November 2014. To learn more about SMAP, visit http://smap.jpl.nasa.gov.  Photo credit: NASA/Randy Beaudoin
KSC-2014-3598
This 22.5-foot-diameter domed lid was added to the Space Power Chambers to allow the vertical installation of a Centaur second-stage rocket into the vacuum tank at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The lid could be removed using a crane so that the Centaur could be lowered into the chamber. After a year of additional construction, the new dome and extension were completed in September 1963. The feature became the facility’s distinctive attribute. The modifications to the facility began two years earlier, however.    In 1961, NASA Lewis management decided to convert the Altitude Wind Tunnel into two large test chambers and later renamed it the Space Power Chambers. The conversion included the removal of the tunnel’s internal components and the insertion of bulkheads to seal off the new chambers within the tunnel. The 100-foot-long vacuum tank was created in the east leg of the tunnel, which was 31 feet in diameter at one end and 27 feet in diameter at the other.     With the transfer of the Centaur second-stage rocket program to NASA Lewis in October 1962, the newly completed Space Power Chambers facility had to be modified to accommodate the space vehicle. The goal of the test engineers was to subject the Centaur to long durations in conditions that would replicate those encountered during its missions in space. The facility was used for a variety of tests on the Centaur second-stage rocket until the early 1970s.
Dome Added to the Space Power Chambers for the Centaur Rocket
CAPE CANAVERAL, Fla. --   On Launch Pad 39A at NASA's Kennedy Space Center, the rotating service structure begins rolling on its axis to uncover space shuttle Discovery in preparation for launch on the STS-124 mission.  Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks (one is seen at bottom left) that move along circular twin rails installed flush with the pad surface. First motion was at 8:33 p.m. and rollback was complete at 9:07 p.m.  The structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots on a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory.  The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS.  The 14-day flight includes three spacewalks.  Launch is scheduled for 5:02 p.m. May 31. Photo credit: NASA/Troy Cryder
KSC-08pd1500
CAPE CANAVERAL, Fla. --    On Launch Pad 39A at NASA's Kennedy Space Center, the rotating service structure, or RSS, is rolling on its axis to uncover space shuttle Discovery in preparation for launch on the STS-124 mission. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks (one is seen at bottom left) that move along circular twin rails installed flush with the pad surface.  First motion was at 8:33 p.m. and rollback was complete at 9:07 p.m. The structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots on a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory.  The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS.  The 14-day flight includes three spacewalks.  Launch is scheduled for 5:02 p.m. May 31. Photo credit: NASA/Troy Cryder
KSC-08pd1501
CAPE CANAVERAL, Fla. --   On Launch Pad 39A at NASA's Kennedy Space Center, the rotating service structure, or RSS, has rolled back on its axis to uncover space shuttle Discovery, lighted against the night sky, in preparation for launch on the STS-124 mission. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks (one is seen at bottom left) that move along circular twin rails installed flush with the pad surface.  First motion was at 8:33 p.m. and rollback was complete at 9:07 p.m.  The structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots on a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch. Above the orange external tank is the oxygen vent hood, called the "beanie cap," at the end of the gaseous oxygen vent arm extending from the fixed service structure. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Below is the orbiter access arm with the White Room at the end, flush against the shuttle.  The White Room provides access into the shuttle.   The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory.  The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS.  The 14-day flight includes three spacewalks.  Launch is scheduled for 5:02 p.m. May 31. Photo credit: NASA/Troy Cryder
KSC-08pd1502
KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in spotlights.  Beneath the shuttle is the mobile launcher platform, which spans the flame trench below.  The flame deflector system includes an inverted, V-shaped steel structure that receives and deflects the flames from the orbiter main engines on one side; the opposite side deflects the flames from the solid rocket boosters.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett
KSC-06pd1312
CAPE CANAVERAL, Fla. --     Bathed in lights surrounding Launch Pad 39A and its structures at NASA's Kennedy Space Center, space shuttle Discovery is poised for launch on the STS-124 mission after rollback of the rotating service structure. First motion was at 8:33 p.m. and rollback was complete at 9:07 p.m.  The structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots on a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch.  Behind the shuttle is the orange external tank and the two solid rocket boosters (only one seen here).  Beneath the shuttle's starboard wing is one of two tail service masts, which provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory.  The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS.  The 14-day flight includes three spacewalks.  Launch is scheduled for 5:02 p.m. May 31. Photo credit: NASA/Troy Cryder
KSC-08pd1505
CAPE CANAVERAL, Fla. --    Against the dark sky, lights bathe space shuttle Discovery, revealed after rollback of the rotating service structure in preparation for launch on the STS-124 mission. First motion was at 8:33 p.m. and rollback was complete at 9:07 p.m.   The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots on a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch. Above the orange external tank is the oxygen vent hood, called the "beanie cap," at the end of the gaseous oxygen vent arm extending from the fixed service structure. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Below is the orbiter access arm with the White Room at the end, flush against the shuttle.  The White Room provides access into the shuttle.   The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory.  The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS.  The 14-day flight includes three spacewalks.  Launch is scheduled for 5:02 p.m. May 31. Photo credit: NASA/Troy Cryder
KSC-08pd1503
CAPE CANAVERAL, Fla. --     Bathed in lights surrounding Launch Pad 39A and its structures at NASA's Kennedy Space Center, space shuttle Discovery looks polished and ready for launch on the STS-124 mission after rollback of the rotating service structure. First motion was at 8:33 p.m. and rollback was complete at 9:07 p.m.   The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots on a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch. Along with the orange external tank and one of the two solid rocket boosters, the orbiter access arm is seen extended to the side of the shuttle.  At the end is the White Room, which provides access into the shuttle.  The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory.  The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS.  The 14-day flight includes three spacewalks.  Launch is scheduled for 5:02 p.m. May 31. Photo credit: NASA/Troy Cryder
KSC-08pd1504