JOSH WHITE DEMONSTRATING THE CAPABILITIES OF THE SYSTEM TO AUTONOMOUSLY INSPECT AND MACHINE ADDITIVELY MANUFACTURED PARTS (SAIMAP).
ADVANCED MANUFACTURING TEAM
QUINCY BEAN OF MSFC’S ADVANCED MANUFACTURING TEAM, WITH TITANIUM ALLOY TURBOPUMP COMPONENT FABRICATED WITH MSFC’S ELECTRON BEAM MELTING SYSTEM (BACKGROUND).
ADVANCED MANUFACTURING TEAM
RON BROOKS (FOREGROUND) AND DON JAMES (BACKGROUND) USING THE SOLUMINA MANUFACTURING EXECUTION SYSTEM TO DELIVER AND EXECUTE WORK INSTRUCTIONS ON THE SHOP FLOOR.
ADVANCED MANUFACTURING TEAM
JOHNNIE CLARK, BRIAN WEST, AND ZACK JONES OF MSFC’S ADVANCED MANUFACTURING TEAM, WITH MSFC’S XLINE SELECTIVE LASER MELTING SYSTEM.  CURRENTLY ONE OF THE LARGEST METAL 3D PRINTERS, THE XLINE AT MARSHALL IS BEING USED TO DEVELOP AND CERTIFY NICKEL ALLOY 718 MATERIAL PROPERTIES AND LARGE MANUFACTURING TECH DEMOS FOR THE RS25 ENGINE AND THE COMMERCIAL CREWED VEHICLE PROJECTS.
ADVANCED MANUFACTURING TEAM
ZACK JONES AND JIM LYDON OF MSFC’S ADVANCED MANUFACTURING TEAM, WITH MSFC’S M2 SELECTIVE LASER MELTING SYSTEM.  THE M2 IS CURRENTLY DEDICATED TO ADVANCED COPPER MATERIAL DEVELOPMENT FOR THE LOW COST UPPER STAGE PROGRAM.
ADVANCED MANUFACTURING TEAM
QUINCY BEAN, JIM LYDON, AND ZACK JONES OF MSFC’S ADVANCED MANUFACTURING TEAM, WITH MSFC’S M2 SELECTIVE LASER MELTING SYSTEM.  THE M2 IS CURRENTLY DEDICATED TO ADVANCED COPPER MATERIAL DEVELOPMENT FOR THE LOW COST UPPER STAGE PROGRAM.
ADVANCED MANUFACTURING TEAM
JIM LYDON (LEFT-GREEN SHIRT) BRUSHES METALLIC POWDER OFF OF A RECENTLY PRINTED ROCKET PART EXAMINED BY ZACH JONES, RIGHT, IN MSFC'S ADDITIVE MANUFACTURING LAB
MSFC Additive Manufacturing Laboratory
RON LEE MANAGES THE 900 SQUARE FOOT TOOL CRIB IN BLDG. 4707
ADVANCED MANUFACTURING TEAM
JOHN IVESTER PERFORMING STRUCTURED LIGHT SCANNING OF HERITAGE HARDWARE TO CAPTURE THE AS-BUILT GEOMETRY.
ADVANCED MANUFACTURING TEAM
KEN COOPER, TEAM LEAD OF MSFC’S ADVANCED MANUFACTURING TEAM, WITH NICKEL ALLOY 718 PARTS FABRICATED USING THE M1 SELECTIVE LASER MELTING SYSTEM. THE M1 MACHINE IS DEDICATED TO BUILDING QUALIFICATION SAMPLES AND HARDWARE DEMONSTRATORS FOR THE RS25 ENGINE PROJECT.
ADVANCED MANUFACTURING TEAM
PHILLIP THOMPSON WRAPS PRESSURE VESSEL WITH COMPOSITE MATERIAL
ADVANCED MANUFACTURING TEAM
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF28
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF1
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF33
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF62
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF29
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF56
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF10
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF40
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF65
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF6
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF48
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF45
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF3
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF57
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF72
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF25
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF39
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF15
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF55
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF30
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF35
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF22
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF59
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF8
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF81
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF12
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF61
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF82
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF43
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF51
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF32
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF53
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF49
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF23
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF4
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF38
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF76
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF69
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF13
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF14
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF47
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF58
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF37
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF64
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF18
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF74
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF63
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF67
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF16
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF75
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF44
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF60
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF11
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF71
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF78
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF68
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF17
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF46
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF31
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF34
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF84
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF27
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF2
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF19
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF7
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF80
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF20
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF66
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF5
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF70
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF26
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF41
Exterior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF9
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF24
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF50
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF52
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF73
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF83
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF42
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF77
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF79
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF36
Interior View of ARF Manufacturing Building
KSC-20130319-PH-DD_ARF54
MATERIALS ENGINEER LARRY PELHAM OF NASA’S MARSHALL SPACE FLIGHT CENTER IN HUNTSVILLE, ALABAMA, OPERATES THE CEUS AUTOMATED FIBER PLACEMENT CYLINDRICAL MANUFACTURING TOOL IN BUILDING 4707. THE TOOL WILL BE USED BY THE COMPOSITES FOR EXPLORATION UPPER STAGE PROJECT AT MARSHALL, WHICH IS ANALYZING COMPOSITE MATERIALS TO SUPPORT FUTURE HARDWARE FOR NASA’S SPACE LAUNCH SYSTEM AND OTHER NEXT-GENERATION SPACECRAFT…
The CEUS automated fiber placement cylindrical manufacturing tool
Manufacturing Division (Code JM) Projects. Damon Flausburg working on STAR model in N-246 Metal Fabrications Br. (code-JMF)
ARC-1997-AC97-0221-9
Manufacturing Division (Code JM) Projects. Chris Radbourne on Cincinnati Hydro-Tel N-220 Model Machining & Contract fabrication Br Code-JMM
ARC-1997-AC97-0221-1
Manufacturing Division (Code JM) Projects. Damon Flausburg working on STAR model in N-246 Metal Fabrications Br. (code-JMF) Damon Flansburg
ARC-1997-AC97-0221-10
Manufacturing Division (Code JM) Projects. Chris Radbourne on Cincinnati Hydro-Tel N-220 Model Machining & Contract fabrication Br Code-JMM
ARC-1997-AC97-0221-2
jsc2022e031226 (4/26/2022) --- A mission overview of the Protein Manufacturing investigation shows hardware, operations, and scientific details. The Protein Manufacturing project demonstrates and tests the operation of a novel bioreactor technology to support robust fungal growth for the production of high-protein food in a low-Earth orbit, space environment. Image courtesy of BioServe.
Protein Manufacturing