CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, the Ulysses spacecraft with two attached upper stages –- a payload assist module and an inertial upper stage -- is transferred into the payload canister. Transport from the Vertical Processing Facility to the Payload Changeout Room at the Launch Pad 39B was scheduled for Aug. 27, 1990. The payload will be vertically installed in the cargo bay of the space shuttle Discovery after the shuttle is brought to the pad in September. Ulysses will be deployed during STS-41, set for a launch period extending from Oct. 5 through Oct. 23, 1990. Photo Credit: NASA
Album Kennedy_History