Karma Snyder, a project manager at NASA's John C. Stennis Space Center, was a senior design engineer on the RL10 liquid rocket engine that powered the Centaur, the upper stage of the rocket used in NASA's Lunar CRater Observation and Sensing Satellite (LCROSS) mission in October 2009. Part of the LCROSS mission was to search for water on the moon by striking the lunar surface with a rocket stage, creating a plume of debris that could be analyzed for water ice and vapor. Snyder's work on the RL10 took place from 1995 to 2001 when she was a senior design engineer with Pratt & Whitney Rocketdyne. Years later, she sees the project as one of her biggest accomplishments in light of the LCROSS mission. 'It's wonderful to see it come into full service,' she said. 'As one of my co-workers said, the original dream was to get that engine to the moon, and we're finally realizing that dream.'
Stennis engineer part of LCROSS moon mission
LCROSS Family night at Ames. Dan Andrews with the LCROSS team addresses the crowd on family night.
ARC-2008-ACD08-0197-002
LCROSS Family night at Ames. Jennifer Heldmann of the LCROSS team address the crowd on family night.
ARC-2008-ACD08-0197-036
LCROSS Family night at Ames. Jennifer Heldmann of the LCROSS team address the crowd on family night.
ARC-2008-ACD08-0197-034
LCROSS Family night at Ames. Jennifer Heldmann of the LCROSS team address the crowd on family night.
ARC-2008-ACD08-0197-035
LCROSS flight hardware in clean room at Ames N-240. with Mark Shirley, LCROSS Northrup Grumman Redondo Beach, CA
ARC-2007-ACD07-0073-184
LCROSS - calibration and camera check out with Kim Ennico placing cover over rear LCROSS
ARC-2007-ACD07-0073-348
LCROSS Family night at Ames. LCROSS Program Executive, Victoria Friedensen address the crowd.
ARC-2008-ACD08-0197-001
LCROSS Impact Night: Media interviews with Brian Day, Planners Collaborative, Inc.  of the  NASA Ames' LCROSS team.
ARC-2009-ACD09-0220-050
LCROSS Impact Night From left to right: Khanh Trinh (Simulator Engineer), and Dan Andrews (LCROSS Project Manager) in background, John Bresina (Command Sequencing Engineer), and John Schreiner (Mission Operations Manager), shake hands  after confirmation the LCROSS spacecraft successfully impacted its target crater on the moon.
ARC-2009-ACD09-0220-126
LCROSS flight hardware in clean room at Ames N-240. with Mark Shirley, LCROSS Northrup Grumman Redondo Beach, CA and Kim Ennico, NASA Ames P.I.
ARC-2007-ACD07-0073-187
MoonFest: From Apollo to LCROSS and Beyond public event at NASA'S Ames Researc Center, Moffett Field, Calif.  For the sing along 'Water on the Moon'  lurics and music by John Mormiel, NASA LCROSS Deputy Project Manager.
ARC-2009-ACD09-0144-057
LCROSS flight hardware in clean room at Ames N-240. with Mark Shirley, LCROSS Northrup Grumman Redondo Beach, CA and Kim Ennico, NASA Ames P.I.
ARC-2007-ACD07-0073-189
LCROSS (Lunar Crater Observation Sensing Satellite) Near InfraRed Spectrometer shake test in Ames N-244 high bay EEL Lab - with Lynn Hofland, Ames EEL lab) and Kimberly Ennico, LCROSS payload scientist
ARC-2006-ACD06-0155-019
LCROSS (Lunar Crater Observation Sensing Satellite) Near InfraRed Spectrometer shake test in Ames N-244 high bay EEL Lab - with Lynn Hofland, Ames EEL lab) and Kimberly Ennico, LCROSS payload scientist
ARC-2006-ACD06-0155-017
LCROSS flight hardware in clean room at Ames N-240. with P.I.'s and EEL personnel preforming various tests with Mark Shirley, LCROSS Northrup Grumman Redondo Beach, CA
ARC-2007-ACD07-0073-194
LCROSS Family night at Ames
ARC-2008-ACD08-0197-021
LCROSS Family night at Ames
ARC-2008-ACD08-0197-023
LCROSS Family night at Ames
ARC-2008-ACD08-0197-030
LCROSS Family night at Ames
ARC-2008-ACD08-0197-016
LCROSS Family night at Ames
ARC-2008-ACD08-0197-012
LCROSS Family night at Ames
ARC-2008-ACD08-0197-007
LCROSS Family night at Ames
ARC-2008-ACD08-0197-010
LCROSS Family night at Ames
ARC-2008-ACD08-0197-026
LCROSS Family night at Ames
ARC-2008-ACD08-0197-003
LCROSS Family night at Ames
ARC-2008-ACD08-0197-008
LCROSS Family night at Ames
ARC-2008-ACD08-0197-011
LCROSS Family night at Ames
ARC-2008-ACD08-0197-031
LCROSS Family night at Ames
ARC-2008-ACD08-0197-004
LCROSS Family night at Ames
ARC-2008-ACD08-0197-006
