CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata has a final fitting of his launch and entry suit.  Wakata will remain on the station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett
KSC-2009-2014
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson has the final fitting of his launch and entry suit.  Swanson is making his second shuttle flight.  The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett
KSC-2009-2016
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Richard Arnold signals he is ready for launch during the final fitting of his launch and entry suit.  Arnold is making his first shuttle flight.  The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett
KSC-2009-2012
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist John Phillips has a final fitting of his launch and entry suit and the helmet. Phillips is making his third shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett
KSC-2009-2018
CAPE CANAVERAL, Fla. – – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Joseph Acaba has a final fitting of his launch and entry suit.  Acaba is making his first shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett
KSC-2009-2013
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata puts on his helmet as part of the final fitting of his launch and entry suit.  Wakata is making his third shuttle flight.  He will remain on the station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett
KSC-2009-2015
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Richard Arnold gets help from a suit technician in the final fitting of his launch and entry suit. Arnold will be making his first shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett
KSC-2009-2017
KENNEDY SPACE CENTER, FLA. -  As part of pre-pack and fit check for Terminal Countdown Demonstration Test (TCDT) activities, STS-114 Mission Specialist Charles Camarda has his launch suit checked for fit.  The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad.  STS-114 is the first Return to Flight mission to the International Space Station.  The launch window extends July 13 through July 31.
KSC-05pd-0879
KENNEDY SPACE CENTER, FLA. -  As part of pre-pack and fit check for Terminal Countdown Demonstration Test (TCDT) activities, STS-114 Mission Specialist Andrew Thomas has his launch suit checked for fit.   The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad.  STS-114 is the first Return to Flight mission to the International Space Station.  The launch window extends July 13 through July 31.
KSC-05pd-0872
KENNEDY SPACE CENTER, FLA. -  As part of pre-pack and fit check for Terminal Countdown Demonstration Test (TCDT) activities, STS-114 Mission Specialist Stephen Robinson has his launch suit checked for fit.  The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad.  STS-114 is the first Return to Flight mission to the International Space Station.  The launch window extends July 13 through July 31.
KSC-05pd-0873
KENNEDY SPACE CENTER, FLA. -  As part of pre-pack and fit check for Terminal Countdown Demonstration Test (TCDT) activities, STS-114 Mission Specialist Stephen Robinson signals okay for his launch suit check.  The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad.  STS-114 is the first Return to Flight mission to the International Space Station.  The launch window extends July 13 through July 31.
KSC-05pd-0878
KENNEDY SPACE CENTER, Fla. --   STS-108 Commander Dominic L. Gorie gets help with his helmet during suit and pre-pack fit check.  Gorie and other crew members are preparing to take part in a simulated launch countdown, part of Terminal Countdown Demonstration Test activities.  The TCDT also includes emergency exit training from the orbiter and launch pad. STS-108 is a Utilization Flight that will carry the replacement Expedition 4 crew to the International Space Station, as well as the Multi-Purpose Logistics Module Raffaello, filled with supplies and equipment.  The l1-day mission is scheduled for launch Nov. 29 on Space Shuttle Endeavour
KSC-01pp1677
KENNEDY SPACE CENTER, Fla. --  STS-108 Pilot Mark E. Kelly undergoes suit and pre-pack fit check prior to taking part in a simulated launch countdown.   Kelly and other crew members are at KSC for Terminal Countdown Demonstration Test activities that also include emergency exit training from the orbiter and launch pad. STS-108 is a Utilization Flight that will carry the replacement Expedition 4 crew to the International Space Station, as well as the Multi-Purpose Logistics Module Raffaello, filled with supplies and equipment.  The l1-day mission is scheduled for launch Nov. 29 on Space Shuttle Endeavour.
KSC-01pp1678
KENNEDY SPACE CENTER, FLA. -  As part of pre-pack and fit check for Terminal Countdown Demonstration Test (TCDT) activities, STS-114 Mission Specialist Soichi Noguchi tries on his launch suit.  The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad.  STS-114 is the first Return to Flight mission to the International Space Station.  The launch window extends July 13 through July 31.
KSC-05pd-0870
During pre-pack and fit check on his launch and entry suit, STS-92 Commander Brian Duffy adjusts his helmet. Duffy and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be Duffy’s fourth Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC-00pp1340
The “rookie” on the STS-92 mission, Pilot Pamela Ann Melroy has her new launch and entry suit adjusted during pre-pack and fit check in the Operations and Checkout Building. Melroy and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC-00pp1337
During pre-pack and fit check, STS-92 Commander Brian Duffy tests his launch and entry suit for comfort and ease while sitting. This mission will be Duffy’s fourth Shuttle flight. He and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC00pp1342
During pre-pack and fit check on his launch and entry suit, STS-92 Commander Brian Duffy adjusts his helmet. Duffy and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be Duffy’s fourth Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC00pp1340
During pre-pack and fit check, STS-92 Commander Brian Duffy tests his launch and entry suit for comfort and ease while sitting. This mission will be Duffy’s fourth Shuttle flight. He and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC-00pp1342
The “rookie” on the STS-92 mission, Pilot Pamela Ann Melroy has her new launch and entry suit adjusted during pre-pack and fit check in the Operations and Checkout Building. Melroy and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC00pp1337
KENNEDY SPACE CENTER, FLA. -  As part of pre-pack and fit check for Terminal Countdown Demonstration Test (TCDT) activities, STS-114 Mission Specialist Stephen Robinson has various elements of his launch suit and helmet checked.  The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad.  STS-114 is the first Return to Flight mission to the International Space Station.  The launch window extends July 13 through July 31.
KSC-05pd-0880
During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan gets an adjustment on his launch and entry suit. This mission is Wakata’s second Shuttle flight. He and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC-00pp1341
During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist Michael E. Lopez-Alegria tries on the helmet for his launch and entry suit. Lopez-Alegria and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be Lopez-Alegria’s second Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC-00pp1338
During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist Michael E. Lopez-Alegria tries on the helmet for his launch and entry suit. Lopez-Alegria and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be Lopez-Alegria’s second Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC00pp1338
During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist William S. McArthur Jr. uses a laptop computer while garbed in his full launch and entry suit. McArthur and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be McArthur’s third Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC00pp1339
During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan gets an adjustment on his launch and entry suit. This mission is Wakata’s second Shuttle flight. He and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC00pp1341
During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist William S. McArthur Jr. uses a laptop computer while garbed in his full launch and entry suit. McArthur and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be McArthur’s third Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
KSC-00pp1339