Artemis I Prelaunch

An alligator is seen in a pond outside of Launch Pad 39B as NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is reflected in the water, Friday, Sept. 2, 2022, at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for Sept. 3 at 2:17 p.m. EDT. Photo Credit: (NASA/Bill Ingalls)

An alligator is seen in a pond outside of Launch Pad 39B as NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is reflected in the water, Friday, Sept. 2, 2022, at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for Sept. 3 at 2:17 p.m. EDT. Photo Credit: (NASA/Bill Ingalls)

Photographer NASA/Bill Ingalls
Album Artemis_I