LCROSS Family night at Ames
ARC-2008-ACD08-0197-014
LCROSS Family night at Ames
ARC-2008-ACD08-0197-027
LCROSS Family night at Ames
ARC-2008-ACD08-0197-028
LCROSS Family night at Ames
ARC-2008-ACD08-0197-020
LCROSS Family night at Ames
ARC-2008-ACD08-0197-015
LCROSS Family night at Ames
ARC-2008-ACD08-0197-025
LCROSS Family night at Ames
ARC-2008-ACD08-0197-005
LCROSS Family night at Ames
ARC-2008-ACD08-0197-029
LCROSS Family night at Ames
ARC-2008-ACD08-0197-032
LCROSS Family night at Ames
ARC-2008-ACD08-0197-022
LCROSS Family night at Ames
ARC-2008-ACD08-0197-009
LCROSS Family night at Ames
ARC-2008-ACD08-0197-033
LCROSS Family night at Ames
ARC-2008-ACD08-0197-013
LCROSS Family night at Ames
ARC-2008-ACD08-0197-024
LCROSS in Ames clean room  N-240
ARC-2007-ACD07-0073-308
LCROSS team member Dan Andrews in his office
ARC-2008-ACD08-0292-002
Dan Andrews, Project Manager LCROSS and Craig Tooley, Project Manager LRO (Lunar Reconnaissance Orbiter) in front of Spacecraft at the Astrotech facility titusville, FL during LRO/LCROSS media photo op event. The LCROSS mission's objective is to confirm the presence or absence of water ice in a permanently shadowed crater at the moon's South Pole.  (Photo by Jonis Dino AMES PAO, premission for use granted by Dan Andrews, image owner)
ARC-2009-ACD09-0084
LCROSS flight hardware in clean room at Ames N-240. with P.I.'s and EEL personnel preforming various tasks. Tony Colaprete LCROSS P. I. in foreground, Glen Sasaki and Jerry Wang Ames Electrical Evaluation Lab
ARC-2007-ACD07-0073-134
LCROSS in Ames clean room N-240- packing into a special made crate for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (Tony Colaprete (r) LCROSS P.I.)
ARC-2008-ACD07-0073-451
Lunar CRater Observation and Sensing Satellite (LCROSS) and P.I. at NASA Ames Research Center - (l to r) Kim Ennico, Damon Flansburg and Gi Kojima check out the LCROSS Total Luminance Photometer lens and electronics attached to a metal plate in preparation for a vibe (vibration) test on the shake table in N-2444 EEL Laboratory
ARC-2007-ACD07-0073-044
LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r) LCROSS P.I.)
ARC-2008-ACD07-0073-415
LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r) LCROSS P.I.)
ARC-2008-ACD07-0073-408
LCROSS flight hardware in clean room at Ames N-240:   Tony Colaprete NASA Ames P.I. explains the progress of the LCROSS project to Alan Stern, NASA Associate Administrator of the Science Mission Directorate (SMD) as he tours the Lab during his visit to Ames to meet with and talk to the Ames scientists and employees.
ARC-2007-ACD07-0073-202
Lunar CRater Observation and Sensing Satellite (LCROSS) and P.I. at NASA Ames Research Center - Total Luminance Photometer lens and electronics units on shake table in N-2444 EEL Laboratory with Lynn Hofland (techician/operator EEL) bolts two pieces of the LCROSS photometer to bigger shake table
ARC-2007-ACD07-0073-055
LCROSS in Ames clean room N-240- securing special made crate for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Tony Colaprete (l) LCROSS P.I. Steve Ord, Project Management Division (c) ) and Unknown)
ARC-2008-ACD07-0073-458
LCROSS in Ames clean room N-240- wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r), LCROSS P.I.)
ARC-2008-ACD07-0073-421
LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r) LCROSS P.I.)
ARC-2008-ACD07-0073-409
LCROSS in Ames clean room N-240- cleaning and wrapping for transfer to Northrup Grumman Redondo Beach, CA where more calibration will be done before finally being sent for mating with the LRO spacecraft (with Steve Ord, Project Management Division (l) and Tony Colaprete (r) LCROSS P.I.)
ARC-2008-ACD07-0073-412
LCROSS artwork. Credit Northrup Grumman   Image converted using ifftoany
ARC-2007-ACD06-0232-010
LCROSS flight hardware in clean room at Ames N-240.
ARC-2007-ACD07-0073-171
LCROSS flight hardware in clean room at Ames N-240.
ARC-2007-ACD07-0073-176
LCROSS flight hardware in clean room at Ames N-240.
ARC-2007-ACD07-0073-178
LCROSS in Ames clean room N-240  - during  calibration and camera checks
ARC-2007-ACD07-0073-353
LCROSS impact artwork credit line required Northrup Grumman
ARC-2007-ACD06-0232-014
LCROSS flight hardware in clean room at Ames N-240.
ARC-2007-ACD07-0073-172
LCROSS flight hardware in clean room at Ames N-240.  (back view)
ARC-2007-ACD07-0073-159
LCROSS flight hardware in clean room at Ames N-240.
ARC-2007-ACD07-0073-175
LCROSS flight hardware in clean room at Ames N-240.
ARC-2007-ACD07-0073-183
LCROSS in Clean Room at Ames Research Centeer -  flight hardware in Thermal Cycle configuration with _______
ARC-2007-ACD07-0073-105
LCROSS flight hardware in clean room at Ames N-240. with P.I.'s and EEL personnel preforming various tests
ARC-2007-ACD07-0073-119
LCROSS flight hardware in clean room at Ames N-240. with P.I.'s and EEL personnel preforming various tests
ARC-2007-ACD07-0073-196
LCROSS Family night at Ames. Dr. David Morrison Interim Director of the Lunar Science Institute at Ames addresses the crown.
ARC-2008-ACD08-0197-018
LCROSS in Ames clean room  N-240 -  Glen Sasaki securing all parts
ARC-2007-ACD07-0073-286
LCROSS in Clean Room at Ames Research Centeer -  flight hardware cable check and verification
ARC-2007-ACD07-0073-100
Lunar CRater Observation and Sensing Satellite (LCROSS) and P.I. at NASA Ames Research Center team in front of N-240A
ARC-2007-ACD07-0073-001
LCROSS in Ames clean room of N-240  - Calibration and camera chec out with Kim Ennico
ARC-2007-ACD07-0073-319
LCROSS flight hardware in clean room at Ames N-240. with P.I. Kim Ennico preforming various tasks
ARC-2007-ACD07-0073-162
LCROSS in Clean Room at Ames Research Centeer -  flight hardware cable check and verification
ARC-2007-ACD07-0073-092
LCROSS in Clean Room at Ames Research Centeer -  flight hardware cable check and verification with Kim Ennico
ARC-2007-ACD07-0073-079
LCROSS in Clean Room at Ames Research Centeer -  flight hardware cable check and verification
ARC-2007-ACD07-0073-098
LCROSS in Clean Room at Ames Research Centeer -  flight hardware cable check and verification with Kim Ennico
ARC-2007-ACD07-0073-078
Lunar CRater Observation and Sensing Satellite (LCROSS) and P.I. at NASA Ames Research Center
ARC-2007-ACD07-0073-017
LCROSS flight hardware in clean room at Ames N-240. with P.I.'s  (l - r)  Tony Colaprete and Dana Lynch
ARC-2007-ACD07-0073-170
LCROSS in Ames clean room  N-240 - Jerry Wang (L) and Glen Sasaki securing all parts
ARC-2007-ACD07-0073-280
LCROSS -  Tony Colaprete does some adjustment during calibration and camera check out
ARC-2007-ACD07-0073-312
LCROSS in Ames clean room of N-240  -  Tony Colaprete does some adjustment during calibration and camera check out
ARC-2007-ACD07-0073-314
Lunar CRater Observation and Sensing Satellite (LCROSS) and P.I. at NASA Ames Research Center
ARC-2007-ACD07-0073-018
LCROSS in Ames clean room N-240 - Calibration and camera chec out with Tony Colaprete, P.I.
ARC-2007-ACD07-0073-334
LCROSS in Ames clean room  N-240 - Jerry Wang (L) and Glen Sasaki securing all parts
ARC-2007-ACD07-0073-289
LCROSS in Ames clean room  N-240 - Calibration and camera check out with Kim Ennico, P.I.
ARC-2007-ACD07-0073-292
LCROSS in Ames clean room of N-240 - Calibration and camera check out with Tony Colaprete and Kim Ennico P.I.'s
ARC-2007-ACD07-0073-325
LCROSS in Clean Room at Ames Research Centeer -  flight hardware in Thermal Cycle configuration with _______
ARC-2007-ACD07-0073-106
LCROSS in Ames clean room  N-240 - Calibration and camera check out with Kim Ennico, P.I.
ARC-2007-ACD07-0073-309
LCROSS in Ames clean room N-240- cleaning for shipping to Northrup Grumman, Redondo Beach, CA
ARC-2008-ACD07-0073-381
LCROSS Family night at Ames. Dr. David Morrison Interim Director of the Lunar Science Institute at Ames addresses the crown.
ARC-2008-ACD08-0197-017
LCROSS in Ames clean room N-240 - cleaning for shippment to Northrup Grumman, Redondo Beach, CA
ARC-2008-ACD07-0073-399
LCROSS in Ames clean room N-240 - calibration and camera check out with Kim Ennico (Ed schilling is used as subject)
ARC-2007-ACD07-0073-344
LCROSS in Ames clean room of N-240 -  during calibration and camera check out Kim Ennico in background
ARC-2007-ACD07-0073-317
LCROSS in Clean Room at Ames Research Centeer -  flight hardware cable check and verification
ARC-2007-ACD07-0073-097
LCROSS -  Tony Colaprete does some adjustment during calibration and camera check out
ARC-2007-ACD07-0073-310